The removal of the existing fence and vegetation. The construction of a new single - storey ESB substation (15.2 MS) Raising the grade outside the substation entrance, the erection of a new replacement security fence. And all associated landscaping and site development works
New external signage with internal illumination at high level to Northern façade with internal LED display signage (2.5m x 2.1m) at ground floor level.
Installation of a 7.5m x 8.65m retractable canopy/awning, glazed partitions and planters for a 65sq.m sheltered outdoor seating area to the front of existing commercial unit.
Single storey porch extension to the front of existing dwelling and all ancillary site works.
Permission to permanently retain the change of use from Civic Offices to medical centre on foot of now expired, 10 year temporary permission (SD08/0594). Proposed uses include public attendance for consultation, treatment and general healthcare provision on all levels from lower ground floor to fourth floor, including retention of existing signage and roof top plant.
Amendments to a previously consented natural gas combined heat and power system and associated infrastructure (Ref. SD21A/0013).
Installation and operation of a natural gas combined heat and power system and the associated infrastructure.
Amend granted planning permission SD19A/0106 from current tea/coffee station to an artisan coffee shop with an area of 140sq.m encompassing an internal seating and casual meeting area.
Construction of 18.5sq.m first floor extension to the rear of existing dwelling.
Construction of an 18.5sq.m first floor extension to the rear of existing dwelling.
Subdivision of the existing retail department store (Unit 116 - 5,396sq.m. - formerly Debenhams) to comprise 2 retail units - 116A (2,431sq.m) and 116B (2,270sq.m) and new service corridor (176sq.m) to the rear of the proposed unit 116B to provide access to the existing service yard; associated modifications including the removal of the existing mezzanine floor within Unit 116 (497sq.m); creation of new retail frontage within the internal mall and associated signage; revisions to existing retail Unit 117 (113sq.m) and 118 (102sq.m) to form a single amalgamated unit (169sq.m) and creation of additional mall floor space (47sq.m) arising from the unit reconfiguration; all associated site and development works including minor revisions to the layout of the existing service yard.
Retention permission is sought for: Part (104 sq.m gross) of the first floor currently in light industrial use at Unit 5-9: Enlargement of ground floor window at Unit 5-9 on the north elevation enlargement of first floor windows at Unit 5-9 on the south elevation. Planning permission is sought for: (i)The change of use of Unit 4 (of 292.5 sq.m), including that part at first floor (104 sq.m) for which retention permission is sought, from light industrial use to office based industry use and amalgamation of Unit 4 with Unit 5-9 (1,505 sq.m gross) to provide a single office based industry unit of 1,797.5 sq.m gross together with all associated and ancillary works, including internal fit-out. (ii) At the south elevation of Unit 4: a. At ground floor, existing door, external shutter box, all supports and electrics to be removed and to be replaced with a new glazed door unit, and existing roller shutter door and all supports/electrics to be removed and replaced with new window unit. b. At first floor, 2 no. new aluminium/glass windows. (iii) 4 no. bicycle parking spaces, including provision for cargo bike.
The temporary use (for the next 5 years 2025-2029 inclusive) of part of the eastern carpark lands for the erection of a temporary tent structure for use as an ice rink for a period not exceeding 3 months per year (November - January) and all associated site and development works including plant, lighting, ancillary signage and with pedestrian routes to the shopping centre and associated car parks. The proposal will result in the loss of c.48 spaces for the duration of the temporary ice rink use.
Proposed dormer window to rear roof of main house, the associated attic conversion, and velux winddowns to the front roof.
Ground floor front porch with pitched roof over & widening of vehicular entrance in front boundary wall.
Conversion of existing attic space comprising of modification of existing roof structure; new gable window; new window to front gable; new access stairs; new roof window to the front and rear; flat roof dormer to rear.
Erection of a 6000mm high totem style site sign for the Turnpike Business Park; the totem will be 1800mm wide x 250mm deep in plan, including lettering/numerals and illuminated elements to it's north and south sides and will be located at the east boundary of the site near the site entrance; associated works.
Conversion of existing attic space comprising of modification of existing roof structure, new gable window, new access stairs, flat roof dormer to the rear and 2 no. roof windows to the front, retention of single storey extension to the front comprising of porch and living room extension.
Retention of Change of Use from Light Industry / Warehousing and Ancillary Office to Office, and Retention of Amalgamation of Unit E1 (total G.I. area of 317.40m²) with Unit E14 (total G.I. area of 294.50m²), to achieve a total amalgamated area of 617.4m², all located at Block E, Calmount Park, Ballymount, Dublin 12, D12 X854.
Conversion of existing attic space to habitable space; works include 1 new window to the front elevation; 1 new window with obscured glazing to the side elevation and 2 'Velux' windows to the rear roof.
Conversion of existing attic space comprising of modification of existing roof structure, new access stairs, A-style roof dormer and 2no. roof windows to the front and 4no. roof windows to the rear.
To Convert Attic to comprise of a bedroom, ensuite, home office and playroom, a new dormer roof to rear of existing roof, new roof windows to both front and back of existing roof, relocate solar panels at rear of existing roof and all associated site works
Construction of a new two storey extension adjacent to the existing Pharmacy Department located on the east side of the campus to provide a new Aseptic Pharmacy Unit incorporating laboratory areas; support rooms and first floor plantroom; external stairway; new exit door from the Pharmacy corridor to the adjacent service yard; new exit door from the delivery bay area to the hospital delivery yard and associated site and landscaping works.
The development will consist of internal reconfiguration and amalgamation of 4no. existing Level 2 retail units (U238, U239, U240 and U241) to provide two retail units (U238: 516sqm and U240: 1282sqm) and ancillary circulation and general store rooms (c.274sqm) resulting in no overall increase in gross floorspace. Permission is also sought for all associated site and development works and reuse of existing signage zones.
(i) Retention permission is sought for the mezzanine floor, stairwell and associated meeting room; (ii) (a) change of use of Unit F1 from cafe to car rental office and erection of partition walls to create a reception area, staff offices, staff mess area, wc, store room and staff canteen at ground floor; (b) upgrade works including replacement of mezzanine floor and stairwell; (c) installation of company signage to front of unit; and (ii) change of use from commercial car park to car rental and car share facility at basement level comprising of the following: (a) removal of 3 car parking spaces to provide for single storey car rental kiosk (28.82sq.m) comprising reception area; (b) redesignation of 30 commercial car parking spaces as car rental spaces (3 car club, 3 staff, 12 return and 12 rental spaces); (c) removal of 7 car parking spaces to provide circulation route, and car washing area (69.18sq.m) comprising 2 power washers, 1 wash pad connected to the existing petrol interceptor in the car park and car drying area. The car wash will connect to the mains water connection; (d) erection of company signage over entrance to car park from Belgard Square North; and (e) drainage and all associated site development and ancillary works necessary to facilitate development.
Revisions to previously permitted internal modifications as approved under Ref. SD18A/0399 resulting in the reductions in the kiosk zone at Level 2 only by 196sq.m (from 1073sq.m to 877sq.m) to accommodate a new partially enclosed restaurant/café unit (196sq.m) and associated setting; the new restaurant and seating area will correspond with the footprint of the existing Units 260/262 and 263 and will contain associated facilities including a kitchen, front and rear counters, condiment unit, dining tables, chairs, booths and benches; associated signage and development works.
The development will consist of a single storey front and side extension plus internal alterations and all associated site works.
Located on a section of Belgard Square South. The development includes the closure of the slip road from Belgard Square South onto the N81. This development is proposed to accommodate the increase in the volume of buses in the area as a result of the changes proposed under BusConnects. The volume of buses is set to increase from 22 to 49 buses per hour. It forms part of Government efforts to improve public transport and address climate change nationally, supporting national strategies such as the National Development Plan 2021 - 2030 and the Climate Action Plan 2023. The layover facility will be comprised of bus parking for 10 buses and welfare facilities for drivers. The development consists of two separate parking areas with 7 bus bays in the south layover and 3 in the layby to the north of Belgard Square South. There will be one entrance point into the layover area located on the southern side of Belgard Square South. This layover area will have 2 egress points with a right turn ban in place. There will be a layby located on the northern side of Belgard Square South, across from the layover area. The layover area includes a bus driver welfare facility comprising of two toilet units. The proposed Development includes the closure of the hard shoulder on the northern side of the N81 to accommodate the realignment of the cycle track along the N81. The proposed development includes all the associated works to facilitate the bus layover and welfare facility. This includes drainage works, utility diversions, public lighting, fencing and landscaping. The overall area of the site is approximately 0.7 ha.
Retention of single storey kitchen extension to front side and rear of existing house and all associated site works.
Demolition of existing commercial building (736sq.m) and construction of a single storey cafe/restaurant (79sq.m); single storey bicycle workshop building (32sq.m); improved public realm area to include seating; bicycle parking (60 spaces) and hard and soft landscaping and all associated site and development works.
The proposed development will consist of amalgamation (including removal of internal mezzanine areas) and change of use of Units U133ABC (former An Post) and U133D (former Bodytalk) from Post Office and Retail Use respectively (both Class 1 “shops”) to accommodate a restaurant/ takeaway unit (243sqm) for consumption of hot food on and off the premises, modifications to existing shopfront signage, new tenant sign on eastern elevation and all associated site and development works
Construction of 6 x 3 Storey Family dwellings comprising 2 no. semi-detached and 4 no. terraced dwellings and 4 no. terraced dwellings. In curtilage car parking in front gardens for each dwelling, bike/bin stores and all associated site works.
Construction of single storey extension to the rear and side comprising of Storage, Utility, Living and dining area. Conversion of front garden driveway with modification to front wall
First floor extension over the existing ground floor extension to the side with proposed use of the entire two storey extension to the side to be a family flat ancillary to the main dwelling with two roof lights in rear roof plane.
Construction of 2 office rooms at attic level with dormer structure to the rear, 2 rooflights to the front, 1 rooflight on the side and relocation of solar panels to south elevation and all associated site works.
The construction of two rooflights in the main roof to the front of the house and the construction of one dormer window in the main roof to the rear of the house.
Demolition of existing single storey conservatory and existing rear shed structure. Construction of new single storey front extension, single storey rear extension, dropping ground floor level throughout and stand-alone home office and storage room to the rear. Works also include widening of the existing vehicular entrance to 4m and dishing of kerbing to match and all associated works.
Dormer attic with en-suite to the rear of semi-detached house and all associated works.
The installation of a 1.62m x 0.87m x 0.5m (HxWxD) gas pressure reduction unit and 3.25m (H) vent stack, with all ancillary services and associated site works.
Addition of 4 new windows to the existing house: 1 window to the front gable, 1 'Velux' to the front roof, 1 to the side elevation and an additional 'Velux' to the rear.
Construction of single storey extension to the front, rear and side comprising of storage, utility, living and dining area; Conversion of existing attic space comprising of modification of existing roof structure, new access stairs, flat roof dormer to the rear & WC; Conversion of front garden driveway with modification to front wall and public path.
Construction of new bedroom, walk-in wardrobe and wc semi-detached property at attic level and associated works to include a new window and 'Velux' window on the front elevation; 'Velux window to the rear and window on the gable side.
Conversion of existing attic space comprising of modification of existing roof structure, new access stairs, A-style roof dormer and 2 no. roof windows to the front and flat roof dormer to the rear.
Conversion of attic space with new rooflights in roof to front and back of house.
Conversion of existing attic space comprising of modification of roof structure, new front window, roof windows to front and rear and new access stairs.
Conversion of existing attic space comprising of modification of existing roof structure, new front window, 2 roof windows to the front, 3 roof windows to the rear and new access stairs.
Conversion of existing attic space comprising of modification of existing roof structure, new front window, roof windows to the front, roof windows to the front, roof windows to the rear and new access stairs from first floor landing.
Attic conversion with wc & dormer window on rear slope of roof; roof light on rear slope of roof at attic level; window in gable wall at attic level.
Conversion of existing attic space comprising of modification of existing roof structure to form a new bedroom and new study, new front window, new roof window to front and 4 no. roof windows to the rear and new access stair from first floor.
Attic conversion for storage, including a raised gable to the side, a front dormer, two rear dormers, and one Velux window to the rear. Single-storey front extension with a sloped roof and new front-facing gable over the proposed front door. First-floor front extension to existing bedroom.