To RETAIN change of use from residential part of building extension to existing office building along with RETENTION for additional car parking and site works to rear of property
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Kilrush Road , Ennis , Co. Clare
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
7% of nearby decided applications were refused. The preview found 1,086 nearby planning records within 5 km where a location match is available.
- Matched source
- 17881
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
No reasons on record yet
Open preview
Nearest similar decisions
To erect 1.0 metre high steel railing to the top of the existing masonry boundary wall to my property
To construct 2 no Semi-Detached Houses, provide a low dry-stone wall to the East and South to enclose sites, provide new site entrances, connect to public sewers and services and carry out all ancillary site works
Of development consisting of the retention of the rear entrance to the property accessing off Glen Gardens together with ancillary site works
For the proposed building upgrade works to, DSP Intro Office, Block 1, Government Buildings, Kilrush Road, Ennis, Co Clare. Works include: a) Replacement roof finish and rooflight; b) New PV panels to roof; c) New external wall insulation and render; d) Elevational changes to include new doors and entrance lobby screens; e) New service yard to the south-west of the building; f) Changes to the site layout to include EV charge points. All with associated site works
Of a masonry constructed outbuilding with metal profile roof to rear of existing dwelling
Source match
Matched from public planning record 17881The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report