Applications tied to the site
Partial coverage4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
8% of nearby decided applications were refused. The site check found 1,181 decisions within 5 km, 4 exact-site or onsite candidate records, and 92 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
92 structured nearby appeal records.
92 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Extension of Permission for Planning Ref. 14/860: to erect a single storey extension incorporating storage and toilet facilities to the rear of the existing main building including all ancillary site works
Development that includes; (a) Erection of a new palisade fence behind the existing hedgerow to the southern boundary of the Regeneron site, adjacent to Loughmore Avenue and to neighbouring sites. The fence perimeter length is approximately 680 metres and it is approximately 3 metres high. (b) Provision of an access point with gates within the new fence aligning with the existing access point from Loughmore Avenue. (c) Temporary works to include set down of construction materials, access for construction traffic, temporary site lighting and all associated siteworks for the erection of said fence. This application consists of development on landholding for which a licence under Part IV of the Environmental Protection Agency Act 1992 (as amended by the Protection of the Environment Act, 2003) is required
The construction of an extension to the front of unit, and all associated site works
Construction of first floor extension at the front of unit, with open area under, and all associated site works
Additions, alterations and modifications to the existing warehouse facility. They include; a) Proposed single storey firewater pumphouse sized approximately 108 square metres and approximately 6 metres high with 2 no. water storage tanks each sized approximately 10.2 metres high and approximately 6.5 metres in diameter. b) Proposed new canopy over dock area of existing facility. c) 2 no. proposed backup generator buildings each sized approximately 47 square metres and approximately 6.2 metres high with 2 no. associated flues fixed to existing building, each sized approximately 13 metres high with associated fuel store sized approximately 5 square metres and approximately 2.1 metres high. d) Proposed new perimeter palisade fence approximately 3 metres high with 5no. associated new entrance/exit gates. e) 3 no. proposed new ground mounted and illuminated monument signs and f) The works also include modifications to underground utilities, site lighting, internal roads and footpaths and all associated siteworks
The construction of a single storey light industry and warehousing building incorporating a two storey office area, also a single storey industrial storage building, and associated site works
The brief summarizes the pattern across all 1,181 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 197028The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief