Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
11% of nearby decided applications were refused. The site check found 336 decisions within 5 km, 2 exact-site or onsite candidate records, and 15 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
15 structured nearby appeal records.
15 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
The development will consist of the construction of 2.99acres/1.21ha or 1.6MW of Photovoltaic panels on ground mounted frames within a site area located to the south of the main production facility, associated ancillary cabling and ducting, electrical infrastructure, LV/MV Skid, transformer cabin and internal access tracks together with all associated site works.
ERECT A NEW 2.4M HIGH PALADIN FENCE TO ENCLOSE THE PERIMETER OF THIS SITE, NEW INTERNAL ACCESS TRACK TOGETHER WITH ALL ASSOCIATED SITE WORKS
UPGRADE WORKS TO INCLUDE DEMOLITION OF EXISTING RECEPTION ANNEX AND THE CONSTRUCTION OF A NEW REPLACEMENT RECEPTION TOGETHER WITH ALL ASSOCIATED SITE WORKS.
CONSTRUCT A NEW RECEPTION EXTENSION AT GROUND FLOOR, NEW EXTENSION AT FIRST FLOOR ON THE EAST ELEVATION OF THE EXISTING FACILITY, INFRASTRUCTURE INCLUDING CAR PARKING AND ALL ASSOCIATED SITE WORKS
CONSTRUCT SUSPENDED FLOORS AT FIRST FLOOR LEVEL WITHIN HIGHBAY SECTIONS OF EXISTING BUILDINGS FOR PRODUCTION AND PLANT ROOM USES AT ITS PLANT
CONSTRUCT A TWO-STOREY EXTENSION AT THE NORTHERN SIDE OF THE MAIN PRODUCTION BUILDING TO ACCOMMODATE AN ENCLOSED STAIRWELL AND TO CARRY OUT ASSOCIATED EXTERNAL WORKS AT ITS PLANT
The brief summarizes the pattern across all 336 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2360423The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief