Executive snapshot
3% of nearby decided applications were refused. The site check found 415 decisions within 5 km, 4 exact-site or onsite candidate records, and 20 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
20 structured nearby appeal records.
20 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
A) construction of a new part 2-storey, part single-storey detached dwelling; b) new detached garage; c) new site entrance; d) new connection to existing public utilities; e) new waste-water treatment system & percolation area; f) all associated site works
Dwelling, garage, wastewater treatment system, entrance and all associated site works - previous reference no. 13510162
A new 2 storey multifunctional spectators stand (capacity of 1000ppl) located between new pitches consists of 3 full sized pitches (GAA size),1no grass pitch (east of stand) & 1no. synthetic multi-functional pitch (west of stand) to allow 2no lateral soccer pitches on the main pitch; 1no. grass pitch to the north of the site;all pitches to be flood lit to relevant standards; northern grass pitch to have a 3m high privacy perimeter fence, all pitches to have ball stop netting to each goal and 1.2m spectator fence; multifunctional pitch to allow for ball stop netting for soccer games played lateral across the pitch; a Jogging track around the perimeter of the pitches with exercise stations and rest areas, the track will be 3m wide with associated lighting; access road for emergency and maintenance vehicles to the east boundary of east grass pitch up to the northern pitch; 1no multi-sport training area to include a synthetic surface (40x45) with rebound wall 5m high and protection fencing with ball stop netting to top of protection fence around perimeter to be flood lit to relevant standards; addition of an internal Mezzanine level to existing sports lab of 221m2 and new 2 storey extension to the east elevation of the existing sports lab includes administrative areas, meeting rooms and changing rooms to facilitate the campus; a new tennis center including a two storey clubhouse and associated courts, changing areas and spectator zones; PV panels to be allowed for on roof of sports lab, Tennis Centre and spectators stand; 2.4m high fence to secure pitch areas with access from main campus; all associated site works including drainage arrangements and landscape works; a new ESB substation, boundary treatments and upgrades provision for 10 coach parking spaces, 10 additional car parking spaces, 5 additional accessible parking spaces and 10 motorcycle spaces, 2no. covered secure bicycle stores and grounds keepers Store In addition the relocation of existing storage unit on site (133.6m2); all on a site area of 9.8ha.This application is accompanied by a Natura Impact Statement
10 Year Permission for 2 no new grass pitches (GAA size); 1 no new 3G (synthetic surface) multi-functional sports area (GAA size) with associated floodlighting mounted on 9 no 21.34m high columns with a range of 12-20 no. floodlights per column; 3m high fencing around pitch perimeters; 5m high fencing behind soccer goal areas; 16m high ball nets to rear of GAA goal areas, 2 no new outdoor tennis courts with associated 3m high perimeter fencing around the southern, eastern & northern perimeter of the courts with associated floodlighting mounted on 4 no. 10m high columns with 2 no floodlights per column; a 6m high by 37m long hurling wall along the western perimeter of the tennis courts; provision of mezzanine floor (221m2 gfa) within existing Strength & Conditioning building; 1 no ESB substation (23m2); attenuation tank (1700m3); all ancillary site development and landscape works, including re-grading of pitch areas and associated landscaping and boundary treatments, including running track around perimeter of proposed pitches; provision of additional 21 no carparking spaces. Proposed vehicular access is via existing vehicular entrance from R498 Nenagh Road and it is proposed to use the existing surface car park area serving existing campus; access for coach parking associated with the playing facilities will be via the existing entrance serving Thurles Chamber Enterprise Centre off the Jimmy Doyle Road; all on a site of 16.2Ha. This application is accompanied by a Natura Impact Statement
A). construction of 2 no. tennis courts with 8 no. 12m LED floodlights, b). to construct a central practice court/children's area with lightweight tensile roof/cover and viewing area at both sides of court, c). to construct tennis practice walls, d). to construct equipment storage sheds, e) to construct 2.4m high powder coated “Paladyn” type fencing with access gates and all associated site works
The temporary storage containers on site and PERMISSION for change of design of previously granted store shed, which consists of increase footprint/area and alterations to elevations of previously granted store shed, including all ancillary site works. This store shed was previously granted permission under planning permission ref. no. 2560292
The brief summarizes the pattern across all 415 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 17601220The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.