Free preview / €49 incl. VAT full PDF

Planning precedent report

Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.
See sample PDF
Opens secure checkout for the €49 incl. VAT full PDF report.Have a code? Enter it at checkout.
€49 incl. VAT once-off PDF, no account required
Refund requests are reviewed under the published refund policy
Derived from public planning records and linked source documents
PlanIntelPlanning precedent preview

Planning precedent report

In the townlands of Finnstown & Gollierstown, Lucan, Co, Adamstown, DUBLIN

One-off house / within 5 km where a location match is available

Preview

Local planning pattern

11% of nearby decided applications were refused. The preview found 1,710 nearby planning records within 5 km where a location match is available.

Matched source
SDZ24A/0027W
Project type
One-off house
Coverage
5 km radius
1,710Nearby applications
11%Refused
1,525Conditional grants
0Refusal reasons

Top refusal reasons nearby

No reasons on record yet

More refusal reasons are being processed from public planning records.

Nearest similar decisions

SDZ24A/0027W

The development will consist of the development of "Central Boulevard Park" (one of four main parks proposed for the Adamstown SDZ). Works will involve detailed landscaping (hard and soft) of the new Park including provision of the following: · A variety of play areas (including Toddler Play Area, Teen Space (with basketball half-court and informal seating), Play Hillock, Earth Mounded Play Areas with Natural Play Elements). · Calisthenics area. · Flexible lawn spaces. · Seating and street furniture. · Bicycle parking (covered and uncovered). · SuDs features. · Retention of existing hedgerows and Oak tree within the application site with provision of new bridge link through the main hedgerow. Additional native hedgerow, tree and ornamental planting. · Paving, new accesses, and boundary treatments. · All associated site development, landscaping and services works to facilitate the development. The development will also comprise amendments to extant permission Ref. SDZ23A/0026 (as amended by Ref. SDZ24A/0011) to facilitate an integrated shared entrance plaza between the new park and the adjoining Aderrig 4 development to the north (and as per Condition 7 of Ref. SDZ23A/0026).

Granted0.0 km04 December 2024
SDZ23A/0007

Construction of a ground floor extension consisting of a playroom and bedroom to rear of existing house.

Granted0.1 km24 April 2023
SDZ24A/0011

Amendments to a previously permitted development (Reg Ref SDZ23A/0026, known as 'Aderrig Phase 4') at a site of approximately 2.16 HA in the townland of Finnstown, Adamstown, Lucan, Co. Dublin. The site is generally bound as follows: to the east by the Adamstown Boulevard and planned Central Boulevard Amenity Area; to the south by Adamstown Way' to the west by Aderrig Avenue (beyond which is Aderrig Phase 1); and to the north by Airlie Park Road (beyond which is Aderrig Phase 1); and to the north by Airlie Park Road (beyond which is Arlie Park Amenity Area ). This application is being made in accordance with the Adamstown Planning Scheme 2014 (as amended) and relates to proposed amendments to Phase 4 of development within the Aderrig Development Area of Adamstown Strategic Development Zone. The proposed development will principally consist of the following amendments to the previously permitted development, and includes 5 No. additional apartment units (1 No. studio, 2 No. 1-bed and 2 No. 2-bed), thereby increasing Aderrig Phase 4 from 350 No. units to 355 No. units, with gross floor area decreasing by 49 sq.m: At Block A - omission of the internal residential amenity space at ground floor level and addition of 3 No. apartment units (1 No. 1-bed and 2 No. 2-bed) with west- and south- facing terraces, as well as minor changes to the internal circulation; omission of communications room in the undercroft and enlargement of car parking space; reconfiguration of rooftop plant; and changes to the landscaping and open space to the south of Block A. At Block B - omission of the standalone generator/sub-station/meter room building in the centre of the Block; omission of the sprinkler tank room and addition of 1 No. apartment unit (1-bed) with west-facing terrace in the previous location of the cycle store; relocation of ground floor level terrace of Unit B-06 from northern elevation to eastern elevation; reconfiguration of the internal access and parking layout (no net loss of spaces); and changes to the landscaping within the central communal amenity space area. At Block C - omission of the ground floor level water tank room and addition of 1 No. apartment unit (studio) with east-facing terrace; redesign and reconfiguration of the standalone cycle store/sub-station/generator building, which will now comprise of a cycle store/sub-station-switch room building; omission of the ground floor level sprinkler tank and increase in area of 1 No. apartment unit to facilitate a change from it being 1-bed to 2-bed; and changes to the landscaping within the central communal amenity space area. the development will also include: changes to elevations to accommodate the above amendments; changes to cycle parking layouts, including an increase in provision of 12 No. spaces; changes to the proposed taking in charge areas; and all associated site and development works above and below ground.

Granted0.1 km20 June 2024
SDZ23A/0026

Construction of 350 No. residential apartment units (6 No. studios, 169 No. 1-bed and 175 No. 2-bed) set out in 3 No. blocks (A, B, C) ranging in height from 1 No. to 7 No. storeys. The development will also include: internal residential amenity space (Block A); vehicular junctions and internal road, cycle and pedestrian network; minor alterations to the south-east junction with Adamstown Way (previously permitted under Aderrig Phase 1 (Reg. Ref. SDZ20A/0017) adjacent to the planned Central Boulevard Amenity Area; 210 No. car parking spaces; cycle parking (including standalone cycle store at Block C); bin storage areas; plant (inc. standalone plant buildings at Blocks B and C); hard and soft landscaped areas including public, communal and private open space areas (with balconies and terraces facing all aspects); boundary treatments; public lighting; 3 No. sub-stations; rooftop PV arrays; and all associated site and development works above and below ground.

Granted0.1 km28 November 2023
SDZ22A/0012

Change of Use from existing four-storey Office building to a Health Centre, including associated minor internal layout revisions (2,987sq.m GFA); Amendments to elements of existing external facade of building including removal of glazed facade at ground, first and second floor level and replace with part clad/part glazed facade and replacement of ground floor timber cladding on eastern ground floor elevation with cladding; A new single storey bin store (c. 30 sq.m GFA); 21 surface level bicycle parking spaces; Alterations to the existing Adamstown Boulevard road consisting of relocation of cycle lane and footpath to allow for the creation of emergency vehicle set down and layby area associated with the Health Centre; All associated and ancillary site development and landscape works On lands generally bounded by Adamstown Boulevard to the west; Adamstown Avenue to the south; residential units in the Stratton development to the north and Stratton Way to the east; This application is being made in accordance with the Adamstown Planning Scheme 2014, as amended and relates to a proposed development within the Adamstown Strategic Development Zone Planning Scheme Area, as defined by Statutory Instrument No. 272 of 2001.

Granted0.1 km03 October 2022
SDZ22A/0002

Pitched roof first floor extension to rear and all associated site works.

Granted0.2 km25 April 2022

The full report covers all 1,710 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.

The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.

Policy and design risk

Full PDF

Source document extracts

Full PDF

Comparable decision table

Full PDF

Submission strategy

Full PDF
Ready to generate the full report?€49 incl. VAT once-off PDF, no account required