to
to

Planning records

Showing 501-550 of 2,129 public records
Page 11 of 20
  1. © OpenStreetMap
    2460221Granted

    Moatpark, Ballyragget, Co. Kilkenny

    A 10-year planning permission and a 35-year operational life for an energy storage facility comprising (i) energy storage containers installed on concrete plinth foundations; (ii) electrical transformers; (iii) underground electrical and communications cabling; (iv) provision of a new access point from the R432; (v) on-site access track; (vi) security fencing and security gates; (vii) pole-mounted security cameras; (viii) ancillary electrical equipment and storage containers including a staging area; and, (ix) all associated and ancillary site development, drainage, landscaping and reinstatement works. This planning application is accompanied by a Natura Impact Statement.Decision record indexed
    Decision23 January 2025View record
  2. © OpenStreetMap
    4424/24Granted

    46 Pearse Street, Dublin 2, D02H920

    PROTECTED STRUCTURE: RETENTION: The development will cosist of the retention of (a) The revision of the elevation to the rear return to the rear of the property facing onto Magennis Place previously granted under File Register reference 3330/18, to provide for a calp limestone traditional stone wall, rebuilt using stone salvaged from site with flush NHL pointing in lieu of the previously granted 'rendered panels' and associated motifs.Decision record indexed
    Decision23 January 2025View record
  3. © OpenStreetMap
    2461572Refused

    Carrowneany, Williamstown, Co. Galway

    For the construction of a new 1-1/2 storey cookery school with demonstration kitchen, storage, restaurant/dining area, reception and sanitary facilities on the ground floor with accommodation on first level for 12 no. persons and games room. Adjoining additional accommodation on ground floor level only for 20 no. persons. Covered outdoor seating areas and storage space. Wellness patio and biodiversity pond. Glass house and organic garden. 3 No. 2 bed Eco cabins. Surface parking, including EV parking and charging points, and associated access roadways and hard surface circulation spaces within the site extending to the site entrance onto the public road. Extend roof over existing slab and roofless cubicle for storage purposes. Waste Water Treatment Plant and polishing filter to accommodate waste that cannot be treated by composting, together with all associated services, building signage and site signage and landscaping. The above project is Co-funded by the Government of Ireland and the European Union through the EU Just Transition Fund. Gross floor area of proposed works: 675 sqm (commercial)Grounds not yet categorised
    Decision22 January 2025View record
  4. © OpenStreetMap
    2460907Granted

    An Caorán Beag, Pointe, An Cheathrú Rua

    Is éard atá I gceist sa bhforbairt ná teach cónaithe aon stór amháin, bealach nua isteach sa suíomh agus cabhsán, tírdreachú mar aon le córas cóirealá fuíolluisce. Spás urláir comhlán na n-oibreacha beartaithe: 208.00 sqmDecision record indexed
    Decision21 January 2025View record
  5. © OpenStreetMap
    2460474Granted

    Killeroran Tullyroe Tully Srahaunnagort (or Thornfield) and Garreer, Ballygar, County Galway

    For decommissioning and removal from the site of the existing steel modular site welfare unit 23 m², tanks, pipework, existing boundary fence and all other associated clearance works; construction of a new below-ground storm water tank along with all associated ancillary equipment; construction of a new below-ground circular primary settling tank; construction of a new stormwater overflow outfall from the proposed stormwater tank discharging to Ballygar Stream; construction of a new below ground forward feed pumping station downstream of the proposed primary settling tank to lift flows to the proposed trickling filter splitter chamber; construction of 2 no. new below-ground final settlement tanks,; construction of 6 no. new sludge drying reed beds (SDRB); provision of 2 no. new progressive cavity pumps. Construction of a new below-ground SDRB and sludge recirculation pump sump; construction of a new below-ground final effluent pumping station and approximately 2.5km of rising main and approximately 328m of 225mm gravity sewer network and associated manholes and headwall for discharge to the River Suck; and construction of a control building to include a laboratory, workshop/storage room, control room, toilets and kitchenette of approximately 123 m² and approximately 5m in height with up to approximately 62 m² of roof mounted solar panels. All associated works including all associated interconnecting above and below ground pipework, valves, telemetry, plant and equipment, construction of an internal access road, 3 no. parking spaces, EV charge point, replacement of existing security fencing with new security fencing of 2.4m high green steel palisade fence, generator with integrated fuel storage tank, lighting columns of maximum height 6m and landscaping. This application is accompanied by a Natura Impact Statement. Gross floor space of proposed works: 123 sqm. Gross floor space of any demolition: 23 sqmDecision record indexed
    Decision21 January 2025View record
  6. © OpenStreetMap
    4402/24Refused

    37 Wellington Road, Ballsbridge, Dublin 4

    PROTECTED STRUCTURE: Permission sought for a combined vehicular/ pedestrian entrance in the front boundary wall comprising new and rebuilt piers including a new pair of gates, and provision of car parking including an EV charging point to part of the front curtilage of No. 3 7 Wellington Road, Ballsbridge, Dublin a Protected StructureGrounds not yet categorised
    Decision20 January 2025View record
  7. © OpenStreetMap
    D24B/0505/WEBGranted

    Spanish Point, Mart Lane, Foxrock, Dublin 18, D18K5X2

    First floor extension to side and rear consisting of a bedroom with en-suite andDecision record indexed
    Decision20 January 2025View record
  8. © OpenStreetMap
    WEB2236/24Granted

    39 Mountjoy Square, Dublin 1

    PROTECTED STRUCTURE. PERMISSION & RETENTION. The development will consist of restoration and preservation works to the brick facades including repair, re-pointing, and consolidation of the brickwork, rendering in lime plaster to the rear return, the cleaning and the re-pointing of the front steps, the repair of the railings to the front, retiling of the entrance hall and replacement of rainwater goods and doors to basement. Retention permission is sought for the installation of internal linings to the basement and ground floor level return walls and ceilings, including breathable insulation and plasterboard to basement walls internal walls.Decision record indexed
    Decision17 January 2025View record
  9. © OpenStreetMap
    2460131Granted

    Hacketstown Road (Pollerton Road) (R726), Kernanstown, Co. Carlow

    Development at a site of 1.52 Ha. The development will consist of: the construction of 72 No. Residential units and all ancillary works, consisting of: 18 No. 2 storey houses (4 No. 2 bed terraced units (c. 81.8 sqm Gross Floor Area (GFA)); 4 No. 3 bed terraced units (c. 97.5 sqm GFA); and 10 No. 3 bed semi-detached units (c.106.7 sqm GFA); and 54 No. duplex apartment units within 7 No. 2 storey blocks consisting of: 27 No. 1 bed units (ranging in size from c. 52.2 sqm GFA to c. 77.0 sqm GFA); and 27 No. 2 bed units (ranging in size from c. 82.2 sqm GFA to 94.1 sqm GFA); as follows: 1 No. duplex block (Block A type) comprising 3 No. 1 bed units; 3 No. 2 bed units; with balconies on the northern elevation at 1st floor level; 2 No. duplex blocks (Block B type), comprising 12 No. 1 bed units; with balconies on the northern and southern elevations at 1st floor level; 1 No. duplex block (Block C type) comprising 12 No. 1 bed units; with balconies on the eastern, western and southern elevations at 1st floor level; and 3 No. duplex blocks (Block types D, E and J) comprising 24 No. 2 bed units, with balconies on the eastern elevation at 1st floor level. The development will also consist of: modifications to the existing vehicular access from Hacketstown Road (Pollerton Road) (R726); the provision of 2 No. new pedestrian accesses from Hacketstown Road (Pollerton Road) (R726), 107 No. grade level car parking spaces, 18 No. visitor bicycle parking spaces and 2 No. bin storage areas. The development includes all associated landscaping works (including the provision of public and private open space areas), boundary treatments, site development works, site services (foul, surface water drainage, water supply and all other associated site excavation, infrastructural and site development works above and below ground30 conditions indexed
    Decision17 January 2025View record
  10. © OpenStreetMap
    24265Granted

    Kells Business Park, Cavan Road, Kells Co. Meath

    (1) the construction of a new light industrial/warehouse unit with internal office accommodation, reception, toilet and staff canteen, (floor area 1016m2). (2) on-site staff car parking, disabled parking and bicycle parking, (3) installation of EV charging points (4) 2.0m high security fencing to side and rear boundaries, (5) 1.0m high security fencing to front roadside boundaries, (6) signage on the building, (7) landscaping works, (8) connection to all services and (9) all necessary ancillary site development works to facilitate this development. The development requires and is accompanied by a Natura Impact Statement (NIS)Decision record indexed
    Decision15 January 2025View record
  11. © OpenStreetMap
    2460133Granted

    Mill Road Colp West, Drogheda, County Meath

    The proposed development includes the removal of interim accommodation permitted under Ref. No. LB190739 and Ref. 21/2336, and the construction of a new, 1,000 no pupil post-primary school (Roll No. 68348A), which will comprise of 43 no. classrooms, with associated laboratories and specialist classrooms, Multi-Purpose Hall, a Physical Education Suite including a Physical Education Hall, and all ancillary teacher and pupil facilities with a gross floor area of c. 11,302 sqm over 3 no. storeys. The proposal includes the removal of all interim accommodation on site, arranged across 12 no. blocks, with a cumulative GFA of c.4,203sq m (previously permitted under Reg. Ref. LB190739 and Reg. Ref. 21/2336) including the removal of 1 no. interim accommodation block, constructed under exempted development (c.249 sq m). The proposal also includes the demolition of a single-storey c. 190 sqm derelict building, associated with the former agricultural use of the site. Vehicular access to the subject site is proposed via a new priority-controlled T-junction located on the new link road to the southwest of the site, with associated tie-in works to the existing road network; 2 no. pedestrian and cyclist access points and 2 no. pedestrian only access points to the southwest boundary of the site; staff and visitor parking spaces and designated drop-off and set down facilities. The development will also include the provision of 1 no. external storage building (c.50 sqm); 1 no. bin store; bicycle and scooter parking; vehicle and bus drop off/set down areas; internal access roads; hard and soft play areas including 6 no. hard play court areas; piped infrastructure and ducting; plant and plant room; LPG Tanks Compound; electrical switch room; landscaping and boundary treatments; PV panels; EV parking facilities; external courtyards; disabled car parking spaces; site clearance works, comprising of the partial removal of hedgerows and a number of trees; stepped access routes; street and security lighting; signage; 2 no. attenuation tanks; surface water drainage and SUDs measures (including green roof provision); 5 no. flagpoles; piped infrastructural services and connections, hard and soft landscaping, ESB Substation, changes in level and all associated site development and excavation works above and below ground. The total site area is 5.26Ha. Significant further information/revised plans submitted on this applicationDecision record indexed
    Decision15 January 2025View record
  12. © OpenStreetMap
    2460237Granted

    Furnace or Bleankillew Td., Dromod, Co. Leitrim.

    Retention of 1) the widening and re-alignment of the vehicular access point off the public road 2) re-configuration and extension of the driveways and hard landscaped areas / water feature / raised flower beds / pathways around dwelling 3) installation of primary holding tank associated with wastewater treatment system at revised location and configuration 4) the management of surface water drainage within the site; 5) Provision of a steel garden shed and concreted area; 6) the construction of an additional first floor to garage containing domestic gymnasium and associated elevational changes 7) increased footprint of living room 8) elevational changes including amendments to the number and location of windows provided on the rear and side elevations of the dwelling, increase to overall dwelling height (600 mm), and the provision of additional rooflights on the dwelling. 9) Conversion of attic space post occupancy containing additional living/storage space, and associated elevational changes, which was granted planning permission under P20-203Decision record indexed
    Decision15 January 2025View record
  13. © OpenStreetMap
    2460722Granted

    Maxol Service Station Rathnew Tighe Avenue, Rossana Lower, Wicklow

    The proposed development will consist of: alterations to car parking provision (total car parking will reduce from 45 No. to 34 No. plus 6 No. EV charging spaces); construction of a roofed EV shelter and associated plant and substation within a 2.9m high fence; associated signage (6 No. x 2.5 sq m EV charge point signs, and an internally illuminated 4.8m high double-sided freestanding sign (total 19 sq m)); and hard and soft landscaping and all associated site development works above and below groundDecision record indexed
    Decision15 January 2025View record
  14. © OpenStreetMap
    2460466Granted

    Fough East, Main Street & Pier Road, Oughterard

    For the development consisting of the following: 1. Construction of a commercial building (3 Storey). 2. Construction of 2 no. (2 ½ storey) duplex buildings to provide for 7 no. ground floor commercial start up units and 8 no. 2 bed upper floor apartments. 3. Construction of 35 no. houses consisting of: a. 10 no. 4 bedroom 2 storey semi-detached houses, b. 1 no. 4 bedroom 2 ½ storey end of terrace house, c. 14 no. 3 bedroom 2 storey semi-detached houses, d. 2 no. 3 bedroom 2 storey end/mid terrace houses, e. 2 no. 2 bedroom 2 storey semi-detached houses, f. 6 no. 2 bedroom 2 storey terraced houses. 4. Provision of communal open space area with playground, private open space, public lighting, soft and hard landscaping and revised boundary treatments. 5. Car parking including dedicated EV charge spaces, ducting to all spaces for future electric charging points. 6. Provision of 2 no. vehicular entrances onto Pier Road. 7. Proposed pedestrian footpath along Pier Road. 8. Provision of bicycle and bin storage. 9. Provision for ESB Substation. 10. Connection to public sewer and provision for adjoining house to the north-east (Eircode H91DX8R) to connect to this sewer network, together with the decommissioning of the existing septic tank. 11. Connection to public watermain, surface water drainage, together with all associated site works and services. A Natura Impact Statement is submitted to the planning authority with this application. Gross floor space of proposed works: 4,028.00 sqm (house/s), 60 sqm (ESB substation), 728.80 sqm (apartment/s) & 823 sqm (comm/ind)Decision record indexed
    Decision08 January 2025View record
  15. © OpenStreetMap
    24/4139Granted

    Glanduff Kilbrittain Co Cork

    Permission for the construction of 19 no. houses, improvements to the junction of the R603 and the L-6105, 6 no. visitor car parking spaces along Meadow View Road, new pedestrian access points to the public amenity walk and community field, erection of ball stops nets and all ancillary bin stores, bicycle stores, car parking, landscaping and site development works. The proposed improvements to the public roads include traffic calming measures, the widening of the existing footpath, 1 no. new pedestrian crossing on Meadow View Road and 2 no. new pedestrian crossings on the R603. Access to the proposed development is via Meadow View. A Natura Impact Statement will be submitted to the planning authority with the application.Decision record indexed
    Decision20 December 2024View record
  16. © OpenStreetMap
    24/4044Refused

    Belvelly Port Facility Marino Point Marino Cobh, Co.Cork

    Permission for the construction of a grain storage and distribution facility and all ancillary site works. The proposed development consists of a grain storage building and grain handling storage building with associated headhouse structure. The proposed development also includes the provision of 2 no. weighbridges and ancillary weighbridge office building, ESB substation, the provision of rooftop PV panels, perimeter fencing and the additional port operational use of the existing jetty to facilitate cargo vessels. A Natura Impact Statement (NIS) has been prepared and will be submitted to the planning authority with the applicationGrounds not yet categorised
    Decision19 December 2024View record
  17. © OpenStreetMap
    2460348Granted

    Ballymurphy, Dunshaughlin, Co. Meath

    The development will consist of a modular building manufacturing facility and ancillary development. The proposed development includes: 1) Construction of approx. 7,632 sq. m. gross floor area (GFA) building, consisting of a single storey factory section of approx. 6,054 sq. m. GFA and a two storey offices and staff facilities section of approx. 1,578 sq. m. GFA; 2) Provision of hardstanding areas providing vehicle circulation areas, an area for storage of completed modular units and an area for storage of modular units for hiring; 3) Provision of 169 no. car parking spaces, including 34. no. provided with EV charging points; 4) Provision of 18 no. bicycle parking spaces; 5) Provision of internal access roads and footpaths; 6) Provision of surface water drainage infrastructure; 7) Provision of roof-mounted solar panels on the proposed building; 8) Site landscaping works; 9) Provision of fencing and gates; 10) Provision of signage consisting of 3 no. building elevation signs and 1 no. ground mounted sign at the site vehicular entrance; and 11) All associated and ancillary works. Significant further information/revised plans submitted on this applicationDecision record indexed
    Decision19 December 2024View record
  18. © OpenStreetMap
    2461779Granted

    CREESLOUGH, LETTERKENNY PO, CO. DONEGAL

    CONSTRUCTION OF A NEW CARPARKING AREA WITH 6 NO. EV CHARGING POINTS INCLUDING ALL ASSOCIATED SITE WORKS, WITHIN COMMERCIAL TOURISM DEVELOPMENTDecision record indexed
    Decision19 December 2024View record
  19. © OpenStreetMap
    2461810Granted

    CREEHENNAN, QUIGLEYS POINT, LIFFORD PO

    CONSTRUCTION OF AN EXTENSION TO THE SIDE OF EXISTING SHED TO CREATE AN OPEN FRONTED STORAGE AREA AND ALL OTHER ASSOCIATED SITE DEVELOPMENT WORKSDecision record indexed
    Decision19 December 2024View record
  20. © OpenStreetMap
    2460402Granted

    15A Streedagh Point, Grange, Co. Sligo

    Works to existing semi detached house to include new single storey extensions to front (east facing) elevation and south gable comprising new living room, entrance porch and bedroom together with internal alterations, landscaping and associated site works including new widened entrance gatesDecision record indexed
    Decision19 December 2024View record
  21. © OpenStreetMap
    GSDZ3710/24Granted

    An Cosan Grangegorman, (formerly the Dublin 7 Educate Together National School), Fitzwilliam Place North, Lower Grangegorman, Dublin 7, D07 PY50

    PROTECTED STRUCTURE & RETENTION: We, the Grangegorman Development Agency and The Dept. of Education, intend to apply for Retention Permission for the following development to a site formerly occupied by the Dublin 7 Educate Together National School, Fitzwilliam Place North, Lower Grangegorman, Dublin 7, D07 PY50, and now to be occupied by An Cosan Grangegorrman Special School (i.e. lands to the south of The Lower House, Grangegorman, a Protected Structure) located within the overall Grangegorman Strategic Development Zone (SDZ), i) The temporary retention and use of the existing detached two-storey School building, for a period of a further 7 years, which was granted temporary permission originally under 4291/08, with the duration subsequently further extended under GSDZ3263/14, GSDZ3653/17 & GSDZ3092/21, ii) retention of internal alterations to the ground floor of the existing building to accommodate six SEN classrooms each with Quiet Spaces and Accessible WC'S, a new Assisted User Shower Room, a new Multi-Sensory Room, a new General Purpose Room, a new Life skills Room, a new Admin Office, new Principal's & Deputy Principal's Offices, a new Staff Room, a new First Aid Room, a new Meeting Room and ancillary Storerooms & WC's etc. (the first floor of the existing building is to remain unaltered leaving the building with a total of fourteen classrooms), iii) retention of a new glazed double-door with side screens in a new larger ope formed to the eastern elevation at ground floor level to the new GP Room, iv) retention of the re-landscaping of existing play spaces to provide new soft play areas with new play equipment, a new Sensory Garden & a relocated hard-landscaped basketball court etc., v) retention of new metal and timber fences and gates within the site to secure the new play spaces and to define new site boundaries with the Grangegorman TUD campus proper so as to cede parts of the site along the northern & western boundaries back to the Grangegorrman Development Agency, vi) retention of a new sliding metal vehicular gate set-back from the existing Fitzwilliam Place North entrance along the redefined western site boundary, (vii) retention of a new car-park area to the south-west of the existing building, to provide 14 no. car-spaces, replacing 16 existing car-spaces ceded back to the GDA along the northern site boundary, bringing the total number of spaces provided to the School to 27, to also include new car park site lighting, EV charging point etc., viii) the retention of two new bike shelter structures each providing parking for 8 no. bikes for a total bicycle parking provision of 16 no.bikes, ix) retention of a new Bin Store area comprising an enclosure of mesh metal fences and gates, x) the retention of four new external ramps, one new set of external steps and new external concrete paths around the reconfigured building to facilitate the new layout, xi) the retention of a new external steel canopy structure with polycarbonate mono-pitched roof outside the main entrance to the building. Sections of the site boundary wall forming the curtilage of the site, including the existing entrance archway from Fitzwilliam Place North and the existing gate piers & wall to Morning Star Avenue, are Protected Structures, (RPS Ref. No. 3289), but no works to these Protected Structures are proposed as part of this application.Decision record indexed
    Decision19 December 2024View record
  22. © OpenStreetMap
    WEB2370/24Refused

    15, Malone Gardens, Bath Avenue, Dublin 4

    The development will consist of: New front vehicular access with a dropped kerb. Installation of an EV charging point. The works also include the removal of the existing railings and pedestrian entrance, and the construction of two new piers and boundary wall.Grounds not yet categorised
    Decision17 December 2024View record
  23. © OpenStreetMap
    D24A/0775/WEBGranted

    Unit 1, Bakers Point, Pottery Road, Dun Laoghaire, Dublin, A96A6P2

    We, Renrew T/A Cara Allcare Pharmacy intend to apply for Retention Permission fDecision record indexed
    Decision17 December 2024View record
  24. © OpenStreetMap
    2460422Granted

    Main Street, Lacka East Ballyduff, Co. Kerry

    We, Liam & Sarah Ann Ross, wish to apply for planning permission for new proposed fuel filling station at site located at Main Street, Lacka East, Ballyduff, Co. Kerry. Proposed works: 1) construction of new fuel filling station consisting of 2 no. dispenser pump islands, dispensing fuel on each side, with canopy over, ancillary to the exiting convenience shop adjacent to the subject site; 2) installation of new underground storage fuel tanks, and all associated fuel pipework, off-fill points and vents; 3) construction of associated car park layout with provision of 1 no. EV charging space; 4) concrete slab surfacing, asphalt surfacing and associated drainage with the provision of new Class A Petrol interceptor; 5) alterations to exiting site entrances, to provide a one way access-egress system to & from the site from public road, including alterations to existing boundary wall, and all associated road safety improvement works; 6) installation of new signage on site, consisting of new totem sign and general signage located on the forecourt canopy; 7) construction of all associated site features including landscaping and boundary treatments, public lighting and all associated site works.Decision record indexed
    Decision16 December 2024View record
  25. © OpenStreetMap
    24247Granted

    Moorefield Retail Park, Moorefield Road, Newbridge

    For a single standalone coffee shop pavilion within the existing car park of Moorefield Retail Park and comprises of an gross floor area of 192sq.m and will operate for the sale and consumption, on and off the premises of food and beverages: The proposal includes an indoor and outdoor seating area, toilets, designed cycle parking, bin store, designated car parking, Totem pole signage, designated cycle drive thru vehicular lane and collection point and parking and height restrictor, boundary landscaping. In addition the proposal will see alterations to the current car parking layout with the removal of 30 no spaces and reconfiguration and proposes a connection to the existing wastewater facilities on siteDecision record indexed
    Decision13 December 2024View record
  26. © OpenStreetMap
    2461736Granted

    KILLULTAN, ST. JOHNS POINT, DUNKINEELY DONEGAL PO

    FRONT PORCH/SUN ROOM EXTENSION TO DWELLING HOUSE AND ALL ASSOCIATED SITE DEVELOPMENT WORKSDecision record indexed
    Decision13 December 2024View record
  27. © OpenStreetMap
    SD23A/0336Granted

    Lands south of Coolamber Drive, Rathcoole, Co. Dublin

    New primary school (Roll No. 20549P), including 20 classrooms, with a gross floor area of 3,449 sq.m over 3 storeys; The proposed development will also provide a no. multi-purpose hall and all ancillary teacher and pupil facilities; Vehicular, cycle, and pedestrian access to the site is proposed to the north-west of the school, with staff and visitor parking spaces; car and bus drop off and set down facilities and associated set down areas and accessible parking facilities; A secondary, future provision of pedestrian, vehicular and cycle access points are provided to the southern boundary of the site; The development will also include the provision of bicycle and scooter parking; external stores; Internal access roads, cycle and footpaths; hard and soft play areas including 2 ballcourts; piped infrastructure, connections and ducting; external plant area; landscaping and boundary treatments; green roofs, PV panels; 1 ESB substation; EV parking facilities; external courtyards and all hard and soft landscaping; ancillary ramps and stairs; lighting; signage; 3 attenuation tank; SUDs; 3 flagpoles; changes in level and all associated site development and excavation works above and below ground.Decision record indexed
    Decision13 December 2024View record
  28. © OpenStreetMap
    SHD3ABP-313591-22Refused

    Lands at Broomhill Road & Unit 51 Broomhill Road, Tallaght, Dublin 24

    (a) the demolition (total area approx. 4,319.9 sqm) of the existing buildings on site and the existing front boundary treatment; and (b) the construction of a new residential and mixed use scheme of 242 apartment units in 5 blocks (Blocks A to E) ranging from 4 to 7 storeys in height as follows: Block A (5 storeys) comprising 40 apartments (4 one bed, 31 two bed and 5 three bed units); Block B and C (7 storeys) comprising 102 apartments (45 one bed and 57 two bed units); Block D (5 - 7 storeys) comprising 36 apartments (16 one bed and 20 two bed units); Block E (4 - 5 storeys) comprising 64 apartments (31 one bed and 33 two bed units); Block D will accommodate a Childcare Facility/creche of approx. 465sqm at ground floor level; The proposal will also provide for a café of approx. 50.9 sqm at the ground floor of Block C. Residential amenity areas will be provided in the form of a reception of approx. 125.1sqm, resident lounge of approx. 45sqm, a letting office of approx. 11.8sqm, a rentable room/studio space of 39sqm, a public gym of approx; 128.5sqm and a public co-working space of approx. 128.4sqm, all at the ground floor level of Blocks B & C; Each residential unit will be afforded with private open space in the form of a balcony or terrace. Communal open space of 1,797.4sqm is proposed in the form of 2 roof top terraces at Blocks D and E, courtyard space at ground level, outdoor seating and planting and pedestrian and cyclist links; Public open space of 1,400sqm is also proposed in the courtyard area, fully accessible to the general public and includes outdoor seating, paved areas, a lawn area, and play areas in addition to an outdoor seating area to the front of the proposed café at Block C; A total of 136 car parking spaces are provided at ground floor level, including 7 Accessible spaces at surface level; and 426 bicycle spaces (Visitor and Resident in bike stands and secure stacked bike spaces) are proposed; The development shall be served via a new vehicular access point from Broomhill Road; Upgrade works are proposed to the vehicular access point to facilitate the proposed development and to provide for improved access and egress for the overall development. New pedestrian and cyclist access points will be provided on to Broomhill Road from the site; The associated site and infrastructural works include provision for water services; foul and surface water drainage and connections; attenuation proposals; permeable paving; all landscaping works; boundary treatment; internal roads and footpaths; waste storage areas and electrical services and all associated site development works; The application contains a statement setting out how the proposal will be consistent with the objectives of the relevant development plan; The application contains a statement indicating why permission should be granted for the proposed development, having regard to a consideration specified in section 37(2)(b) of the Planning and Development Act, 2000, as amended, notwithstanding that the proposed development materially contravenes a relevant development plan or local area plan other than in relation to the zoning of the land.Grounds not yet categorised
    Decision12 December 2024View record
  29. © OpenStreetMap
    2460523Granted

    13/13a IDA Industrial Estate, Athboy Road, Trim Co. Meath

    The development will consist of a 316 Sq.M. industrial unit with 166 Sq.M. internal mezzanine (total floor area 482 Sq.M.), with a building parapet height of 7850mm over finished floor level. Company logo signage on the building (2250 x 1500mm) and free-standing entrance sign (1500 x 1500mm). Site works are to include perimeter boundary fence with vehicular and pedestrian entrance gates with security barrier, internal roadway with connection to existing adjacent unit, hardstand, carparking with EV charge points, sheltered cycle stands, footpaths, ground mounted Photovoltaic array, foul and surface water drainage with connections to public utilities along with all necessary and associated site works. Significant further information/revised plans submitted on this applicationDecision record indexed
    Decision10 December 2024View record
  30. © OpenStreetMap
    4361/24Granted

