Applications tied to the site
Partial coverage7 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
7 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
9% of nearby decided applications were refused. The site check found 685 decisions within 5 km, 7 exact-site or onsite candidate records, and 38 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
7 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
7 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
38 structured nearby appeal records.
38 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Fix (2 no. total) wall mounted brand identification signage (9.75 x 2.3m approx. each) and associated external lighting to the north-east & south-east elevations.
Construction of a 142.5 sq.m single story extension to the existing Value Centre facility to provide protection from the weather while loading and unloading goods
Development of a truck parking area with an office building, repair shed, overground fuel storage, perimeter fence and associated site works
Alterations to existing elevations, with the addition of a first floor window to the north & south elevations of the front façade. Permission is also sought to remove existing roller shutter door to the north elevation at the rear façade and replace with a fire door. Permission is also sought to add a mezzanine first floor level (298.6 sq m) to the interior of the existing building, which will include male and female toilets, changing rooms and showers, a staff room, office and fire stairs and all associated site works
Development consisting of an Electrical Vehicle (EV) Charging Station, site of 0.14Ha. The development will consist of 5 no. EV charging stations, 3 no. canopies incorporating approx. 17 sqm in area of solar panels per canopy, 1 no. disabled access public convenience (WC), 1 no. ESB substation, 1 no. SSE substation with new access to and egress form the site and all associated landscaping and above and below ground ancillary works
Development which will consist of: (a) The construction of a three-storey, multiple occupant building, capable of accommodating various enterprise users. The office use will be as described under class 3 of article 10 part 4 of the 2001 planning and development regulations. (b) Connection to existing services within the estate including foul, watermain and surface water drainage services. (c) The works will also include: provision of a new site entrance to the existing estate access road, modification of the existing footpath, new footpaths, paving, parking, boundary treatments, ancillary structures including bin stores, bicycle shelter and all associated site development works to complete the development
The brief summarizes the pattern across all 685 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 186121The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief