Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
14% of nearby decided applications were refused. The site check found 702 decisions within 5 km, 2 exact-site or onsite candidate records, and 47 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
47 structured nearby appeal records.
47 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Construction of a 3 storey extension to the existing Midlands Innovation and Research Centre, as part of the Athlone Institute of Technology Campus. The extension comprises of 919sqm of office/technology and innovation accommodation-located over 2 floors, which links through to the existing innovation and research building, with a screened enclosed plant area at the roof level. The proposed development includes relocation of the existing 12 no. car park spaces, and provision for 10 no. new car park spaces-both to be located to the rear of the site, 10 no. new bicycle spaces and associated site works and landscaping
Permission for the demolition of existing metal clad open storage area and the construction of a single storey flat roof Craft Apprentice Facility Classroom extension comprising two classrooms together with staff office and materials store circa 162 sq.m. total floor area, with roof mounted plant and parapet wall together with all associated site works
Construction of an on-grade car park to accommodate 160 car spaces including site lighting, drainage and landscaping with a modified vehicle and pedestrian entrance off the R916 comprising wider internal access ramp. The proposal also includes a pedestrian link between the existing controlled pedestrian crossing on the R916 and the main campus comprising an opening to be formed in the existing campus boundary wall, a stairs and ramp off the R916 and an internal campus footpath.
Permission for the existing waste facility (waste permit reference number: WFP-WM-2016-0004-01) including existing warehouse building (626.6sqm), weighbridge office (17.7sqm), site office (23.4sqm), two weighbridges, two electric stop barriers, staff carpark, portable toilets, existing access onto the Washhouse road, boundary walls and fencing, yard lighting and associated services
Development which will consist of a change of elevation to the above building, reconfiguration of existing classrooms and staff office and the provision of a new electrical workshop and PLC and Machine Lab. The works include alterations to the existing elevations and all ancillary site works
Extension of duration for demolition of the existing building on site and provision of a new Advance Technology Building. Permission is also sought for signage, car parking, cycle shelter, landscaping, underground water storage tank, ESB substation/switch room and all associated site works
The brief summarizes the pattern across all 702 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 187213The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief