Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
3% of nearby decided applications were refused. The site check found 119 decisions within 5 km, 2 exact-site or onsite candidate records, and 1 structured appeal.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matched1 of 2 layers are loaded for Tipperary County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Tipperary County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Tipperary County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
1 structured nearby appeal record.
1 matchedNo current-dated citation is loaded for Tipperary County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
1 no. 10m high flood light at existing hurling wall including green wire fencing here 2.1m high, also to retain 1 no. 8m high flood light at existing car parking area, also to retain 4 no. ball-stopping nets 12m high on playing pitches. Planning Permission to construct a new covered spectator setting stand The development is also to include new player changing rooms and public toilet facilities pavilion, 2 no. new 20m high flood lights at playing pitch no. 1, 2 no. new 8m high flood lights at existing car parking area, connect to all existing services and all associated site works
Construction of lighting to the previously approved pedestrian walkway (granted under planning reference no. 2560604) and all associated site development works
Construction of a pedestrian walkway, associated site grading and all associated site development works
Decommission existing septic tank and effluent treatment system serving our medical centre and private dwelling, and to construct a pump chamber with pumped rising main and connection to the local authority foul sewer
The construction of a two storey dwelling house, single storey domestic garage, new site entrance to Pike Street R689 public road, provision of connection to existing wastewater pumphouse and all associated site developments works
A) a garage conversion to the side of the house, b) changes to the house elevations, c) a change of use of a doctor’s surgery to domestic use and d) a domestic shed
The brief summarizes the pattern across all 119 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 19600932The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief