Free preview / €49 incl. VAT full PDF

Planning precedent report

Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.
See sample PDF
Opens secure checkout for the €49 incl. VAT full PDF report.Have a code? Enter it at checkout.
€49 incl. VAT once-off PDF, no account required
Refund requests are reviewed under the published refund policy
Derived from public planning records and linked source documents
PlanIntelPlanning precedent preview

Planning precedent report

Johnstown South , Arklow , Co. W icklow

One-off house / within 5 km where a location match is available

Preview

Local planning pattern

15% of nearby decided applications were refused. The preview found 480 nearby planning records within 5 km where a location match is available.

Matched source
211335
Project type
One-off house
Coverage
5 km radius
480Nearby applications
15%Refused
410Conditional grants
0Refusal reasons

Top refusal reasons nearby

No reasons on record yet

More refusal reasons are being processed from public planning records.

Nearest similar decisions

211335

Construction of a bungalow with garage and car port, new entrance and access driveway, new treatment system and percolation area to current EPA standards and all ancillary site works

Granted0.0 km04 March 2022
2560271

Construction of a bungalow with garage, a new entrance, a new treatment system and percolation area to current EPA standards and all ancillary site works

Granted0.2 km25 September 2025
2560361

Period of 10 years for a proposed solar farm and BESS (battery energy storage system) development which will consist of the construction of PV panels mounted on metal frames, inverters, battery storage infrastructure (BESS units, and MV Stations), new access tracks, underground cabling, perimeter fencing with CCTV cameras and access gates, a temporary construction compound, a substation and all ancillary grid infrastructure and associated works. It is proposed to use the consented Ballymoney Solar Farm access point (Pl Ref: 19/627 and ABP Ref: 305289-19). The solar farm and BESS would be operational for 40 years. A Natura Impact Statement (NIS) will be submitted with this application

Refused0.5 km08 July 2025
171497

Solar farm within a site area of approximately 39 hectares consisting of solar photovoltaic panels covering an area of up to 27.2 ha on ground mounted steel frames, 1 no on site substation, 8 no inverter / transformer stations, underground cables and ducts, boundary security fence, new internal tracks, CCTV cameras and all associated site services. Permission is sought for a period of 10 years

Granted0.7 km02 May 2018
2360151

A 38KV grid connection cable and associated infrastructure to connect the approved Johnstown North solar farm (consented under planning ref. 171497) to the existing Arklow 220kV Substation comprising the laying of a 3,190m Underground Cabling (UGC) and associated infrastructure, located at Dublin Road, Arklow, Co. Wicklow

Granted0.7 km20 March 2024
21968

Single storey dwelling and domestic garage with a waste water treatment unit and percolation area to current EPA specifications, plus bored well, together with all associated site works

Granted0.8 km02 December 2021

The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.

Policy and design risk

Full PDF

Source document extracts

Full PDF

Comparable decision table

Full PDF

Submission strategy

Full PDF
Ready to generate the full report?€49 incl. VAT once-off PDF, no account required