Permission for development. The development
Permission for alteration/extension of the existing two storey detached house, comprising the conversion of the attic to habitable accommodation with dormer windows on the front, rear and side elevations and associated modifications to the internal layout, existing fenestration and site development.
The development will consist of removal of the covered raised platform oversailing the Millpond wall, reconfiguration / extension of public square hardstanding area and railings, relocation of existing plant to a new plant enclosure at the base of the millpond dam wall, and all associated site and development works. The Millpond is a recorded archaeological monument (RMP: 022-10002).
10 year permission for a Strategic Housing Development, with a total application site area of c.9.6 ha, on lands at the Central Mental Hospital, Dundrum Road, Dundrum, Dublin The subject site is in the immediate setting and curtilage of a number of proposed protected structures, namely the ‘Asylum’ (RPS No. 2072), the ‘Catholic Chapel’ (RPS No. 2071) and the ‘Hospital Building’ (RPS No. 2073). The development will consist of the demolition of existing structures associated with the existing use (3,736 sq m), including: Single storey former swimming pool / sports hall and admissions unit (2,750 sq m); Two storey redbrick building (305 sq m); Single storey ancillary and temporary structures including portacabins (677 sq m); Removal of existing internal sub-divisions/ fencing, including removal of security fence at Dundrum Road entrance; Demolition of section of porch and glazed screens at Gate Lodge building (4 sq m); Removal of walls adjacent to Main Hospital Building; Alterations and removal of section of wall to Walled Garden. The development will also consist of alterations and partial demolition of the perimeter wall, including: Alterations and removal of section of perimeter wall adjacent to Rosemount Green (south); Formation of a new opening in perimeter wall at Annaville Grove to provide a pedestrian and cyclist access; Alterations and removal of sections of wall adjacent to Dundrum Road (including removal of existing gates and entrance canopy), including reduction in height of section, widening of existing vehicular access, provision of a new vehicular, cyclist and pedestrian access; Alterations and removal of section of perimeter wall adjacent to Mulvey Park to provide a pedestrian and cyclist access. The development with a total gross floor area of c. 106,770 sq m (c. 106,692 sq m excluding retained existing buildings), will consist of 977 no. residential units comprising: 940 no. apartments (consisting of 53 no. studio units; 423 no. one bedroom units; 37 no. two bedroom (3 person) units; 317 no. two bedroom (4 person) units; and 110 no. three bedroom units) arranged in 9 blocks (Blocks 02-10) ranging between 2 and 6 storeys in height (with a lower ground floor to Block 03 and Block 10, resulting in part 7 storey), together with private (balconies and private terraces) and communal amenity open space provision (including courtyards and roof gardens) and ancillary residential facilities; 17 no. duplex apartments (consisting of 3 no. two bedroom units and 14 no. three bedrooms units located at Blocks 02, 08 and 09), together with private balconies and terraces. 20 no. two and three storey houses (consisting of 7 no. three bedroom units and 13 no. four bedroom units) and private rear gardens located at Blocks 02, 08 and 09). The development will also consist of 3,889 sq m of non-residential uses, comprising: Change of use and renovation of existing single storey Gate Lodge building (reception/staff area) to provide a café unit (78 sq m); 1 no restaurant unit (307 sq m) located at ground floor level at Block 03; 6 no. retail units (1,112 sq m) located at ground floor level at Blocks 03 and 07; 1 no. medical unit (245 sq m) located at ground floor level at Block 02; A new childcare facility (463 sq m) and associated outdoor play area located at ground floor level at Block 10; and A new community centre facility, including a multi-purpose hall, changing rooms, meeting rooms, storage and associated facilities (1,684 sq m) located at ground and first floor level at Block 06. Vehicular access to the site will be from the existing access off Dundrum Road, as revised, and from a new access also off Dundrum Road to the south of the existing access. The development will also consist of the provision of public open space and related play areas; hard and soft landscaping including internal roads, cycle and pedestrian routes, pathways and boundary treatments, street furniture, wetland feature, part-basement, car parking (547 no. spaces in total, including car sharing and accessible spaces); motorcycle parking; electric vehicle charging points; bicycle parking (long and short stay spaces including stands); ESB substations, piped infrastructural services and connections (including connection into existing surface water sewer in St. Columbanus Road); ducting; plant (including external plant for district heating and pumping station); waste management provision; SuDS measures (including green roofs); attenuation tanks; sustainability measures (including solar panels); signage; public lighting; any making good works to perimeter wall and all site development and excavation works above and below ground. The application contains a statement setting out how the proposal will be consistent with the objectives of the Dún Laoghaire Rathdown County Development Plan 2016-2022 and the Dún Laoghaire Rathdown Development Plan 2022-2028. The application contains a statement indicating why permission should be granted for the proposed development, having regard to a consideration specified in section 37(2)(b) of the Planning and Development Act 2000, as amended, notwithstanding that the proposed development materially contravenes the Dún Laoghaire Rathdown County Development Plan 2016-2022 and the Dún Laoghaire Rathdown Development Plan 2022-2028 other than in relation to the zoning of the land. An Environmental Impact Assessment Report and Natura Impact Statement have been prepared in respect of the proposed development. The application, together with the Environmental Impact Assessment Report and Natura Impact Statement, may be inspected, or purchased, at a fee not exceeding the reasonable cost of making a copy, during public opening hours at the offices of An Bord Pleanála and Dun Laoghaire-Rathdown County Council. The application may also be inspected online at the following website set up by the Applicant: - www.dundrumcentralresidential.ie
Permission to erect a new stainless steel and glass bus shelter, 5.2m x 1.85 x 2.8m high with 2 No. internally illuminated advertising panels each of 2sqm area on the public footpath.
Permission for development. The development will consist of: First-floor side extension. Attic conversion for storage with dormer window to the rear. Three Velux windows to the side. Widening of front access to allow better vehicular access.
Demolition of an existing garage and shed structure to the side of the existing dwelling, internal alterations to the existing ground floor layout, construction of a new part single-storey, part two-storey extension to the side of the existing dwelling, construction of a new first floor extension to the rear of the existing dwelling, minor reconfigurations to the fenestration details along the front elevation including a new rooflight, alterations to the existing rear extension including the lowering of the finished floor level, insertion of a mezzanine, and the re-cladding of the roof structure in zinc, all along with associated landscaping, ancillary and site works.
The development will consist of building mounted signage over the Block 3 main entrance and 2no. wall mounted high level signage to the southeastern and northeastern elevations of Block 3 to replace 3no. existing signs at the same locations.
The development will consist of: - The temporary use (for the next 3 years, 2025-2028 inclusive) of lands to the rear of the Holy Cross Catholic Church and Parochial House for the erection of a temporary tent structure for use as an ice rink for a period not exceeding 17 weeks per year (October – January). The proposed development includes the provision of power and lighting, mobile toilets, plant, associated signage and all associated site and development works. The ice rink will have vehicular and pedestrian access from Main Street and the Dundrum Village Centre car park to the north. A pedestrian access route to Dundrum Town Centre will be provided adjacent to Dundrum Bypass under Dom Marmion Bridge. The site has c.158 parking spaces at present and this number will be reduced to c.85 spaces for the duration of the temporary ice rink use
Permission for development. The development will consist of:- The temporary use (for the next 3 years 2022-2024 inclusive) of lands to the rear of the Holy cross Catholic Church and Parochial House for the erection of a temporary tent structure for use as an ice rink for a period not exceeding 17 weeks per year (October-January). the proposed development includes the provision of power and lighting, mobile toilets, plant, associated signage and all associated site and development works. The ice rink will have vehicular and pedestrian access from Main Street and the Dundrum Village Centre car park to the north. A pedestrian access route to Dundrum Town centre will be provided adjacent to Dundrum Bypass under Dom Marmion Bridge. The site has c.158 parking spaces at present and this number will be reduced to c.85 spaces for the duration of the temporary ice rink use.
Residential scheme of 934 dwelling units on an overall site of 9.7 hectares ( ABP- 320912-24).
Permission for development at this site (approximately 0.79 ha, or 7,944 sq.m in area) at Sommerville House, Dundrum Road, Dublin 14. The proposed development will consist of: Demolition of all structures on the site and site clearance works. The construction of 2 no. apartment blocks (Blocks A and B) providing 111 no. apartments in total (comprising 3 no. studios, 51 no. one bedroom units, 46 no. 2 bedroom / 4 person units and 11 no. 2 bedroom / 3 person units. Block A (Western block, fronting Dundrum Road) comprises a 6-storey block (5 levels over lower ground level / semi-basement) stepping down to the east to 4-storeys in height. Block B (Eastern block, towards the rear (east) of the site) is of part 2-, and part 3-storey height. The proposed development has a total gross floor area of 10,291 sq.m and provides; internal communal ancillary residential services / amenities to include a post room at lower ground floor level within Block A; a shared amenity / lounge (17.5 sq.m) and a storage room (11.8 sq.m) at second floor level within Block B. A semi-basement / lower ground floor level is provided in Block A that will be accessed via a vehicular ramped access/egress onto/off Sommerville Road to the north. This semi-basement provides two refuse stores; 39 no. car parking spaces (of which 10 no. spaces are fitted for Electric Vehicles and including 3 no. car club spaces); secure bicycle parking / storage in the form of 82 no. double stacked bicycle storage spaces providing 164 no. residents cycle parking spaces; 2 no. cargo bike storage areas; 3 no. motorcycle spaces; plant room (75 sq.m) and an ESB substation/switch room. At ground / surface level provision is made for 2 no. disabled car parking spaces (both fitted for Electric Vehicles) together with 56 no. short stay bicycle storage spaces in the form of 28 no. Sheffield stands and a further 3 no. Sheffield stands providing 6 no. long stay bicycle spaces plus 2 no cargo storage bike spaces. An enclosed bin store is also provided at surface level to the north of Block B. Communal Outdoor Amenity space is provided for residents in the form of rooftop terraces located at 2nd floor level within Block A and B, respectively (totalling 360 sq.m in area), and communal courtyard spaces at ground floor level between blocks (totalling 1,563 sq.m in area). Private amenity spaces are proposed in the form of patios / terraces at lower ground and ground floor levels with balconies serving apartments at the upper levels. Hard and soft landscaping works are proposed at ground floor level which includes the provision of footpaths; fire tender access and an informal play area for children. Provision of 4 no. rooftop telecommunications antennae (Block A) and an associated base station / cabinet that will be located within a designated comms room (approximately 13.6 sq.m) that is situated at lower ground floor level within Block A. Works proposed to the existing Sommerville and Dundrum Road junction include the provision of an uncontrolled pedestrian crossing (including dropped kerbs and tactile paving) and reduced junction radii to 6.0m. Works proposed at the site access road from Sommerville Road include the provision an uncontrolled pedestrian (to include dropped kerbs and tactile paving). The application, may be inspected, or purchased at a fee not exceeding the reasonable cost of making a copy, during public opening hours at the offices of An Bord Pleanála and Dún Laoghaire-Rathdown County Council. The application may also be inspected online at the following website set up by the applicant: www.sommervilleshd.ie
Retention Permission for - Velux Rooflight placed on front
The development will consist of the construction of a dormer window in the main roof to the rear of the house, and two rooflights in the main roof to the front of the house as well as changing the existing main roof hip to a gable with (with window) along with all associated site works.
Permission for a) Change of Use of the existing
Demolitions, Elevation & Roof Modifications and all associated site works.
Retention of: 2 x illuminated fascia signs, 1 x illuminated projecting sign and 1 x illuminated A4 Wall Menu to the 2 external elevations.
Installation of 5 no. building mounted signs at locations on the existing Dundrum Town Centre building (Building 1) as follows: 3 no. 'Dunnes Stores' signs on the western elevation of the Dundrum Town Centre to the Dundrum Bypass (Sign 1: 1.7m x 0.5m, Sign 2a: 5.1m x 1.5m, Sign 2b: 5.1m x 1.5m) 1 no. 'Dunnes Stores' sign on the southern elevation of the Dundrum Town Centre to the Tesco Car Park (Sign 3: 5.1m x 1.5m) 1 no. 'Dunnes Stores' sign on the northern elevation of Building 1 to Town Square (Sign 4: 2.5m x 0.8m) Permission is also sought for all associated site and development works associated with the above.
Permission and Retention Permission for development.
Conversion of attic to non habitable accomodation and a bathroom including changing the hipped end roof to a gable end roof, a dormer window to the rear, a window to the new side gable wall and a velux rooflight to the front, all at roof level.
Permission is sought for development consisting of proposed new signage including: 4 vinyl graphics applied to the restaurant entrance glazing. 1 internally illuminated Perspex sign with LED fittings above the entrance doors in the covered area. 2 powder-coated stainless steel signs with opal acrylic faces, LED-lit, on the building exterior facing Dundrum Town Centre and Ballinteer Road.
The development will consist of amalgamation of units 1.3 and 1.4a (Level 1) to create a single unit (296sqm). The use is unchanged (ie. restaurant with ancillary bar use).
Permission for a Strategic Housing Development consisting of a total gross floor area (gfa) of 88,442.0sqm comprising 881 apartments and ancillary accommodation totalling 83,983.3sqm GFA and 4,458.7sqm of non-residential uses. The proposed development is laid out in 11 blocks across 4 zones as follows: Zone 1 (29,965.2sqm gfa): This zone comprises Blocks 1A, 1B and 1C ranging from 5 storey to Main Street (Block 1C) to 10-16 storeys on Dundrum By-pass and establishing a landmark 16 storey building at the northernmost point of the site. This zone will comprise 292no. apartments with a total residential gross floor area of 27,565.3sqm (comprising 1no. studio, 115no. 1 bed, 19no. 2 bed 3 person, 134no. 2 bed 4 person and 23no. 3 bed units) with ancillary accommodation and associated private balconies. The blocks are arranged around a landscaped courtyard communal amenity space above podium level and there are 4no. communal roof garden terraces on Blocks 1A, 1B and 1C. Non-residential uses in Zone 1 (2399.9sqm) comprises 1no. retail unit (330.3sqm), a retail foodstore (2,028.1sqm), and other ancillary accommodation (41.5sqm). The area below podium includes 52no. car parking spaces, 2no. motorcycle spaces and 525no. bicycle spaces. Zone 2 (23,127.8sqm gfa): This zone comprises Blocks 2A, 2B and 2C ranging from 5 storeys on Main Street (Block 2C) to 9-12 storeys to the rear on Dundrum By- pass. This zone will comprise 239no. apartments with a total residential gross floor area of 22,624.0sqm (comprising 87no. 1 bed, 40no. 2 bed 3 person, 85no. 2 bed 4 person and 27no. 3 bed units) with ancillary accommodation and associated private balconies. The blocks are arranged around a landscaped courtyard communal amenity space traversed by a public street and there are 3no. communal roof garden terraces on Blocks 2A and 2B. Non-residential uses in Zone 2 (503.8sqm) comprises 4no. retail units (482.8sqm) on Main Street and other ancillary accommodation (21sqm). The area below podium includes 144no. car parking spaces, 7no. motorcycle spaces and 425no. bicycle spaces. Zone 3 (22,152.8sqm gfa): This zone comprises Blocks 3A, 3B and 2C ranging from 5 storeys on Main Street (Block 3C) to 9-11 storeys to the rear on Dundrum By- pass. This zone will comprise 222no. apartments with a total residential gross floor area of 21,745.1sqm (comprising 75no. 1 bed, 25no. 2 bed 3 person, 103no, 2 bed 4 person and 19no. 3 bed units) with ancillary accommodation and associated private balconies. No.’s 1-3 Glenville Terrace (585.2sqm) are to be retained, refurbished and amalgamated and will be used for resident services and amenities / resident support facilities for the overall development and the rear returns will be replaced like for like). The blocks are arranged around a landscaped courtyard communal amenity space traversed by a public street and there are 3no. communal roof garden terraces on Blocks 3A and 3B. Non-residential uses in Zone 3 (407.8sqm) comprises 2no. retail units (218.4sqm) and a café/ restaurant (167.2sqm) fronting Main Street and other ancillary accommodation (22.2sqm). The area below podium includes 112no. car parking spaces, 5no. motorcycle spaces and 389no. bicycle spaces. Zone 4 (13,196.2sqm gfa): This zone comprises Blocks 4B ranging from 3 to 5 storeys on Main Street (with 6 storeys to internal street) and Block 4A ranging from 8 to 10 storeys to the rear on Dundrum By-pass. This zone will comprise 128no. apartments with a total residential gross floor area of 12,049.0sqm (comprising 58no. 1 bed, 57no. 2 bed 4 person and 13no. 3 bed units) with ancillary accommodation and associated private balconies. The blocks are arranged around a landscaped courtyard communal amenity space traversed by a public street and there is a communal roof garden space on Block 4A. Non-residential uses in Zone 4 (1147.2sqm) comprises 3no. retail/ commercial units (365.1sqm), 3no. café / restaurant units (236.3sqm) and a creche (523.1sqm) with associated enclosed outdoor play area addressing Main Street and Church Square and other ancillary accommodation (22.7sqm). The area below podium includes 65no. car parking spaces, 3no. motorcycle spaces and 247no. bicycle spaces. A revised entrance arrangement to existing basement of No.16/17 Main Street is provided as part of Block 4B. The development includes a new public street running on a north-south axis through the site and a series of new public spaces located between the 4 zones and which facilitate new street connections to Main Street. In addition, a new public open space known as ‘Church Square’ (c. 0.2ha) is proposed to the rear of Holy Cross Church and will integrate with the lower ground floor Parish Pastoral Centre. Church Square will be connected via a new stairs and lift to Ballinteer Road and via stairs to the Dundrum Bypass. A new east-west pedestrian/cycle linkage is proposed linking Main Street to Sweetmount Park located on the western side of Dundrum Bypass via a new pedestrian/ cycle bridge. The proposed development involves closure of existing vehicular access to the old shopping centre on Main Street and entrance to carpark at rear of former Mulvey’s hardware immediately north of the Parochial House. 3no. vehicular access / egress points will be provided on Dundrum Bypass which serve an internal access road, service/ loading areas and basement parking areas. A total of 373no. car parking spaces, 17no. motorcycle parking spaces and 1,750 bicycle parking spaces are proposed. The lower ground floor car parking area has a vehicular link under Ballinteer Road / Dom Marmion Bridge to connection to Dundrum Town Centre basement car parking area. New / upgraded pedestrian crossings are proposed on Main Street, at the entrance to Dundrum Luas station adjacent to Usher House and on Ballinteer Road connecting to Pembroke District. Permission is also sought for demolition of all existing buildings on site (excluding No.’s 1-3 Glenville Terrace), upgrading of footpaths, pedestrian crossings, foul and surface water drainage infrastructure, compensatory flood storage and flood mitigation measures, signage and all associated site and development works. The application contains a statement setting out how the proposal will be consistent with the objectives of the relevant development plan or local area plan. The application contains a statement indicating why permission should be granted for the proposed development, having regard to a consideration specified in section 37(2)(b) of the Planning and Development Act, 2000, as amended, notwithstanding that the proposed development materially contravenes a relevant development plan or local area plan other than in relation to the zoning of the land. An Environmental Impact Assessment Report (EIAR) and Natura Impact Statement (NIS) have been prepared in respect of the proposed development. The application together with An Environmental Impact Assessment Report and Natura Impact Statement may be inspected, or purchased, at a fee not exceeding the reasonable cost of making a copy, during public opening hours at the offices of An Bord Pleanála and Dun Laoghaire Rathdown County Council. The application may also be inspected online at the following website set up by the applicant: www.dundrumvillageshd.ie
The installation of 8no. hanging illuminated signs on the internal face of the existing glazed shop front at entrance level.
The development will consist of the erection of new signage consisting of: Vinyl graphic details applied internally to the glazing in the entertainment/ leisure unit. 1 No. perspex sign over the entrance doors in the covered external entrance space to the entertainment/leisure unit. 1 No. powder coated stainless steel sign with opal acrylic face internally illuminated with LED fittings, located internal to the premises of the entertainment/ leisure unit, pole suspended from the soffit facing onto the covered external entrance space. 2 No. powder coated stainless steel signs with opal acrylic faces internally illuminated with LED fittings, on the exterior of the building facing onto Dundrum Town Centre and Balinteer Road. 1 No. stainless steel sign to match landlord’s existing signage on the exterior of the building facing onto Dundrum Bypass.
Permission for development. The development will consist of
Permission for development. The development will consist of the changes to previously approved planning permission, ref: D20B/0105, to include a new dormer to the front of the proposed dwelling.
Permission for development consisting of enlargement of the front windows, a new single storey extension to the front, a new dormer to the front, and a new two storey extension to the side and rear of the existing house, new rooflights, internal alterations and associated site works.
Planning Permission sought to widen existing vehicular entrance, provide new pedestrian site entrance and all associated site development works.
Planning Permission sought for demolition of existing single storey sunroom (9.6 sq. metres), erection of a new rear single storey residential extension (29.7 sq metres), widening of existing vehicular entrance, new pedestrian entrance, internal and external alterations/modifications to existing two storey dwelling house, all associated site development work and new temporary site entrance for construction phase of development. Temporary site entrance will be closed on completion of building works.
Permission is sought for an extension to the existing two-storey hipped-roof semi-detached house on a corner site, including a new two-storey hipped-roof extension to the front and side, and a partial flat-roof two-storey rear extension, new roof over existing sun room, new Velux windows to the main roof, widening the front vehicular access, relocation of the side gate, some internal alterations, and associated site works
Permission is sought for 2 storey front extension, extension to the side over existing converted garage, which will wrap around the back on both levels to connect with existing sunroom, new roof over existing sunroom, new Velux windows to front side and rear of the existing roof, widening existing vehicular access gate, moving existing side access further down the rear of the garden, some internal alterations and associated site works.
Permission for development. The development
Construction of a new dormer window extension to side of existing dwelling to incorporate extended landing & new bathroom at attic level, internal alterations and all associated site works.
Permission for the change of use of unit CSC 1.1M
The development will consist of: retention of current external signage to Hugo Boss shop unit at Dundrum Town Centre.
Demolition of the existing front porch, side extension & garage; the removal of the existing hip roof at the side and its replacement with a gable roof; Construction of a single storey extension to the front and single storey extension to the rear and a double storey extension to the side; one dormer extension at the rear & an attic conversion; new rooflights to the front; the widening the existing vehicular access, internal alterations and all associated site works.
Front single-storey extension, Two-storey extension to the side with gable to the front at roof level. Single-storey extension to the rear. Attic conversion for storage. With two dormers to the rear and a raised gable to the side. Roof window to the front roof area. Demolition of shed.
Permission for development. The development will consist of: The demolition of existing (i) north & eastern elevation walls (22 linear meters)., (ii) south elevation wall (8.5 linear meters), (iii) part of existing pitched roof to north, south & eastern elevations (40sqm), (iv) adjoining flat roof side extensions to the eastern elevation (25sqm) and (v) existing chimney. The construction of a new (122sqm) part two storey extension to the east. The design includes associated internal modifications; elevation changes; changes in level; 4no. proposed velux rooflights to north & south slopes of existing pitched roof, 2no. new ground floor windows to existing north elevation; Hard and soft landscaping; and all associated site development works above and below ground. The works will increase the floor area of the dwelling from 98sqm to 220sqm.
Permission is sought for the demolition of the garage to the side and the extension to the rear of the property and the construction of a new single story extension to the side and rear of the property as part of the refurbishment of the lower ground floor. Other works to the existing house will include the resizing of exiting window opes to the side and rear to suit new internal alterations, new rear bay windows to replace the existing and the insulating and reroofing of the flat roofs to the front and rear bay window. The works will also include a new patio the rear, landscaping to the rear and all associated site works.
Permission to demolish a single storey workshop building
Conversion of their attic to storage including Changing the existing hipped end roof to a gable end roof and a velux rooflight to the front all at roof level.
Permission for the development of the subdivision of an attic conversion to include 2 dormer windows to the rear, 2 roof lights to the front, new gable end wall to the roof and first floor extension to the rear.
Balance Saunas Ltd. trading as The Barrel Sauna intend to apply for retention permission. The development to be retained consists of four wood burning saunas, cold plunges, showers and ancillary wellness, changing and relaxation area, twenty bicycle spaces, and 1 cargo bike space and all associated development works for the reconfiguration of the undercroft, advertising signage, site landscaping, mural, services and all ancillary development.
Replacement of 1x advert comprising of 4 x internally illuminated letters on the external entrance of the building. Total size of sign is 3.14 m x 0.71m.
Permission for development of the extension of the existing retail unit at mezzanine level by 55.22sqm. This extended unit will not result in any elevational changes to exterior elevation of the main centre.
Application for Retention Permission. The development consists of the change of use of c. 79.5 sq m from public house use (ancillary pool hall) to gym use at Lower Ground Floor Level.
Permission for the extension and remodification of existing
The development will consist of: a. The provision of a new single storey flat roof extension to rear and side of property. b. the removal of the existing garage roof, window and the provision of a privacy screen in lieu to the front and side of the property. c. The complete refurbishment of the retained existing property inclusive of all internal modifications, rooflights, site works and drainage.
Planning Permission sought for a new vehicular access and all associated site works to the front of existing dwelling house at 1A Frankfort Park, Dundrum, Dublin 14, (D14ET20).