Applications tied to the site
Partial coverage5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
8% of nearby decided applications were refused. The site check found 304 decisions within 5 km, 5 exact-site or onsite candidate records, and 19 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
19 structured nearby appeal records.
19 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
To build a new single storey shower room extension to residence off existing ground floor bedroom and all associated site works
Single storey extension as constructed to the side of residence and vehicular entrance
The demolition/removal of external stairs and detached buildings to build an extension to the rear of the building with car parking and new access. The extension will consist of a part single part two storey building. It will be located to the north of the existing college and will have a flat roof. It will include classrooms and ancillary uses at ground level, a new entrance foyer, fire escape stairs, lift and will also include fire escape from the existing building and staff facilities at first floor level. The development will include a new car park and entrance to the rear (North) with access from St. Nicholas Park. The existing vehicular entrance will be widened. The development will include all associated site works, landscaping and services. The landscaping will include soft and hard surfaces, ramps and steps, a new deck area to the west of the existing building, a new courtyard area with a podium adjacent to the new entrance and covered bicycle parking
Indefinite retention of as built conversion from garage to bathroom at side of house on ground floor level
A) the 2-storey extension to the rear, b) the change to the rear boundary, c) alterations to the front porch, d) the as constructed shed to rear of property
Kitchen extension to the East side
The brief summarizes the pattern across all 304 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 18600713The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief