Alterations to previously granted planning application, ref no. 21/298, including changes to previously granted dwelling and to include changes to elevations and an increase of floor area, and all associated site works
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Ballybar Upper , Tinryland , Co. Carlow
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
12% of nearby decided applications were refused. The preview found 217 nearby planning records within 5 km where a location match is available.
- Matched source
- 22337
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
Retention permission for an unauthorised existing mobile home on site and all associated site works. Temporary permission for the afore mentioned mobile home for a period of 3 years. Permission for the demolition of an existing one and a half storey dwelling, permission for the construction of a replacement dormer style dwelling, septic tank and percolation area, connection to services and all associated site works
Retention permission for the construction of domestic shed 98.3msq and all associated site works
The construction of dormer style dwelling, a domestic garage, a bored well, new entrance, a Septic tank & percolation area & all associated site works
Retention permission is sought for the conversion of the garage to a living room including the as-built Annex connecting to the dwelling
A 10 Year Planning Permission for a solar farm with a total area of circa 192 hectares. The solar farm will consist of solar panels on ground mounted frames, 30 no. single storey electrical inverter/transformer stations, 4 no. single storey spare parts containers, 4 no. Ring Main Units, 8 no. weather stations, underground electrical ducting and cabling within the development site, private lands and within the L3051, L3052 and L3050 public roads to connect solar farm field parcels, security fencing, CCTV, access tracks, 2 no. stream deck crossings and 1 no. horizontal directional drill, temporary construction compounds, landscaping and all associated ancillary development and drainage works. Construction and operational access will be via 4 no. entrances from the L3051, L3052 and L3050. The operational lifespan of the solar farm will be 40 years and planning permission is requested for this duration. A Natura Impact Statement (NIS) has been prepared and will be submitted to the Planning Authority with the application
Source match
Matched from public planning record 22337The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report