Solar farm within a site area of approximately 39 hectares consisting of solar photovoltaic panels covering an area of up to 27.2 ha on ground mounted steel frames, 1 no on site substation, 8 no inverter / transformer stations, underground cables and ducts, boundary security fence, new internal tracks, CCTV cameras and all associated site services. Permission is sought for a period of 10 years
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Johnstown North , Co. Wicklow
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
14% of nearby decided applications were refused. The preview found 408 nearby planning records within 5 km where a location match is available.
- Matched source
- 171497
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
No reasons on record yet
Open preview
Nearest similar decisions
A 38KV grid connection cable and associated infrastructure to connect the approved Johnstown North solar farm (consented under planning ref. 171497) to the existing Arklow 220kV Substation comprising the laying of a 3,190m Underground Cabling (UGC) and associated infrastructure, located at Dublin Road, Arklow, Co. Wicklow
To amend the design of the approved development (Planning Reference: 17/1497) which comprises a Solar PV Energy Development. Proposed amendments include (1) change in location and size of substation, (2) two additional temporary construction compounds will be located at the site entrances, (3) the number of modules will decrease, (4) the number of pile driven poles will decrease, (5) the size and number of transformer stations will increase, (6) the total fencing area will increase (7) the total amount of fencing posts will increase, (8) up to 21 CCTV cameras will be installed (9) access tracks will be optimised and increased in width and length, and (10) increase in operational lifetime from 25 years to 35years
Demolition of existing storage shed, a new shed to serve as house ancillary storage and hobby shed to store vintage cars and associated site development works
Demolition of existing single storey shed and garage to rear, construction of new part single storey part storey and a half extension containing 2 dormer windows to rear, removal of existing septic tank and new replacement proprietary effluent treatment system and all associated site works
Construction of a bungalow with garage and car port, new entrance and access driveway, new treatment system and percolation area to current EPA standards and all ancillary site works
Source match
Matched from public planning record 171497The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report