To construct 4 no. terraced house to the rear of the existing building and all ancillary and incidental works. The houses will consist of 2 bedrooms, kitchen, living area, bathroom and storage including bin storage
For the demolition of existing cottage ruins and for the construction of a storey and a half dwelling. the development will also consist of a new wastewater treatment system, site entrance and all associated site works
For the construction of a first floor extension and a single storey extension to the front and side of existing dwelling, the conversion of existing agricultural buiding into two residential units, waste water treatment system and all associated site works
To change the use from offices at ground floor of 48 Parnell Street to 1 no. one bedroom apartment together with associated alterations
For a single dwelling house, garage, advanced wastewater treatment system along with ancillary site works
For development, the development will consist of a new dwelling house, new garage, new site entrance and wastewater site works and below ground
For the construction of a vehicular entrance off private roadway, dwelling house, proprietary wastewater treatment system with polishing filter together with all associated site works
To erect a warehouse for storage purposes, including all associated site works
To Extend the Appropriate Period of Planning for P19/670 to construct a dwelling house, garage and waste water treatment system including all ancillary site services and works
For development which will consist of construction of a single storey dwelling and detached garage, with site works and connections to public services
To construct a dwelling house and garage, with effluent treatment system new entrance from public road, and all associated site works
Of security fence and entrance gate on the front boundary of their dwelling and all associated site works
For development which will consist of the construction of a dwelling house, garage, a proprietary waste water treatment system and ancillary site works
To construct a new dwelling house and garage complete with a new entrance, sewage treatment system and ancillary works.
To develop swimming platform, yoga deck, outdoor recreation area and changing stalls associated site works. A Natura Impact Statement accompanies this application
The development will consist of: (i) The construction of 7 no. wind turbines with the following parameters: a. Total tip height range of 179.5m – 180m, b. Rotor diameter range of 149m – 155m, c. Hub height range of 102.5m to 105m, (ii) Construction of associated foundations, hardstand and assembly areas; (iii) All associated wind farm underground electrical and communications cabling connecting the turbines and mast to the proposed electrical substation; (iv) Construction of 1 no. permanent 38kV electrical substation including a single-story control building with welfare facilities, all associated electrical plant and equipment, security fencing, entrance on to new access road, all associated internal underground cabling, drainage infrastructure, wastewater holding tank, retention separator tank, and all ancillary works, in the townland of Killeagy (Goonan), Co. Clare; (v) A Battery Energy Storage System within the 38kV electrical substation compound; (vi) 1 no. permanent meteorological mast of c. 36.5m in height, associated foundation and hard-standing area in the townland of Shannaknock; (vii) The permanent upgrade of 1 no. existing site entrance off the L7080 (‘The Gap Road’) for the provision of construction and operational access; (viii) Provision of 3 no. new permanent site entrances off the L7080 for the provision of construction and operational access; (ix) Provision of 3 no. new temporary site entrances off the L7080 for the provision of construction access; (x) Upgrade of existing tracks/ roads, including the L7080, and the provision of new site access roads, 4 no. watercourse crossings, junctions and hardstand areas; (xi) 1 no. temporary construction compound with temporary offices and staff facilities in the townland of Killeagy (Goonan); (xii) 1 no. temporary storage area in the townland of Killeagy (Goonan); (xiii) 1 no. borrow pit in the townland of Killeagy (Goonan); (xiv) Peat and Spoil Management; (xv) Tree Felling to accommodate the construction and operation of the proposed development; (xvi) Operational stage site and amenity signage; and (xvii) All ancillary apparatus and site development works above and below ground, including soft and hard landscaping and drainage infrastructure. A 10-year planning permission and 35-year operational life of the wind farm from the date of commissioning of the entire wind farm is sought. A Design Flexibility opinion issued by Clare County Council on 22nd April 2024 accomanies this application. The de
To construct a new dwelling house, provide a new access on to an existing access road and connect to the public sewer and storm water services along with all associated works
To apply for a 10-year permission for development at these sites (c.4.56ha combined total) in the townlands of Kilkee Lower and Foohagh, Kilkee, Co. Clare (no Eircode available); comprising two areas of land principally bound: Subject Site (A) to the north by residential dwellings at Victoria Park and Páirc na mBláth, to the south by agricultural land and residential dwellings at Victoria Park, to the east by Victoria Stream and residential dwellings at Victoria Park, and to the west by Haugh Mobile Park and residential dwellings at Páirc na mBláth (c.1.05a); Subject Site (B) to the north by agricultural land and the Dunlicky Road beyond, to the east by an un-named access road and agricultural land, to the south by agricultural land and a residential dwelling beyond, and to the west by agricultural land – this site also includes a section of the Dunlicky Road that is within the Foohagh Townland (c.3.51ha). The development will consist of: [1] The construction of a new Foul Pumping Station (PS) at Subject Site (A) comprising of: an emergency storage tank; surge kiosk; washwater kiosk; odour control building; control panel kiosk; standby generator; foul pumping station; petrol interceptor; potable water / break tank kiosk; gantry's for pump and cleaning system removal; installation of underground internal site pipework including surface water drainage and petrol interceptor; ESB building and Panel Room (c.36.2sq.m. GFA); 2.4m high wire mesh security boundary fence; replacement of existing chainlink fence; safety bollards; new signage; an access gate; temporary construction access including the demolition and reinstatement of a boundary wall at the existing Victoria PS site; temporary works area; permanent access off Victoria Park; and all hard and soft landscaping including screen planting. [2] The construction of a new Wastewater Treatment Plant (WwTP) at Subject Site (B) comprising of: 2 no. primary settlement tanks; MCC kiosk; outfall pumping station; picket fence thickener; return liquors pumping station; sludge / scum pumping station; odour control plinth; inlet works and grit chamber; potable water break tank booster set kiosk; storm holding tank; storm return pumping station; excess FFT chamber; FFT flow measurement chamber; PST flow splitting chamber; gantrys for pump and cleaning system removal; a control building (c.102.5sq.m. GFA); ESB building (c.36.2sq.m. GFA); standby generator and fuel tank; solar panels (c.250sq.m. area / c.3.5m high); ins
