Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
12% of nearby decided applications were refused. The site check found 4,450 decisions within 5 km, 3 exact-site or onsite candidate records, and 1157 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matched1 of 2 layers are loaded for South Dublin County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for South Dublin County Council, so this brief makes no current policy claim and relies on decision history.
3 of 4 layers are loaded for South Dublin County Council and were intersected with the site; flood is not loaded and no conclusion is drawn for it.
3 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
1157 structured nearby appeal records.
1,157 matchedCitations are current-dated and carry policy name, section, page and source URL from the South Dublin County Council development plan.
1 matchedOpen preview
Open preview
Mixed use scheme which consists of: (a) 252 residential units in 3 blocks made up of 247 apartment/duplex units within 2 2-8 storey blocks (1 of which is over podium car park) comprising 119 one bed units, 125 two bed units, and 3 three bed units; 5 2 storey, three bed semi-detached/terraced house; all of the residential units will have associated private open space/balconies/terraces facing north/south/east/west; (b) a separate non-residential block measuring (total floor area c. 1118sq.m) and will comprise a creche (c.430sq.m), retail unit (c. 269sq.m), gym (c.152sq.m), community room (c. 231sq.m), and concierge (c. 36sq.m). The development will have 225 car parking spaces (145 spaces at under croft level, 70 spaces at surface level and 10 spaces at the 5 houses), 5 motorcycle parking spaces and 308 secure bike parking spaces. The site is accessed through the existing vehicular access to the west, off the unnamed road to the west. There will be a number of pedestrian entrances along St. Lomans Road, the Fonthill Road (R113) and the unnamed road to the west. In addition to all the new facilities all other site services and works to enable the development of the site will also be provided including site, bin stores, ESB substations, associated roadworks and services connections, a large quantity of public and communal open space, boundary treatment works and landscaping.
Modifications to the previously permitted Strategic Housing Development granted on the subject site (Reg. Ref. ABP-305857-19), which is currently under construction. The proposed development will provide for amendments to the permitted development as follows: • Permitted Block 1 increased in height by 1 storey and will now comprise 235 apartments in total (an increase of 21 from the permitted 214) • Permitted Block 2 layout will be reconfigured, and increased in height by 1 storey, and will now comprise 34 apartments (an increase of 1 from the permitted 33) • Replacement of permitted Block 3 (a terrace of 5 2 storey, 3-bed houses) with a new 4-5 storey apartment block comprising 28 apartments (an increase of 23 from the permitted 5) • Replacement of permitted Block 4 (a 3 storey commercial block comprising creche, gym, retail unit, community room and concierge) with a 2-5 storey block comprising 16 apartments, creche and residential amenity space (providing a gym, co-working space, a multi-use room, kitchenette and reception). The overall development, as modified, will increase from 252 permitted residential units (comprising 247 apartments/duplexes and 5 houses) to 313 apartments in four blocks (an increase of 61 units) and including 137 1-beds, 171 2-beds and 5 3-beds. The building height will now range up to 9 storeys (previously up to 8 storeys). All apartments will have associated private balconies/terraces to the north/south/east/west elevations. Permitted parking will be revised to now provide 214 car parking spaces (a decrease of 11 spaces) and 378 bicycle parking spaces (an increase of 70 spaces). All associated site services and works to enable the development including bin stores, ESB substations, associated roadworks and services connections, public and communal open spaces, vehicular access, pedestrian/cyclist connections, boundary treatment works and landscaping.
A 3m high 'lamp post' style relief vent stack servicing the existing above ground natural gas pressure reduction unit with all ancillary services and associated site works.
2 storey Recreation Facility (1800sq.m), associated roof plant enclosure. 3 (2m x 2m) wall mounted external signs and such associated external site works on existing carpark area to the north of existing Arc Bar and Restaurant buildings.
Special needs unit prefab building.
Permission for Retention of rear single storey extension consisting of bedroom, kitchen, Dining room accommodation & associated site works at No 6 St Edmunds Park, Ballydowd, Lucan, Co. Dublin, K78 ED89.
The brief summarizes the pattern across all 4,450 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief