Planning permission for change of house type from plans approved under planning ref 25/60242 and all associated site works at Morette, Emo, Co. Laois.Decision record indexed
1. demolish the existing bay windows and replacement with a new single storey extension to the front facade. 2. construct an outdoor covered area to the rear. 3. Replace existing septic tank with a treatment system and associated percolation area. 4. Alterations to all external facades to include 1 Nr. window to the North and replacement windows/ doors, removal of quoins and make good. 5. Alterations to the existing domestic garage to change roof from lean to, to a pitched roof. 6. Change 2nd entrance gate to fence. 7. revision of the site boundaries and all associated site works.Decision record indexed
Demolish the partly constructed dwelling as granted under planning application 07/853, replace same with two number semi-detached two storey dwellings, connection to foul and stormwater mains, connection to watermains, associated boundary treatment and associated site worksDecision record indexed
Construct two storey and part three storey 1000 pupil secondary school to include general classrooms, specialist classrooms, a general-purpose hall, PE hall, offices, staff room, library, sanitary facilities and ancillary spaces. The development also includes the provision of: • New site entrance from O’Dowling roundabout on the Portlaoise South Orbital Route – R94 - Leading to new car and bus set down/ drop off area with 49 No. carparking spaces and with pedestrian & cycle route to the proposed school. • New site entrance from the adjoining Timahoe / Well Road (R426), access road with cycle and foot paths, bicycle spaces and 92 No. car parking space. • Provision of new footpath on the Timahoe / Well Road (R426), connecting to the existing. • Proposed new Hockey pitch with associated fencing, shelter dugouts and 8 no. flood lighting standards. • 6 no. ball courts, landscaped gardens and external social space. • Provision of a heat pump and gas storage areas, external stores and bin storage area. • Provision for all landscaping, boundary treatments, associated drainage, attenuation and other site services with all related site development and ancillary works. • A Natura Impact Statement (NIS) will be submitted to the planning authority with the application and the NIS will be available for inspection or purchase at a fee not exceeding the reasonable cost of making a copy during office hours at the office of the relevant planning authority.Decision record indexed
For 1. Alterations, renovations and extensions to an existing dwelling house, 2. Alterations, renovations and fitting new roof to existing garage/stable building. 3. Installing a new septic tank and percolation area and all associated site works.Decision record indexed
Develop a new primary care centre located on a vacant site immediately adjoining the Dublin Road and to the East of the existing car park, interlinked to the core public services and administration block of the existing protected structure (NIAH Reg. No. 12508088) St. Fintan’s Hospital building. The proposed development comprises: a) a four-storey Primary Care Centre building (total gross floor area c. 5,845m²) incorporating general practitioner (GP) surgeries, dental and orthodontic surgeries, outpatient consulting and treatment rooms, physiotherapy and occupational therapy rooms, group rooms, (CAMHS and day hospital), X-ray and ultrasound services, administrative offices, ancillary staff and meeting rooms, clinical and utility stores, waiting areas, and all associated circulation and building services; b) provision of site infrastructure including a new car park located to the South-West of the proposed building containing 104 no. surface-level car parking spaces (including 4 no. accessible spaces and 12 no. electric vehicle charging spaces), 80 no. bicycle parking spaces, pedestrian footpaths, cycle paths, boundary treatments, hard and soft landscaping, public lighting, site signage, and all associated site development and drainage works; c) the development includes provision of rooftop plant areas, ESB substation, and vehicular, pedestrian, and cycle access from within the existing St. Fintan’s campus road network and all associated site development works.Decision record indexed
Construct a new dwelling house, new domestic garage, new septic tank and percolation area, new site entrance and all associated site worksDecision record indexed
Construct a 2 storey dwelling house, garage, septic tank and percolation area, new entrance and all associated and ancillary site worksDecision record indexed
Construct a dwelling with ground floor accommodation and roof space storage, domestic garage, vehicular entrance foul effluent treatment system and percolation area, new bored well and all associated site works.Grounds not yet categorised
Construct a two storey dwelling house, domestic garage, effluent treatment system, percolation area and all associated site works at O'Moores Forest, Mountmellick, Co. LaoisDecision record indexed
Construct a New Dwelling, Garage, Effluent Treatment System & Percolation Area and New Site Entrance and to include all Associated Ancillary worksDecision record indexed
Carry out continued operation of the existing 80 metre meteorological mast and all ancillary infrastructure for a period of up to five years. The meteorological mast was installed as exempted development in accordance with Class 20A, Schedule 2, of the Planning and Development Regulations 2001 (as amended)Decision record indexed
Retain change of house design and position on site from previously approved Planning Ref. 21/58 and all associated and ancillary site worksDecision record indexed
Ballaghmore, Borris in Ossary, Portlaoise Co. Laois
Make alterations to the front of our existing dwelling to include changes to existing windows and the removal of an existing porch canopy and the permission to construct a new porch to the front of the dwelling. To demolish the existing utility room at the rear of the dwelling and to include new windows and doors to the side and rear of the existing dwelling and all associated siteworksDecision record indexed
Renovate dwelling house, construct extension at rear and extend sitting room at front, raise roof level to convert to dormer type house and construct domestic garageDecision record indexed
Construct 4 No. two storey three bedroom dwellings, shared car parking, common amenity space and associated infrastructural connections and site works.Decision record indexed
A c. 4.15 Ha site at Summerhill, Portlaoise, Co. Laois
Construct a creche (c. 961 sq m) and 74 No. residential dwellings comprising 64 No. 4-bed houses and 4 No. 1-bed and 6 No. 2-bed sheltered housing units. The proposed development will be 1 No. and 2 No. storeys in height. The development will also include: minor amendments to the landscape and boundary treatment to the south of the Phase 1A site to provide car parking and access to the proposed creche; the continuation of the Link Road permitted in Phases 1A & 1B, as proposed to be amended and extended as part of the Phase 2 application; car parking; cycle parking; public open space; drainage connections; boundary treatments; hard and soft landscaping; lighting; and all associated site and development works above and below ground.Decision record indexed
A c. 3.85 Ha site at Summerhill, Portlaoise, Co. Laois
Construct 92 No. residential dwellings comprising 86 No. 4-bed houses and 6 No. 2-bed sheltered housing units. The proposed development will be 1 No. and 2 No. storeys in height. The development will also include: minor amendments to the Link Road permitted as part of Phases 1A & 1B and its continuation through the Phase 2 site; minor amendments to the landscape and boundary treatment to the south of the Phase 1A site; car parking; cycle parking; public open space; drainage connections; boundary treatments; hard and soft landscaping; pumping station; lighting; and all associated site and development works above and below ground.Decision record indexed
Revise plans previously granted under permission 21/165 to construct a new livestock shed with underground slurry storage tanks and all associated site worksDecision record indexed
A c. 1.82 Ha site at Summerhill, Portlaoise, Co. Laois
Provide 36 No. 4-bed, 2 No. storey houses.The development will also include: the continuation of the Link Road permitted in Phases 1A & 1B, as proposed to be amended as part of the Phase 2 application and extended as part of the Phase 2 & 3 applications; car parking; public open space; drainage connections; boundary treatments; hard and soft landscaping; lighting; and all associated site and development works above and below ground.Decision record indexed
Constuct a two storey dwelling house, domestic garage, a proprietary waste water treatment system and polishing filter and all associated and necessary site works at Castlefleming Manly, Errill, Co LaoisDecision record indexed
Construct a single storey extension and porch to the front (north eastern) elevation, Retention of an existing single storey extension to the side (north western) elevation including all associated site worksDecision record indexed
Construct a single storey extension to the front of, and modifications to, the existing single-storey dwelling, and associated site worksDecision record indexed
CHANGE THE HOUSE DESIGN ON PLANNING FILE REG 21/679 TO A TWO STOREY DWELLING HOUSE; AND PERMISSION FOR DOMESTIC GARAGE; AND ALL ASSOCIATED SITE WORKSDecision record indexed
Construct a 2 storey dwelling house, garage, septic tank and percolation area, new entrance and all associated and ancillary site worksDecision record indexed
Construct new dwelling house, domestic garage, waste water treatment system and polishing filter, new site entrance and all associated worksDecision record indexed
A) extend the existing concrete yard to the Southeast of the site to create a new storage area, b) New overflow underground storage tank adjacent new yard extension, c) A new glass bottle storage warehouse facility with an area of 340m2 located Southeast of the existing factory d) A new single storey Warehouse Extension to the existing factory unit of 382m2 including the provision of a new loading bay to the rear e) The removal of 2 no. tanks within the existing tank farm to the northeast of the site and replacement with 4 no. new 150,000 litre storage tanks f) The removal of 6 no. 2-tonne gas tanks and the installation of 2 No. 10-tonne gas tanks and concrete base to the south of the site with associated ancillary equipment housed within a new steel 6m2 portable container g) The removal of the existing firefighting tank in the service yard area, and the provision of a new 256,000 litre firefighting storage tank with associated ancillary firefighting equipment housed within a new steel 6m2 portable container and fire truck turning area h) The installation of a flagpole and windsock adjacent fire stank location for firefighting services i) The installation of an oil interceptor to the northeast of the site along the entrance road with associated fire water containment automatic valves. j) The provision of a 6m x 4m concrete base for a new waste glass skip to the Southwest of the site, connected to the existing effluent plant k) The installation of new ESB transformer and associated infrastructure located to the rear of the existing building, l) New tree screening along the rear of the fire fighting and gas storage tanks, and all other associated site works.Decision record indexed
Retain a storey and a half dwelling with an adjacent shed and a vehicular entrance and upgrade the existing septic system and install a waste water treatment systemDecision record indexed
Change previously granted pl. ref. 23/100. Namely disconnect proposed shed from existing parlour, changes to steel sizes and roof pitch to meet Department of Agriculture standards and all associated site worksDecision record indexed
Kilmullen Ullard or Controversyland Clonanny Lea and Loughmansland Glebe, Portarlington, Co. Laois
Develop the following within Co. Laois: • Linear arrays of solar PV panels on ground mounted steel supported structures with associated cabling and ducting (including onsite control and switch gear room and underground cable grid connection to the Bracklone 110kV substation); • 2 no. proposed single storey inverter stations; • A co-located Battery Energy Storage System (BESS) park (including 16 no. containers with cells and 4 no. containers with PCS and inverters) with associated security fencing and gates; • Site Perimeter fencing; • 1 no. new site entrance with palisade double security gates; • 1 no. temporary construction compound/carpark/material storage area with associated temporary site offices, parking areas and security fencing; • 1 no. temporary and 1 no. permanent steel storage containers; • Site access tracks including passing and turning bays; • On-site pole mounted CCTV cameras; • 1 no. temporary construction stage Moby Dick type wheel wash systems; • 1 no. Concrete wash out locations (within temporary construction compound); and • All associated and ancillary works The proposed solar farm development spans a total site area measuring 60.36 ha, of which 37.66 ha is located in Co. Kildare and 22.7 ha is located in Co. Laois. Permission is sought for a period of 10 years with an operational period of 40 years. The total capacity of Solar PV on the site is estimated to be 32 MW. An Appropriate Assessment Screening Report (AASR) and Natura Impact Statement (NlS) has been prepared for this development and submitted with this planning application. The development is covered by the provisions of the (RED III) Renewable Energy Directive III (Directive (EU) 2023/2413 ). The planning application is subject to section 34D of the Planning and Development Act, 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply.Grounds not yet categorised
Erect dwellinghouse, garage, entrance, septic tank and percolation area. Close existing entrance gate on west side of field and open new entrance on east side of field to give access to remainder of land, and all associated site worksDecision record indexed