A 10 year permission for the construction of a Solar PV Energy development within a total site area of up to 32 hA, to include one single storey electrical substation building, electrical transformer/inverter station modules, battery storage modules, solar PV panels ground mounted on steel support structures, access tracks, fencing and associated electrical cabling, ducting and ancillary infrastructure
A 38KV grid connection cable and associated infrastructure to connect the approved Johnstown North solar farm (consented under planning ref. 171497) to the existing Arklow 220kV Substation comprising the laying of a 3,190m Underground Cabling (UGC) and associated infrastructure, located at Dublin Road, Arklow, Co. Wicklow
Proposed dwelling, waste water treatment system to EPA standards, garage, entrance and associated works
Sunroom extension and additional first floor residential accommodation together with free standing storage outbuildings for uses ancillary to main house
The conversion of an old farm building into a self contained dwelling and also for the installation of a new on-site wastewater treatment system and all associated site works
The conversion of an old farm outbuilding into a self contained dwelling and also for the installation of a new on-site wastewater treatment system and all associated site works
Proposed dwelling, waste water treatment system to EPA standards, garage, new entrance and associated works
To amend the design of the approved development (Planning Reference: 17/1497) which comprises a Solar PV Energy Development. Proposed amendments include (1) change in location and size of substation, (2) two additional temporary construction compounds will be located at the site entrances, (3) the number of modules will decrease, (4) the number of pile driven poles will decrease, (5) the size and number of transformer stations will increase, (6) the total fencing area will increase (7) the total amount of fencing posts will increase, (8) up to 21 CCTV cameras will be installed (9) access tracks will be optimised and increased in width and length, and (10) increase in operational lifetime from 25 years to 35years
Section 42 - extension of appropriate period - 16/176 - 10 year permission for the construction of a Solar PV Energy development within a total site area of up to 13.76 ha to include one single storey electrical substation building, electrical transformer / inverter station modules, solar PV panels ground mounted on steel support structures, access roads, fencing and associated electrical cabling, ducting and ancillary infrastructure
(A) The erection of an Independent Living Unit (granny flat), (B) Upgrading of existing sewerage treatment facilities to include a Bio-Crete Waste Water Treatment Plant with sand polishing filter to comply with EPA Code of Practice 2021 and (C) Ancillary site works
A 36m² garage to the lower ground level of the north east elevation & Permission to erect a 16m² extension to the south east elevation and a 42m² extension to the north east elevation with alterations and revisions to the elevations and internal layout of the existing dwelling along with all associated site development works
Construction of a single storey detached training room structure, ancillary to the main Club House, with new course WC connected to the existing wastewater treatment facility on site and all associated landscaping works
Construction of a 40 bedroom extension to existing hotel as granted under PRR 02/6916 & 03/8031, including associated alterations and additions to existing car park layout and associated works to existing effluent treatment system, together with revisions to site boundaries, all together with associated site works
Demolition of existing storage shed, a new shed to serve as house ancillary storage and hobby shed to store vintage cars and associated site development works
Demolition of existing single storey shed and garage to rear, construction of new part single storey part storey and a half extension containing 2 dormer windows to rear, removal of existing septic tank and new replacement proprietary effluent treatment system and all associated site works
Construction of a bicycle shelter and storage, including ancillary walkers equipment storage/drying room and garden maintenance equipment storage room, all together with associated site works
Proposed change of use from existing agricultural storage shed to equestrian veterinary clinic and associated site works
Single storey dwelling with garage, entrance, well, effluent treatment system to EPA and all associated site works
Construction of a bungalow with garage, new entrance and access driveway, new treatment system and percolation area to current EPA standards and all ancillary site works
Revised site boundaries to previously granted permission (Planning ref 21/1487) to include relocation of entrance and all ancillary site works
1) a single-storey sunroom extension to the north west elevation of the existing dwelling and 2) a domestic storage shed along with all associated site development works
Construction of a 24 metre high free standing communications structure with its associated antennae, communication dishes, ground equipment, fencing and all associated site development works. the development will continue to form part of existing 3G and 4G Broadband network
Dwelling and garage with services and all associated site development works
Of an existing telecommunications support structure (previously granted under Plan Ref No 07/374) together with associated ground equipment cabinets within a fenced compound
Construction of a new detached single storey dwelling, with separate detached single storey domestic garage, and new on-site waste-water treatment facility to current EPA standards, together with a new private well, and all ancillary site works
Single storey dwelling house, garage, wastewater treatment unit and percolation area, new domestic vehicular entrance onto the existing laneway and all associated site works
Single storey extension (19.25 sqm) to side of existing dwelling, all above with associated site works
A) Partial demolition of the existing single-story dwelling, including changes to fenestration and internal layouts and rear extension, b) Construction of a new pitched roof and dormer extension, c) Demolition of the existing garage and construction of a new split-level section connected to the main house via a flat roof link d) Construction of a new septic tank, percolation area, and all associated site works
The development will consist of (a) a partial demolition of the existing single-story dwelling, garage and store building, including (b) changes to fenestration and internal layouts, (c) construction of first-floor flat roof extensions to both and (d) single-story link connecting both buildings to create one habitable use (e) construction of a new septic tank and percolation area and all associated site works
The construction of a domestic single storey extension to existing dwelling and all associated works
The construction of a single storey extension to the side of the school building and all associated works
Demolition and removal of the existing 3 bed single storey detached dwelling ‘Woodview Cottage’ (84sqm) and for the construction of a new 4 bed two storey detached dwelling (180sqm), for connection to all existing site services above and below ground, for all associated hard and soft landscaping and for the construction of a new 1.2m high timber post and rail fence on the south eastern site boundary
Domestic garage as built and associate works
Change of use from residential to short-term letting use and associated works
Alterations and additions comprising the demolition of existing single storey sunroom to gable end, and the construction of a new single storey living room extension in lieu of same, together with the construction of a new 2 storey dormer extension to the rear, including alterations to exiting window openings to each gable end at first floor level, and new patio doors in lieu of an existing window opening to front elevation at ground floor level, and all ancillary site works, connecting into existing services, at an existing detached 2-storey dormer dwelling
Construction of a garage/store associated with the domestic use of the existing dwelling, together with landscape screening and associated site works
Use of building 2 as a self-contained granny flat including built in kitchen
Bungalow, effluent treatment unit with discharge into public sewer and associated site works, revised location of access point from public road to adjoining Cherrybrook premises
Partial demolition works to existing single storey dwelling and the construction of new single storey extension and alterations to the existing building footprint, site boundary works comprising the setting back of a portion of the existing roadside boundary and all other ancillary works
1. The demolition of the existing attached shed, porch and outhouse 2. Construction of a new single storey extension to side and rear of the existing cottage 3. Widening of the existing vehicular entrance and blocking up the other entrance 4. Removal of existing septic tank and installation of new treatment unit and soil polishing filter to current standards all ancillary site works
New single storey log cabin style structure for use as a home office/art studio/gym/store, floor area 34.25sqm, located to the rear of existing dwelling, along with all associated site works
Garage and adjoining extension
Construction of a dwelling and all associated works on site
A) the relocation of and minor alterations to the rear extension previously granted permission under planning no. 066119, b) the construction of a detached domestic garage to the rear of the existing dwelling and c) all associated works
Proposed first floor extension to the side of dwelling and associated works
1. new spit level dwelling comprising 154 sq.m. 2. vehicular entrance. 3. connection to all public services. 4. all necessary ancillary works to facilitate this development
Dwelling, waste water treatment system to EPA standards, garage, entrance and associated works
Removal of existing septic tank and installation of a new wastewater treatment unit, a TER3 filter unit and 23sqm attenuation layer filter to current standards and including all associated works
The decommissioning and demolition of the existing Avoca Wastewater Treatment Plant, and the construction of a new Wastewater Treatment Plant to include: a new foul pump station, inlet works, storm tank, aeration tank, 2 no. final settlement tanks, sludge drying reed beds, 2 no. RAS/WAS Pump Stations, new administration building, final effluent outfall headwall, emergency flow headwall, surface water drainage settlement pond and outfall, and all ancillary works including pipework, pumps, sumps, chambers, air blowers and tanks;new access off the Tower Avenue: and all associated site development, site excavation and landscaping works, including fencing/boundary treatments, above and below ground
2 no. Glamping pods and new sewage connection to the existing BioCycle wastewater treatment system and associated site development works