Demolition of existing stand along single storey shelter / storage structure to side (floor area: 31 sqm) and the construction of a new single storey 2 no classroom special education unit to side / rear (total floor area of proposed extension: 320 sqm) of existing single storey school building (total floor area of existing school building: 611 sqm), minor elevational amendments and all associated site works
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
School Road, Tinahely, Tinahely ED, The Municipal District of Baltinglass, County Wicklow, Leinster, Éire / Ireland
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
16% of nearby decided applications were refused. The preview found 188 nearby planning records within 5 km where a location match is available.
- Matched source
- 19158
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
No reasons on record yet
Open preview
Nearest similar decisions
Circa 107 sqm single storey extension to the front of the existing Community Hall which will provide a new accessible entrance, covered porch and entrance area, kitchen, stores and new toilets. Relocation of existing stairs and minor amendments to internal layout on upper floor to reconfigure existing office space, amendments to elevations, including replacement of existing roof and all associated site works
Erect flood lights around existing GAA pitch and all associated site works
Single storey extension to side and rear of existing dwelling house including drainage and ancillary works
2 no storage warehouses with all ancillary services and associated works
A 10-year planning permission for a proposed development that consists of the part demolition, extension, reconfiguration, and refurbishment of an existing production and manufacturing facility. The proposed development includes for: Partial demolition of the existing facility, warehouses and storage shed, and excavation and site clearance at the rear of the site to facilitate the proposed works. Removal of existing ESB substation. The construction of production area; cleanrooms; a whiteroom; QC lab; plant areas, warehouse, workshops, ancillary offices, reception, canteen, and staff facilities and amenities within the existing areas to be refurbished and extension to the facility. There will be an overall gross floor area increase of c. 3,578 sq.m. Provision of sprinkler tank and pump house; storage silos; an ESB substation (including ESB equipment, MV switchgear and transformer) and the relocation of a generator. The reconfiguration of existing car parking and proposed additional parking resulting in 113 no. car spaces overall (including 5 no. disability spaces and 5 no. EV spaces). Provision of 2 no. bikes stores for 40 no. bicycle storage spaces. Truck loading bays and turning yard. Landscaping (including resurfacing of the existing access to the Tinahely Recycling Centre); boundary treatments and SUDs measures. External site lighting. Provision of solar PV panels at roof level and signage to the building facades. All associated and ancillary works and services necessary to facilitate the construction and operation of the proposed development. This planning application will be accompanied by a Natura Impact Statement (NIS)
Source match
Matched from public planning record 19158The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report