Of 1. the alterations and extensions to the dwellinghouse, originally granted permission under reference P13/109, with part use for overnight guest accommodation, 2. the private ancillary residential unit and for PERMISSION to upgrade the existing wastewater treatment system all associated and ancillary site works
To A) retain existing western vehicular entrance and B) amend design and location of proposed extension, close existing eastern vehicular entrance and amend wastewater treatment system previously granted under planning ref. P24/142
To retain Existing single storey extension to the rear of main building presently used as a Workshop and display area. Retention permission for the omission of work not undertaken comprising of Coffee shop and elevational changes as granted under planning Reference P19/103 including ancillary site works
To alter and extend the planning drawings as granted under P24/60400 along with ancillary site works. The works involve a) revisions to the external façade of the building b) a single storey extension at the rear of the building c) new first floor apartment within the existing roof structure d) a new single storey extension at the front of the building e) internal alterations
Of two dormer windows, septic tank and percolation area, and an incomplete extension. and also PERMISSION for alterations to the extension and completion of the dwelling place and all associated site works
To change the site boundaries as granted under P99-780, demolish 2 existing on-site sheds, and to construct a dwelling house and garage, with effluent treatment system, new entrance from public road, and all associated site works
To Extend the Appropriate Period of Planning Permission for P20/385 for development consisting of demolition of existing sheds, construction of extensions and alterations to an existing house and installation of a new wastewater treatment system along with all associated ancillary works.
For the construction of a new dwelling house, wastewater treatment system and percolation area, new entrance and all associated site works
Is sought to excavate, transport over land and grade 28,540m³ of byproduct in the form of existing inert natural materials such as soil and rock from existing site subject to ongoing planning application reference P2560178 to lands located to the North East of excavation site including all ancillary works
For construction of a new dwelling house, garage, sewerage treatment system and site entrance along with all associated works
For the proposed residential development will consist of the construction of 60 no. new residential dwellings comprising of: (a) 26 no. 2 beds, (b) 32no. 3 beds & (c) 2 no. 4 beds. Permission also to include for all associated ancillary site development works including SuDs system, car parking, site access, circulation, boundary and landscaping treatments as well as all utility services connections
To construct a new dwelling house, new entrance, access road, private garage and install a new wastewater treatment system along with all associated works
To carry out the following works: 1. Demolish existing garage and annex to existing dwelling house and 2. Construct a new single storey extension to the side of the property and 3. Construct a new garage and associated site works
To retain side extension to dwellinghouse together with all associated site development works, boundaries and connections to public services
For development at Armada House, Leagard South, Spanish Point, Miltown Malbay, Co. Clare which is a protected structure (RPS No. 025). The works involve installing an external fire escape stairs in the internal courtyard, replacing two existing windows with two doors to allow for access onto the external stairs, a roller shutter over an existing window in the courtyard and to move the boiler house door to the side elevation along with associated site works
For development at Precision Engineering Ltd., Block O109, Shannon Industrial Estate, Shannon, Co. Clare. The development will consist of proposed roof-mounted photovoltaic, PV, panels on the existing profiled metal roof and all associated siteworks
To construct a new dwelling house and garage complete with a new entrance, wastewater treatment system and ancillary works
For the demolition of existing extensions to cottage, refurbishment of existing cottage and construction of a two storey extension, a proprietary wastewater treatment system, modifications to existing road boundaries and agricultural entrance setback and gate for site access and all associated site works.
Of the following additions as constructed a) rear garage/storage space together with all associated site development works and services
Of the changes to the dwelling house and site layout, previously granted permission under ref P11/5 and all other associated site and ancillary works
To carry out reclamation works and filling of lands with imported inert soils, stone and overburden materials to enable the beneficial use of the agricultural lands together with all associated site development works
Of an extension to their dwelling house and the installation of an advanced treatment system, as constructed
To (a) renovate existing cottage (b) demolish north-western shed and reconstruct as a sitting room (c) construct a living area to the front of the cottage together with all associated site development works and services
To retain and complete development. The development consists of retaining and completion of existing granny flat at the rear of existing dwelling house and associated site works
To erect garage and store area
For development at this site in the townlands of Clonloghan and Caherteige, Co. Clare. The proposed development consists of an amendment to Condition No. 4 of the previously approved parent planning permission (Planning Ref. 18585), which relates to the operational life of the development. The proposed amendment seeks to extend the operational life of the permitted development from 25 years to 37 years. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply
Of an above ground wastewater balancing tank and a plant building and PERMISSION for an extension to a refrigeration shed, an extension to a compressor room, a water purification plant building, an above ground 5m water storage tank, an above ground 2,700m firewater storage tank with generator enclosure and associated site works
To construct extension to dwelling house, and all associated site works
For the following works at existing site in Crag, Lissycasey, Co. Clare. a) demolition of existing damaged rear and side extensions to the existing dwelling and demolition of a section of existing derelict dwelling, b) alterations to floor layouts, elevations, and roof structure of the existing dwelling, c) construction of new rear and side extensions to the existing dwelling, d) alterations and addition of an extension to the existing derelict dwelling, e) install new percolation area and treatment plant to serve the dwellings, f) all ancillary works related to the development