And completion of extension to the rear of house and all associated site works
To construct a granny flat with its own sewage treatment system and ancillary works
Of a covered seated smoking area to the rear of the bar/restaurant
Is sought for development consisting of the part demolition, alterations and extensions to the existing single-storey dwelling house including first floor attic conversion and extensions, new roof lights to front, demolition of existing side garage and construction of a single-storey attached dwelling/granny -flat, together with all ancillary development works
For development, the development will consist of removing part of existing stone building and building a dwelling house c/w ancillary site works
To revise planning Ref No P22/283 to include 2 No ground floor apartments
For the construction of an Independent Living unit Extension to side and rear of existing dwelling to comprise of Kitchen/Dining/Living, 2 Bedrooms, one with En-Suite and walk-in-wardrobe, Bathroom and Utility including ancillary site works
To renovate and extend the existing derelict dwelling, build a garage, install a wastewater treatment system and all other associated site and ancillary works
To Extend the Appropriate Period of Planning Permission P18/581 for the construction of 2 no. detached dwellings and all associated site development works
To Extend the Appropriate Period of Planning Permission P18/580 for the construction of 3 no. detached dwellings and all associated site development works
Of the revised location of the dwelling on site; the extension to the dwelling, the altered fenestration to the dwelling, which was granted permission under ref P11/616 and for RETENTION permission for the shed on site for horticultural use and for PERMISSION to revising the site boundaries granted under ref P11/616 & all other associated site and ancillary works
To demolish the existing sub-standard dwelling house and to construct a replacement dwelling house with minor elevational and internal layout changes along with a new private on-site domestic wastewater treatment system and all other associated ancillary site works.
To RETAIN changes to elevations and PERMISSION to convert existing detached garage into independent living unit, connected to exsting septic / percolation area, including all ancillary site works
For a glamping site with 5 no. glamp units, a reception/services/recreation building with roof mounted PV panels, existing site entrance modifications, access road, parking area, landscaping, on site wastewater treatment system and all associated site works
To erect 5 No dwellings & foul sewer treatment systems & percolation areas, to connect to ancillary services and to develop service road and new site entrance
To erect a 30 metre high telecommunications lattice tower with antennas, dishes and associated equipment attached, and with equipment cabinets at ground level all enclosed by security fencing and to include new entrance gates and an access track
To construct dwellinghouse, garage, bored well, waste water treatment system, entrance and all associated site works
To Extend the Appropriate Period of Planning Permission for P19/95 to (1) demolish existing rear single storey extension; (2) construct a rear 2 storey extension; (3) make structural changes to front elevation
To construct a new dwelling house, private shed, site entrance, wastewater treatment system and all associated site works and services
To Extend the Appropriate Period of Planning Permission for P19/120 for development which will consist of construction of a new dwelling farmhouse with associated wastewater treatment system, site works and services and permission to use existing farm track as access road to proposed farmhouse
To erect agricultural storage shed and new site entrance
To fill the existing poor quality agricultural land with stone and soil in order to raise the level of the ground, including all ancillary site works
For development, the development consists of the construction of a slatted unit and associated site works
For the construction of a new dwelling house and garage complete with a new entrance, sewage treatment system and ancillary works
Of the apartment as constructed (previous application P96/897 refers) and Planning Permission to change the use of apartment as granted under planning reference P96/897 to an independent dwelling house separate from adjacent dwelling and to provide new vehicular entrance and separating boundary wall and all associated site works.
To construct a two storey dwelling house, including all ancillary site works
To Extend the Appropriate Period of Planning Permission for P18/696 to extend the existing hotel, creating 8 additional guest bedrooms and all associated site and ancillary works
For the erection of 4 no. wind turbines with an overall ground to blade tip height of 150m with a rotor diameter of 136m and a hub height of 82m, the construction of crane hardstand areas and turbine foundations, the creation of a new site entrance onto the L6132, construction of 1 no. temporary construction compound with associated temporary site offices, parking areas and security fencing, installation of 1 no. permanent meteorological mast of 82m overall height, construction of new internal site access tracks and upgrade of existing site track, to include all associated drainage including new clear span bridge crossing of the Moyasta River, development of a site drainage network, biodiversity enhancement measures, construction of 1 no. permanent 38kV electrical substation, 2 no. permanent spoil storage areas, all associated underground electrical and communications cabling connecting the wind turbines to the wind farm substation and to the existing Tullabrack 110kV Substation, all ancillary forestry felling to facilitate construction including the development of one no. borrow pit, vertical realignment of an existing crest curve on the L6132. This application is seeking a ten year permission and a 35 year operational life from the date of commissioning of the wind farm. The planning application is accompanied by an Environmental Impact Assessment (EIAR) and a Natura Impact Statement (NIS)
To build a new dwelling, install a waste water treatment system & all other associated site and ancillary works
For development which will consist of a) alterations to the plans and elevations of the dwelling house granted permission under planning reference P21/1188 and permission to construct a domestic garage together with ancillary site works
For the construction of a dwelling house, vehicular entrance, wastewater treatment system, connection to services & all ancillary site works
To amend condition 3(a)(i) of planning P23/407 to allow for inclusion of a first floor bay window to the South West elevation with all necessary ancillary services