The removal of the existing fence and vegetation. The construction of a new single - storey ESB substation (15.2 MS) Raising the grade outside the substation entrance, the erection of a new replacement security fence. And all associated landscaping and site development works
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Greenview, Greenhills Road, Dublin 12, D12 FP23
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
12% of nearby decided applications were refused. The preview found 7,588 nearby planning records within 5 km where a location match is available.
- Matched source
- SD24A/0293
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
No reasons on record yet
Open preview
Nearest similar decisions
Retention for change of use from light industry/warehousing to office (Class 3, of Schedule 2, Part 4 of the Planning and Development Regulations 2000-2019); ancillary security call centre; storage area for the provision of security monitoring and surveillance services; staff canteen; office and meeting rooms; stair core; lift; reception area; lobby; business identification signage and ancillary internal changes and site works; physical subdivision of Unit G9 into two separate levels (Ground Level and Level 1) and amalgamation of Unit G9 (Level 1) with G10 to create a single commercial unit; construction of an internal concrete floor at Unit G10 to create a full mezzanine floor within the unit (and additional floorspace area of 161sq.m approximately).
Retention of Change of Use from Light Industry / Warehousing and Ancillary Office to Office, and Retention of Amalgamation of Unit E1 (total G.I. area of 317.40m²) with Unit E14 (total G.I. area of 294.50m²), to achieve a total amalgamated area of 617.4m², all located at Block E, Calmount Park, Ballymount, Dublin 12, D12 X854.
Retain car dismantling facility; retain necessary sheds; retain car body crusher (some existing unauthorized sheds will be demolished); erect new entrance and road boundary fence; install CP20BP interceptor; necessary drainage and associated site works.
Construction of 6 warehouse units with associated offices, associated signage for each unit, boundary treatment, associated drainage and ancillary siteworks.
Partial demolition of existing rear and side extension; construction of new rear and side extension with a new flat roof over the existing and new extension.
Source match
Matched from public planning record SD24A/0293The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report