Free preview / €49 incl. VAT full PDF

Planning precedent report

Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.
See sample PDF
Opens secure checkout for the €49 incl. VAT full PDF report.Have a code? Enter it at checkout.
€49 incl. VAT once-off PDF, no account required
Refund requests are reviewed under the published refund policy
Derived from public planning records and linked source documents
PlanIntelPlanning precedent preview

Planning precedent report

School Road, Tinahely, Tinahely ED, The Municipal District of Baltinglass, County Wicklow, Leinster, Éire / Ireland

One-off house / within 5 km where a location match is available

Preview

Local planning pattern

16% of nearby decided applications were refused. The preview found 188 nearby planning records within 5 km where a location match is available.

Matched source
19158
Project type
One-off house
Coverage
5 km radius
188Nearby applications
16%Refused
158Conditional grants
0Refusal reasons

Top refusal reasons nearby

No reasons on record yet

More refusal reasons are being processed from public planning records.

Nearest similar decisions

19158

Demolition of existing stand along single storey shelter / storage structure to side (floor area: 31 sqm) and the construction of a new single storey 2 no classroom special education unit to side / rear (total floor area of proposed extension: 320 sqm) of existing single storey school building (total floor area of existing school building: 611 sqm), minor elevational amendments and all associated site works

Granted0.0 km08 April 2019
18901

Circa 107 sqm single storey extension to the front of the existing Community Hall which will provide a new accessible entrance, covered porch and entrance area, kitchen, stores and new toilets. Relocation of existing stairs and minor amendments to internal layout on upper floor to reconfigure existing office space, amendments to elevations, including replacement of existing roof and all associated site works

Granted0.1 km26 September 2018
23697

Erect flood lights around existing GAA pitch and all associated site works

Granted0.1 km20 October 2023
201271

Single storey extension to side and rear of existing dwelling house including drainage and ancillary works

Granted0.2 km08 February 2021
18286

2 no storage warehouses with all ancillary services and associated works

Granted0.3 km09 May 2018
2460087

A 10-year planning permission for a proposed development that consists of the part demolition, extension, reconfiguration, and refurbishment of an existing production and manufacturing facility. The proposed development includes for: Partial demolition of the existing facility, warehouses and storage shed, and excavation and site clearance at the rear of the site to facilitate the proposed works. Removal of existing ESB substation. The construction of production area; cleanrooms; a whiteroom; QC lab; plant areas, warehouse, workshops, ancillary offices, reception, canteen, and staff facilities and amenities within the existing areas to be refurbished and extension to the facility. There will be an overall gross floor area increase of c. 3,578 sq.m. Provision of sprinkler tank and pump house; storage silos; an ESB substation (including ESB equipment, MV switchgear and transformer) and the relocation of a generator. The reconfiguration of existing car parking and proposed additional parking resulting in 113 no. car spaces overall (including 5 no. disability spaces and 5 no. EV spaces). Provision of 2 no. bikes stores for 40 no. bicycle storage spaces. Truck loading bays and turning yard. Landscaping (including resurfacing of the existing access to the Tinahely Recycling Centre); boundary treatments and SUDs measures. External site lighting. Provision of solar PV panels at roof level and signage to the building facades. All associated and ancillary works and services necessary to facilitate the construction and operation of the proposed development. This planning application will be accompanied by a Natura Impact Statement (NIS)

Granted0.3 km25 October 2024

The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.

Policy and design risk

Full PDF

Source document extracts

Full PDF

Comparable decision table

Full PDF

Submission strategy

Full PDF
Ready to generate the full report?€49 incl. VAT once-off PDF, no account required