Applications tied to the site
Partial coverage9 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
9 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
8% of nearby decided applications were refused. The site check found 301 decisions within 5 km, 9 exact-site or onsite candidate records, and 19 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
9 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
9 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
19 structured nearby appeal records.
19 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Indefinite retention of as built conversion from garage to bathroom at side of house on ground floor level
A) the 2-storey extension to the rear, b) the change to the rear boundary, c) alterations to the front porch, d) the as constructed shed to rear of property
The demolition/removal of external stairs and detached buildings to build an extension to the rear of the building with car parking and new access. The extension will consist of a part single part two storey building. It will be located to the north of the existing college and will have a flat roof. It will include classrooms and ancillary uses at ground level, a new entrance foyer, fire escape stairs, lift and will also include fire escape from the existing building and staff facilities at first floor level. The development will include a new car park and entrance to the rear (North) with access from St. Nicholas Park. The existing vehicular entrance will be widened. The development will include all associated site works, landscaping and services. The landscaping will include soft and hard surfaces, ramps and steps, a new deck area to the west of the existing building, a new courtyard area with a podium adjacent to the new entrance and covered bicycle parking
To build a new single storey shower room extension to residence off existing ground floor bedroom and all associated site works
A change of use of first floor of existing building from retail storage to residential to accommodate the provision of 1 no. self-contained 2 bed apartment, removal of pitched and flat roof with window and velux rooflights to the front, construction of a flat roof to rear to accommodate of a roof terrace and all associated site boundary and site development works
1. (a) the external refrigeration unit at ground floor level (b) Retention planning permission to retain indefinitely the roof as is constructed, which differs from that as granted planning permission under Ref no. 21/1075. 2. Planning permission for providing double doors (replacing existing single doors) giving access from the upper floor residential unit to the external single storey flat roof to the rear and the erection of a 2M high screen “wall” in vertical hit and miss composite screens/panels, fixed in metal columns plated and bolted to the top of the existing ground floor wall and extending around the open periphery of the flat roof to the North-West side and to a section to the North-East side. The remaining periphery of the flat roof will have similar boundary but 1250mm high
The brief summarizes the pattern across all 301 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 19600089The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief