Development of a single storey extension to the rear of existing dwelling house, comprising a bedroom, bathroom, study/studio and sitting room. Due to the rising land behind the existing house, the level of the finished floor of the new extension will be 2.7m above the finished floor level of the existing house
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Tomduff , Borris , Co. Carlow
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
2% of nearby decided applications were refused. The preview found 131 nearby planning records within 5 km where a location match is available.
- Matched source
- 20416
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
No reasons on record yet
Open preview
Nearest similar decisions
Erection of a dwelling house, domestic well, onsite waste water treatment system, percolation area and all associated site and landscaping works
Permission for the erection of an extension to the rear of an existing dwelling and permission for retention of existing extension to the side of existing dwelling
Existing main entrance as constructed and to retain the existing second entrance on site.(Previous planning reference no. 93/89) and all associated site works
Permission for part demolition of existing store and the erection of a two storey extension to existing dwelling, conversion of existing store into living room, new domestic well, onsite waste water treatment system, percolation area and all associate site and landscaping works
The demolition of an existing front and rear extension to existing cottage, the construction of a new two storey extension to the side of the existing dwelling house along with all associated site and landscaping works
Source match
Matched from public planning record 20416The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report