Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
5% of nearby decided applications were refused. The site check found 293 decisions within 5 km, 2 exact-site or onsite candidate records, and 9 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matched1 of 2 layers are loaded for Tipperary County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Tipperary County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Tipperary County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
9 structured nearby appeal records.
9 matchedNo current-dated citation is loaded for Tipperary County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
Further extraction of sand and gravel from an area of 1.82Ha within existing gravel pit using the existing entrance as granted under planning application reference number 22374 - and all associated site works
(i) previous extraction of sand and gravel (ii) existing entrance as well as planning permission to (iii) modify existing roadside boundaries to facilitate improved vehicular sightlines from the existing entrance and all associated site works
The continuance of use of the existing concrete batching plant (this concrete batching plant was previously granted for a 5 year period under Planning Application Reference Number 02/40 and extended for a further 10 year period under Planning Application Reference Number 07/1704
To construct an external connection corridor (along rear of existing dwelling house to the side of existing "Granny-Flat") and for retention permission for the existing "Granny-Flat" to the side of the existing dwelling house and all ancillary works
The following: (1) a sun room extension at side of original house; (2) a first floor window in north gable elevation; (3) three velux style roof windows in east facing roof slope; (4) the adjustment of fenestration at original entrance on west elevation; (5) a detached domestic garage; (6) and all associated site and ancillary works
The construction of a light engineering facility, including workshop with attached 2 storey buildings consisting of plant room, mechanical room, store, electrical room, ancillary toilets, canteen, locker room and offices. Other works as part of the development include new access road continuing from existing business park access road to serve the site, car parking, storm attenuation tank with hydro-brake, connection to public foul and storm water systems, landscaping, boundary treatment, signage and all associated site works
The brief summarizes the pattern across all 293 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 2361030The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief