Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
8% of nearby decided applications were refused. The site check found 1,920 decisions within 5 km, 3 exact-site or onsite candidate records, and 178 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
178 structured nearby appeal records.
178 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Development that will consist of: (1) The partial demolition of 1895sq.m of a building currently in use as the South Court Hotel and the construction of a 6 no. storey, 2 no. basement (a total of 8 levels) mixed use development on a 0.935ha site, which will be comprised of the following: (a) 84 no. residential apartments comprised of: (i) 42 no. 1 bed apartments; (ii) 39 no. 2 bed apartments; (iii) 3 no. 3 bed apartments. (b) 1 no. Childcare facility (139 m²) and as well as dedicated secure open space (111.35 m²); (c) The provision of internal residential amenity areas (330 sq.m) at first floor level which includes a gym and library; (d) 2 no. retail units (Unit A: 1602 m², Unit B: 45m²) with customer and staff carparking (2687m²); (2) The development of a new 1 no. storey & 1 no. basement ‘Hotel Link’ between the South Court Hotel and the proposed mixed-use development (870sq. m.) to include hotel reception, café and seating area, commercial kitchen, staff welfare facilities and an extension to the existing ‘Cream Room’ Bar (107 m²); (3) The provision of 149 no. car parking spaces (79 no. residential spaces at basement level with 70 no. customer spaces provided at lower ground floor level); (4) The provision of bike parking for 170 no. residential and customer bicycles with additional secured staff bicycle parking facilities located at lower ground floor level; (5) The provision of site landscaping (1343 sq.m) which includes communal open space and play equipment; (6) Road upgrades to the existing site entrance and upgrades to the footpath along the R510, R526 and upgrades to the existing surface car parking on the northern portion of the subject site; (6) Erection of signage on building façade (43.2 sq.m); (8) All ancillary site development works. A Natura Impact Statement (NIS) has been prepared in respect of the proposed development.
The installation of 857 sq. m. of solar panels on the roof of the existing building and all associated works. The application relates to 'relevant solar energy development' RED III development
Two Standalone Laundrette Kiosks and All Associated Site Works
1. Provision of extension to the existing hotel building with single storey link building to 4 storey primary care facility of 3,353 sq. metres gross floor area, 2. Associated site works including electricity sub station, new access road from Patrickswell Road (R526) and associated landscape works to include reconfiguration of car parking area and dedication of 120 car parking spaces for Primary Care Use, 3. Change of use of existing ground floor conference center (Part) to new use as Primary Care Centre to include a general medical practice clinic, consultation rooms, admin areas, treatment areas & pharmacy
Change of use and conversion of the existing attic space from offices to a residential apartment
Change of use of part of the ground floor (305sqm) and part of the first floor (296sqm) from office use to use as a healthcare facility. Works include the internal reconfiguration of these areas to accommodate the proposed healthcare facility use. It is proposed to provide 1 no sing of 4.46sqm at first floor level on the South East elevation. It is proposed to replace 2 no. ground floor windows panels with louvered panels, 1 no. on the North West elevation and 1 no. on the South East elevation. It is proposed to provide 2 no. bike stands, a clinical refuse area and a yellow box for emergency vehicles in the existing car park. At roof level it is proposed to provide 10 sqm of additional roof plant. These and all ancillary site works to facilitate the proposed change of use development
The brief summarizes the pattern across all 1,920 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2360703The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief