(i) Demolition of the existing industrial buildings (2,518sq.m);(ii) Construction of a 'build-to-rent' housing development providing a total of 245 residential apartments (comprising 69 studio units, 56 one-bed units and 120 two-bed units) in a six to eleven storey building over basement. Each apartment has associated private open space in the form of a ground floor terrace or a balcony and has access to 21 communal amenity spaces (totalling 880sq.m), including a communal gym (82.5sq.m), and a ground floor level landscaped courtyard. The development is served by an underground carpark (accessed from the Cookstown Road extension currently under construction) providing a total of 79 parking spaces (including 75 standard spaces and 4 mobility impaired user parking spaces), and 468 bicycle spaces (388 resident spaces at basement level and 80 visitor spaces at ground floor level in the central courtyard and on street);(iii) 2 commercial units (comprising 129.4sq.m and 126.5sq.m and accommodating Class 1, 2 and 8 uses as per the Planning and Development Regulations, 2001-2019, as amended) at ground floor level; (iv) associated site and infrastructural works are also proposed which include: foul and surface water drainage; attenuation tanks; lighting; landscaping; boundary fences; plant areas; ESB substations; internal hard landscaping, including footpaths and street furniture; and all associated site development works.
Fit out of attic for bedroom, office and ensuite. 4No. new windows to existing dwelling, 1no. window to the front gable, 1No. new rooflight on front roof, 1no. window to side gable and new rooflight to rear.
3 new windows to the existing house; 1 window to the front gable; 1 ‘Velux’ to the front roof and 1 window to the side elevation.
Windows to the rear of existing house and an alteration to size and proportions of the previously granted (ref. SD20B/0538) window to the upper front gable of the house.
Redevelopment of existing grease store through the increase in footprint of 9sq.m and the increase in height of 2.8m to a level of 62.242sq.m to match the adjacent existing ingredients dispensary and the replacement of the existing shutter doors; Increase in height of 1.097m of the existing workshop area to a level of 59.180m to match the adjoining boiler house and the replacement of the existing roof to accommodate an internal washroom.
Demolition of the existing Unit 1 building at the eastern end of the site and the construction of a new enclosed van and truck loading area which shall contain two articulated vehicle loading docks on its northern gable along with a large roller shutter door providing access to twenty internal van loading points and a finished goods storage area.
Dishing of public footpath, verge and kerb. Retention of widening of vehicular entrance and all associated site works.
Replacement of signage on the premises front elevation.
Front entrance porch.
On a site bound by Belgard Road (R113) to the east, Belgard Square North to the North, Belgard Square East to the west and Clarity House to the south, demolition of all existing structures on site (with a combined gross floor area of c. 3625sq.m); The construction of a mixed-use residential development set out in 3 blocks including a podium over a basement, ranging in height from 2 to 13 storeys (with core access above to roof terrace), comprising 334 residential units of which 118 will be Build to Rent (BTR) residential units, with associated amenities and facilities across the development; 4 retail/café/restaurant units and 3 commercial spaces associated with the 3 live-work units (723sq.m combined); Childcare facility (144sq.m); 670 bicycle parking spaces including 186 visitor spaces; 117 car parking spaces (including 6 disabled spaces) are provided at ground floor and basement level; Communal space in the form of residential courtyards and roof terraces; Public open space provision including Homezone/tertiary route along the south of the site between Belgard Rd and Belgard Square East; The overall development has a Gross Floor Area of 29,784 sq.m; Of the total 334 residential units proposed, unit types comprise Block A (Build-to-Rent), 91 one bed units; 1 two bed 3 person units; 26 two bed 4 person units; Blocks B & C, 2 live-work studio units; 102 one bed units; 12 two bed 3 person units; 88 two bed 4 person units including 5 duplex units; 1 two bed 4 person live-work unit; 11 three bed units; A portion of the proposed residential development is a 'Build to Rent' scheme in accordance with Specific Planning Policy 7 and 8 as set out in the 'Sustainable Urban Housing: Design Standards for New Apartments (December 2020); All associated works, plant, services, utilities, telecommunications infrastructure, PV panels and site hoarding during construction; A Natura Impact Statement has been prepared in respect of the proposed development and accompanies this application; The application contains a statement setting out how the proposal will be consistent with the objectives of the relevant development plan or local area plan; The application contains a statement indicating why permission should be granted for the proposed development, having regard to a consideration specified in Section 37(2)(b) of the Planning and Development Act, 2000, as amended, notwithstanding that the proposed development materially contravenes a relevant development plan or local area plan other than in relation to the zoning of the land.
Attic conversion with projecting dormer window to rear roof and 2 no. velux windows to front roof, new study / storage facility, and all associated site works.
Addition of 2 windows to the existing house, 1 dormer window and 1 'Velux' to the front roof.
Ground floor, single storey extension with canopy/apex roof over to front of house.
Single and two storey extension to the rear with pitched gable end roof and two dormers; new single storey extension with hip roof to the front; demolition of the existing shed to the rear; new vehicle access to the front with dished footpath; attic conversion for storage incorporating gable end distorted window at the side; dormer window and 'Velux' roof lights to the rear.
Conversion of existing attic space comprising of modification of existing roof structure, new access stairs and flat roof dormer to the rear.
Attic conversion for storage with dormer window to the rear. Two new gable windows one in each gable. Two new velux windows to the front roof area.
Conversion of existing attic space comprising of modification of existing roof structure; new access stairs; A-style roof dormer and roof window to the front and 4 roof windows to the rear.
The fit out of attic for bedroom, storage and ensuite. The addition of 3 no. new windows to existing dwelling, 1 no. new dormer window to the front and 2 new rooflights to rear and relocation of 1 no. solar panel.
Single storey extension with tiled roof to the front & first floor extension with a tiled roof over existing rear extension to the existing two storey end of terraced dwelling with alterations to existing rear extension tiled roof; new high level window in existing gable wall structure; internal alterations & associate site.
Widen pedestrian access to create a vehicular access and hard standing parking area to the front; Retention of single storey extensions to rear; Retention of garage to the rear and permission for the Change of Use to quiet room, wet room and play room.
PERMISSION: The development will consist of the construction of a first-floor extension at the rear of the existing house with a pitched roof whose ridge will match the level of the existing ridge.
The development shall consist of the phased partial demolition, reconstruction and extension of the existing Bakery Production and distribution complex at their expanded site in Greenhills Industrial Estate. The overall development shall consist of a number of consecutive phases designed and implemented to ensure the maintenance of the ongoing operations of the facility namely: 1) Area 1 a. Demolition of the existing Varian brushes building which forms part of the expanded site. b. Creation external staff parking area constructed the North Eastern End of the site along with a new Public footpath and cycleway constructed around the Northern Boundary and providing access from St James Road into and through Greenhills Industrial estate. c. New Boundary wall formed with a brickwork wall with piers and Steel fence to match existing. d. Van Loading Building measuring 3082m2 on plan with a height of circa 5m at eaves level. The building shall be formed with a curved green roof with Solar panels and a step at the external elevation to reduce massing to the surrounding properties. The building shall be externally clad with Insulated Microrib panel which shall be augmented on the Southern and South Eastern elevations with Acoustic protection to minimise the operational noise at the boundary. 2) Area 2 a. Demolition of the existing centrally located two storey Office & Welfare accommodation and Van loading canopies. b. Construction of new Welfare Accommodation housing the Staff facilities including Staff Entrance, bike parking, Changing areas, toilets, canteen and office. Facility shall be formed in a Two storey concrete building clad with rendered blockwork to a parapet level and punctuated with windows along the Northern elevation. The footprint shall measure 829m2 and the overall height to parapet shall be 11m2. The roof shall house a mixture of green roof and solar panels. c. Reroofing and expansion of existing Packing operations to the South and adjoining the New Welfare Accommodation. Construction shall be of Structural Steel lattice girders supporting a mixture of Trapezoidal Insulated roof panels and built up insulated roof system. The Southern wall shall be externally clad with Insulated Microrib panel which shall be augmented on the Southern and South Eastern elevations with Acoustic protection to minimise the operational noise at the boundary. The extended Packing area shall measure 1273m2 on plan with a general height above floor level of 10.5m. 3) Area 3 a. Construction of new Bakery Facility on the site of the existing Car Park and loading area at the North Western edge of the site, directly adjoining the existing facility. The bakery shall measure 3007m2 and shall be 11m high at the boundary stepping up to 14m on the Bakery proper and 18m on the North Western Corner. The facility shall be completed with a mixture of rendered blockwork and brick work panels with high level windows into the Production area. The bakery shall be constructed of Structural Steel lattice girders supporting Trapezoidal Insulated roof panels solar panels. b. Demolition of the existing services area at the Western boundary. c. A three storey Plant and Process Area shall be constructed on the Western elevation and shall be constructed in a Concrete frame and clad with insulated Cavity walls finished with a mixture of Brick and Plastered blockwork external Elevations. The construction shall be completed with a tower structure in the North Western Corner. Roof Construction shall be an insulated built up system supported from a precast concrete superstructure. d. Reroofing of the existing batch and Multiplant Bakery areas to the South and adjoining the New Bakery. The existing low double pitch roofs shall be removed and a new higher Structural Steel lattice girder structure supporting a mixture of Trapezoidal Insulated roof panels and built up insulated roof system installed along with Solar Panels. e. Reroofing and regeneration of the existing Pan Plant located on the Southern boundary to consist of the replacement of the existing external envelope of the building. 4) Area 4 a. Demolition of the existing Administration office and Silo Enclosure. b. Construction of a new three Storey Office block with ground floor covered car parking. The building shall be completed in a concrete frame and precast concrete floors. The facility shall be completed with a mixture of rendered blockwork and brick work panels with strip windows to the Western elevation. c. Realignment of the existing Flour Silos and the installation of four additional silos which hall shall be contained within a Micro rib clad steel Enclosure for visual purposes. d. Alterations to existing boundary and the creation of a new car park and Intake Vehicle unloading area including the relocation of the existing entrance gates and the addition of a new gateway specifically for the office area. e. Redefinition of the existing boundary treatments and improvements to the existing internal estate footpath network with increased definition of cyclist facilities and road separation. Improved lighting installations to the environs of the development and adjoining areas. f. Installation of Sustainable surface water drainage and retention systems to all upgraded areas.
Retention permission is sought for two-storey extension to side and rear of property and permission for internal alterations to said extensions and additional single-storey extension to rear of property and all associated site works.
Fit out attic for bedroom, office and en-suite; 3 new windows to existing dwelling; 1 window to the front gable; 1 window to side gable and new rooflight to rear.
Fit out of attic for room and bathroom; addition of 3 new windows to existing dwelling; 1 window to the front gable and 2 new rooflights to rear.
Demolition of Shed to rear, construction of 1 detached 3bed 2 story house with 2 storey bay to front, 3 rooflights to rear, new vehicular access & car parking in front garden and all associated site works
Demolition of existing single storey structure, Construction of a new 2 storey detached dwelling, relocated driveway entrance, into existing dwelling, new driveway entrance to serve proposed dwelling, site boundary treatments, SuDS drainage and all associated site works.
Fit out attic for bedroom, Office and ensuite. The addition of 4No. new windows to existing dwelling, 1no.window to the front gable, 1 no. window to side gable, 1 no., rooflight to front and 1no rooflight to rear
The proposed development will consist of alterations and extension of the existing dormer dwelling to provide for the demolition of the existing single storey rear return and the construction of a new single storey flat roof rear extension (circa 45 sq.m) to provide a kitchen, dining and family area and the relocation of the existing window on the south facing elevation serving the existing shower room at ground floor level to the east facing elevation.
Demolition of single storey detached garage in rear garden; construction of detached, two storey three bedroom dwelling with attic conversion in rear garden; new vehicular entrance & partial dishing of kerb.
The fit out of attic for bedroom, storage and ensuite. The addition of 4 no. new windows to existing dwelling, 1no. new dormer window to the front 2 no. rooflights to front and 1 no.enlarged rooflight to rear
The construction of a single storey building to be used for Physiotherapy. Access/egress from the proposed development is via the existing club entrance on Monastery Road, Clondalkin, Dublin 22.
Removal of Condition No's 2 and 6 of Reg. Ref. SD18A/0289: operational times of the weight and fitness training building to be from 06.00 hours to 22.00 hours Monday to Friday and 8.00 hours to 21.30 hours Saturday and Sunday.
Proposed single-storey flat roof extension to the front, including three roof lights.
Fit out attic for bedroom, office and en-suite; 3 new windows to existing dwelling; 1 window to the front gable; 1 window to side gable and new rooflight to rear.
Fit out of attic for bedroom, office & en-suite; addition of 4 new windows to existing dwelling, 1 window to the front gable, 2 windows to the side gable & new rooflight to rear.
Demolition of previous flat roof rear extension; single storey mono pitched roof front extension (full width of existing house); single storey flat roof rear extension; conversion of existing garage to habitable use and internal alterations at ground and first floor levels; Attic conversion to include the reconfiguration of the side roof profile from hipped to half hipped and including dormer window structure within the rear roof slope; rooflights within the front and rear slopes; detached single storey flat roofed shed/home gym building within the rear garden; all necessary ancillary site development works to facilitate this development.
The development shall consist of the Demolition of the existing centrally located Single Storey industrial unit and ancillary offices housing the operations of AE Doors and the construction of a new three-storey Office and Welfare block housing the Staff facilities including Staff Entrance, bike parking, changing areas, toilets, canteen and office facilities. The development shall be formed in a three-storey steel and precast concrete structure clad with rendered blockwork to a parapet level and punctuated with Vertical Strip fenestration on the North and West Elevation with a full elevation of curtain walling on the North West Elevation incorporating vertical brise soleil. Ground floor shall house the Welfare facilities with two storeys of office above. Each floor shall measure 745 sqm giving an overall building floor area of 2,235 sqm. The overall height to parapet shall be 12m, giving a level of 67.59m OD. The roof shall support an extensive green roof. Some local car and bike parking shall be provided however the majority shall be housed with the wider Brennans site. A new boundary wall shall define the site and shall be set back to improve the footpath width. Local Landscaping shall be installed within the boundary incorporating the maximum permissible Suds infrastructure.
Single storey front extension to living room and hall; new tiled roof over existing garage to match roof over living room and hall; widening of vehicular entrance and all associated site works.
Partial Demolition of Garage Area. Conversion of remaining portion with new ground floor extension to front, 2no of dormer type windows to front elevation, 1 no of dormer type window to rear elevation with internal modifications and associated site works
Amendments to a previously consented natural gas combined heat and power system and associated infrastructure (Ref. SD21A/0013).
Installation and operation of a natural gas combined heat and power system and the associated infrastructure.
The addition of 4 new windows to the existing house; 1 window to the front gable; 1 'Velux' to the front roof, 2 to the side elevation and an addition 'Velux' to the rear.
Single storey porch and kitchen extension to the front, convert existing garage to a study, erect a single storey extension to the rear and widen the existing vehicular entrance from 2.5 metres to 4.0 metres.
Proposed single-storey flat roof extension to the front with three roof lights, and an attic conversion for storage, including 1 no. dormer to the front and 2 no. dormers to the rear.
Conversion of existing attic space comprising of modification of existing roof structure, new access stairs and flat roof dormer to the rear.
Attic conversion with flat roof dormer to rear providing a permanent stairs access, a non-habitable attic room and adjoining bathroom along with associated internal modifications and site works.
Conversion of existing attic space comprising of modification of existing roof structure, new gable window, new access stairs, flat roof dormer to the rear and 2 no. roof windows to the front.
Planning Permission sought for proposed two storey pitched roof extension to side (floor area = 12.17sq.m) with a proposed ridge height of 6.935m high, complete with first floor bedroom window to side/N.West elevation & 2no. 'velux' roof lights to front/S.West elevation together with associated site works
The demolition of three existing apartment units (c. 239sq.m) and bin store (c.18sq.m) and the construction of a residential development arranged in two building blocks (Block A & Block B) ranging from 3 to 6 storeys in height over basement level (c. 3,728sq.m, including basement). Block A comprises 11 residential apartments (c. 1256sq.m) in a 5 to 6 storey building and including a ground floor level cafe (c. 93sq.m) at the buildings south eastern corner; Block B comprises 15 residential apartments (c.1393sq.m) in a 3 to 5 storey building; The proposed development will comprise 26 new residential units (5 studio apartments, 6 1-bedroom apartments, 7 2-bedroom apartments & 8 3-bedroom apartments) with associated balconies and terraces. The proposed development will comprise a total of 40 apartment units derived from 26 new apartments and 14 existing apartments; relocation of existing basement access on Old Greenhills Road and the upgrade and extension of the existing basement level; provision of internal footpaths; landscaped communal open space (including outdoor gym equipment, children's play area and 'working from home' area); public open space; 13 car parking spaces and 74 long-stay bicycle parking spaces and 1 motorcycle parking spaces at basement level; 2 shared car parking spaces and 20 short-stay bicycle parking spaces at surface level (15 car parking spaces, 94 cycle parking spaces and 1 motorcycle parking in total); all piped infrastructure and ducting; elevation treatments; plant room; lift access and stair cores; hard and soft landscaping and boundary treatments; changes in level; waste management areas; attenuation tank; backup generator; solar photovoltaic panels; lighting; and all associated site development and excavation works above and below ground. The subject site is currently partly developed with an existing residential scheme known as Greenhill's Court comprising 17 apartment units in 4 apartment blocks ranging in height from 2 to 4 storeys, including basement car park all on a site of approximately 0.23ha. on lands bounded to the north by St Basil's Training Centre, to the east by Greenhills Road, to the west by Old Greenhills Road, and to the southeastern corner by Main Street, Tallaght, Dublin 24