The proposed development will consist of: The construction of five logistics / warehousing units (Units 1 - 5) with associated office accommodation, service yards, ancillary structures/areas, and substations. The overall floor area of the proposed logistics / warehousing units is c. 56,932 sq.m (Gross Internal Area (GIA)) with a total of c. 4,336 sq.m of office space. See following breakdown of each unit: Unit 1 will comprise GIA c. 10,432 sq.m (including c. 579 sq.m of associated office space) and measures c. 17.9m from finished floor level (FFL) to roof ridge; Unit 2 will comprise GIA c. 18,065 sq.m (including c. 1,005 sq.m of associated office space) and measures c. 18.4m from FFL to roof ridge; Unit 3 will comprise GIA c. 6,325 sq.m (including c. 579 sq.m of associated office space) and measure c. 17.4m from FFL to roof ridge; Unit 4 will comprise GIA c. 8,762 sq.m (including c. 484 sq.m of associated office space) and measures c. 17.6m from FFL to roof ridge; Unit 5 will comprise GIA c. 13,348 sq.m (including c. 1,689 sqm of associated office space) and measures c. 17.8m from FFL to roof ridge; Access to the site will be from the existing roundabout to the south of the site; Provision of no. 419 car parking spaces and 172 bicycle spaces to serve the proposed development; Associated works for the diversion of the existing foul sewer within the site; The provision of attenuation basins / wetlands across the site; Associated works for re-routing of the existing ESB overhead wires which traverse the site to underground cables within the site; The formation of plateaus on the site with surplus excavated material to allow for the future Phase 2 development and; All ancillary landscaping, boundary treatments, internal roads and roundabout, cycle / pedestrian paths, associated infrastructure, and site development works to support the development
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Site within the townlands of, Gollierstown and Milltown, (west of Grange Castle Business Park & The Adamstown Road (R120)), Newcastle, Dublin
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
12% of nearby decided applications were refused. The preview found 1,951 nearby planning records within 5 km where a location match is available.
- Matched source
- SD23A/0301
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
No reasons on record yet
Open preview
Nearest similar decisions
The proposals will comprise of amendments to Units 2, 3 and 4, permitted under Reg. Ref.: SD23A/0301. The proposed development will consist of: Unit 2 Reconfiguration of permitted substation; Reconfiguration of car parking layout; Unit 3 Reconfiguration of the layout of the unit resulting in a reduction of floor area from 6,325 sq.m GFA (including 579 sq.m of associated office space) to 4,386 sq.m GFA(including 831 sq.m of associated office space); Reconfiguration of the car park area to provide an increase in the total number of car parking spaces from 50 no. spaces to 68 no. spaces including 14 EV charging spaces. Reconfiguration of the service yard area including: Increasing the service yard area to the east of the Unit 3 building. Relocation of the service yard entrance from east side of plot to south side of plot; Provision of 132 no. delivery van spaces with EV charging for all van spaces. Relocation of external facilities including bin store, water tank, condensers and PV battery area. Relocation of the bicycle parking area and a reduction from 32 no. spaces to 22 no. spaces; The unit will be served by 2 no. dock level loading bays and 1 no. level access loading bay; Amendments to the elevations to accommodate the changes to the layout of the unit and the provision of signage on the elevations; Omission of internal roundabout and revisions to the internal road layout; Provision of a new pedestrian crossing; Relocation of permitted substation; Amendments to the permitted attenuation ponds; Omission of the permitted fire tender access along the western boundary of the plot and; Increase in unit's finished floor level from 67.800m to 68.200m Unit 4 Relocation of permitted substation; Reconfiguration of carpark and bike parking layout (no change to permitted number of parking spaces). All associated infrastructure, road markings, totem signs, signage, Corten wayfinding, boundary treatments, landscaping and site development works.
The proposed development will consist of: Reconfiguration of the layout of Unit 5 resulting a slight decrease in the total GFA from 13,348 sqm to 12,650 sqm. The warehouse floor area of the unit will increase from 11,137 sq.m to 11,509 sq.m GFA and the associated office space will decrease from 1,689 sq.m to 994 sq.m; Reconfiguration of the service yard area including: Decreasing the service yard area to the north and west of the Unit 5 building; Relocation/reconfiguration of the service yard entrance; Omission of the permitted outbuildings in the service yard; Provision of updated landscaping with attenuation pond to the north of the building and service yard; Amendments to the western elevation to accommodate the changes to the layout of the unit; Reconfiguration of the bicycle parking area resulting in a reduction from 70 no. spaces to 64 no. spaces; Omission of the permitted tenant signage to Unit 5 and; All associated site development works.
The proposals will comprise of amendments to Unit 7 (K78 V6TY) constructed under Reg. Ref.: SD23A/0301 (as amended by Reg. Ref.: SD24A/0224W and SD25A/0011W). The proposed amendments will consist of: • Change of use from logistics/warehousing to logistics/warehousing/light - industry to accommodate a manufacturing use; • Reconfiguration of the layout of the unit resulting a slight increase in the total GFA from 12,650 sqm to 13,333 sqm. The warehouse floor area of the unit will decrease from 11,509 sqm GFA to 10,652 sqm of manufacturing floor area for the new use and the associated office space will increase from 994 sqm to 2,518 sqm; • Amendments to the elevations to accommodate the changes to the layout of the unit; • Provision of a canopy at the entrance of the building on the southern elevation and a new outdoor terrace (c. 110 sqm) to the south of the unit; • Reconfiguration of the car parking spaces to the south of the unit and provision of a new overflow car parking area to the west of the service yard; • A total of 213 no. car parking space will be provided to serve the development; • New entrance to overflow car park from internal link road to the south; • Provision of 10 no. van spaces to the south west corner of the service yard; • Installation of a containerised generator within the service yard area; • Provision of new tenant signage on south elevation: • Relocation of existing signage on the south elevation to the east elevation; • Provision of carpark totem to overflow parking; • Provision of additional PV panels at roof level and; • All associated site development works and landscaping works
Enabling works to facilitate the future development of the site; topsoil strip and a cut and fill operation across the site; temporary construction access will be created off the R120 to facilitate the works within the townland of Ballymakaily to the west of the Newcastle Road (R120).
Permission for development at this site within the townland of Ballymakaily to the west of the Newcastle Road, Lucan, Co. Dublin. The development will consist of amendments to the permitted development as granted under SDCC Planning Ref. SD19A/0042 that will include: - Reduction in the number of back-up generators, flues and other related plant from 32 to 24 within the permitted generator compound located to the west of the data centre granted under SDCC Planning Ref. SD19A/0042; and - Repositioning of the 24 no. back-up generators, flues and other plant within the permitted generator compound.
Source match
Matched from public planning record SD23A/0301The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report