The proposed development, on an overall site of 3.58 hectares, will consist of: A co-located Battery Energy Storage System (BESS) Compound with associated internal access tracks; Access to the proposed BESS compound will be from the R466 local road and will consist of the use of an existing quarry entrance in the townland of Leitrim which will be upgraded as permitted as part of the Fahy Beg Wind Farm (under Clare County Council Ref: 23148 & ACP Ref 317227); Installation of grid code compliance equipment to facilitate an under-the-fence connection to the adjacent Fahy Beg 38kV substation. The grid code compliance equipment will include: Backup Generator, Neutral Earthing Resistor (NER), Auxiliary House Transformer, Marshalling Kiosks; 3 no. spare parts shipping containers (measuring 12.2 m (L) x 2.4 m (W) x 2.6 m (H)); and Associated ancillary development. Installation of 32 no. Battery Energy Storage Units comprising metal shipping containers housing batteries (measuring 6 m (L) x 2.4 m (W) and 2.9 m (H) each), and associated ancillary control and ventilation units; Installation of 8 no. Medium Voltage (MV) Inverter Stations comprising metal shipping containers housing the inverter, MV transformer, and an MV-LV room (measuring 6 m (L) x 2.4 m (W) and 2.9 m (H) each); Installation of 1 no. water storage tank (measuring 5.15 m (L) x 4.15 m(W) x 2.58 m (H)); Construction of 250m of new access tracks; Provision of a crane hardstanding area to facilitate lifting operations on site (280m2); Provision of 10 no. car parking spaces (8 no. standard parking spaces, and 2 no. accessible parking spaces); Reprofiling of the existing cut slope embankment with the erection of a gabion basket retaining wall measuring 75m in length and 2.5m in height, and construction of a reinforced fill slope embankment; Underground electrical and communications cabling; Security lighting, CCTV and communications mast; Provision of 150m of Sound reflective barriers; Security fencing and gates; Drainage system including on-site surface water attenuation ponds; Tree felling of 0.19 Ha (1,890m2) to facilitate required clearance for BESS compound, associated earthworks and drainage infrastructure; Removal of 109m of hedgerow to facilitate development of the BESS compound, and replanting of 109m at perimeter locations; and All associated ancillary site development and vegetation clearance works including landscaping and hedgerow reinstatement. The Applicant requests that the development be
To construct a detached toilet block facility on site for the use in association with the existing Chapel & Crematorium services and all ancillary site works
Of a) converted attic area to habitable use, b) retain covered area to rear of dwelling, c) retain stand alone store building to rear, d) retain modifications to elevations and e) retain entrance to site as constructed
For the following development: for the construction of a Multi Use Games Area (MUGA) with associated site fencing, netting, artificial surface, 4 No. 10m floodlighting poles, associated fittings and all associated ancillary site works
For development which will consist of (a) Removal of existing stone steps and handrail at main entrance to accommodate new ramp and steps. (b)Construction of a new external TGD Part M compliant accessible ramp and steps, to include stone clad plinth with toughened glass balustrade and stainless steel handrail. And all associated site works. This building is a protected structure (NBHS ref no. 20000006 and RPS ref no. 704) and is within an architectural conservation area
For the construction of an extension to the rear of an existing derelict dwelling house along with alterations/renovations to the existing house and the construction of a new entrance, access road and a new wastewater treatment system along with ancillary works
For the construction of a two storey extension, a new wastewater treatment plant and RETENTION of an ancillary workspace cabin
Of dwelling house as constructed, including additional floor area, structural/stabilisation works and elevational changes at variance to that permitted under Planning Permission Ref. P19/90; revised vehicular entrance off the R478; replacement of damaged on-site wastewater treatment unit and provision of revised soil polishing filter area; ancillary landscaping works and all associated site works to facilitate the development
To demolish a sub-standard shed and to construct a new shed in its place along with ancillary site works. The development is located within an architectural conservation area
Of the following a) The development of a hardstanding area used for the storage of agricultural and construction vehicles, machinery, plant and materials, b) Storage container, c) Erection of security gates together with all ancillary site development works
To construct a dwelling house, entrance, domestic garage, wastewater treatment system and soil polishing filter together with all associated site development works and services
Of existing house, garage and car port and connect to approved effluent treatment system and all associated site works
For development which will consist of the construction of a single storey dwelling house, garage, a proprietary waste water treatment system and ancillary site works
To carry out the following works. The demolition of existing side and rear extensions to existing dwelling, construction of a new extension to the rear and side of dwelling, along with all associated site works and services, to include a new wastewater treatment system, and bored well, using existing entrance from public road
For the following development which will consist of planning for the construction of a detached dormer dwelling, detached domestic garage, new entrance and driveway, pumped wastewater treatment system and rising main located on ancillary lands, private bored well, and landscaping together with all associated ancillary site development works
To construct a new dwelling house and garage complete with a new entrance, wastewater treatment system and ancillary works
For development which will consist of a 10-year permission for a Synchronous Condenser and Battery Energy Storage System (BESS) across a site of approximately 2.97 hectares, co-located with an existing solar farm. The development will have an operational capacity of c. 50 MW and will consist of the construction of battery energy storage system units, power conversion units, a synchronous condenser, control modules and rooms, transformers and bunds, cooling equipment, a generator circuit breaker, an emergency diesel generator with associated fuel tank, water tank, underground cabling, fencing with access gates, CCTV and lighting posts, a temporary construction compound, new and upgraded access tracks, and associated landscaping, and ancillary works. The development would be in operation for up to 30 years. A Natura Impact Statement (NIS) has been submitted with this application. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply.
To construct dwelling house, waste water treatment system, percolation area, entrance, RETENTION permission for as constructed shed and all associated site works
To erect a dwelling house and garage, install an effluent treatment for private domestic purposes and all associated site works
For the construction of a standalone garage, site entrance and all associated site works
To retain and widen existing farm entrance plus all ancillary site works