    57 Pembroke Road, Dublin 4

    PROTECTED STRUCTURE: 10 year permission. The development will consist of: (a) Fabric repair works: (i) Main Roof: Strip slates; salvage re-usable slates; dispose of fibre/asbestos slates. Salvage ridge and hip tiles and reinstate when roof is slated; Provide matching replacement for any missing or damaged beyond repair. Re- slate the roof using salvaged original natural stone slates on the outer slopes as far as possible and new matching natural stone slates on the inner slopes, on breathable membrane using treated battens. Strip all parapet and valley gutters; adjust, repair, and/or replace if necessary valley boarding to suit new copperwork. Lay new copper gutters. Repair, or if necessary replace, existing flashings and cover flashings. Re-form rainwater outlets. Repair roof structural timbers and wall-plates, including cutting and splicing any rotten timbers. Remove existing Velux type roof-lights and replace as indicated on drawings. Remove existing 'dormer type' access to roof, and replace with Velux type roof-light in the plane of the roof. Provide roof insulation; (ii) External walls: Brickwork to front elevation: Repair, or replace if necessary, damaged bricks. Rake out and repoint brickwork with lime mortar - wigged pointing to match original. Brickwork to rear elevation: Carry out minor repairs to brickwork and pointing. Rendered wall finishes: Carry out structural repairs to cracks as detailed on structural engineer's drawings: Hack off loose, damaged or hollow areas of render and re-render to match original; clean and re-decorate. Masonry walls: gently clean to remove surface dirt; complete minor repairs to Granite Ashlar and Chanelled Granite Ashlar walling and pointing. Provide all necessary lead flashings and cover flashings. Concrete frame to modern extension: Carry out repair works as detailed on structural engineer's drawings and make good. (iii) Parapet walls: Carry out all necessary remedial and structural repairs which become apparent after opening-up; Repair metalwork as necessary; redecorate. (iv) Chimney stacks: Carry out all necessary re- building/repair works including repointing wigged finish to match existing. (Extent of re-building to be determined by Conservation Architect after stacks are opened-up). Repair, or replace if necessary, damaged chimney pots to match originals; Repair or replace flashings as necessary. (v) Windows: carry out all necessary repairs to timber frames and sashes if feasible: If not feasible, replace windows on like for like basis by conservation specialist joinery manufacturer. Cills/ surrounds: Repair cracks in granite cills and fill all holes. Repair, or if necessary replace, rendered reveals, and apply new mastic joint with window frames. (vi) Railings/ Security Frames: Check all fixings/supports and repair as required; check for expansion where built into walls and repair as necessary including any cracks in the masonry walls. (vii) Boundaries: Repair front boundary railings and granite plinth as necessary: (viii) Rainwater disposal: Repair, or if necessary replace, rainwater goods; Clean out all gutters, hopper heads, rainwater pipes and leave water-tight and in good working order; re-decorate on completion as required. (b) Provide Electric Vehicle polemounted charge point in front car-parking area.Decision record indexed
    Decision10 December 2024View record
  31. © OpenStreetMap
    2460390Granted

    Bord Na Móna lands within the townlands of, Derries Carrickobreen Bunnahinly Cloonbonny Corralena Kilgarvan Glebe Ballynahownwood and Ballynahown, in County Westmeath

    Development of a recreational shared cycle and walkway located on Bord Na Móna lands within the townlands of Derries, Carrickobreen, Bunnahinly, Cloonbonny, Corralena, Kilgarvan Glebe, Ballynahownwood and Ballynahown in County Westmeath. A section of the narrow-gauge railway track of the railway line in Cloonbonny and Ballynahownwood townlands is a Protected Structure Ref No. 035-009 which runs adjacent to the proposed cycle and walkway. The development proposes the following: The delivery of a shared cycle and walkway on Bord na Móna lands. This will include the repurposing of 3412 meters of existing former rail bed, 3131 meters along existing bog headlands / former high fields, and 473 meters along pre-existing machine access routes. The construction of car and / or bicycle parking facilities at a number of gateway locations along the proposed route and the provision of EV Charging spaces at the Gateway locations. This will include: 1 no. Type 2 Gateway, 2 no. Rest Points. The Type 2 Gateway (WH-02-01) will include the provision of a walker totem, modular pavilion feature, and upgrades to the entrance from the local road. Upgrade works to River Bridge (21-200). Upgrade works to 4 no. local access road crossings, and 3 no. agricultural crossings. The erection of wayfinding and interpretative signage at Gateway locations along the route. The implementation of Sustainable Drainage Systems (SuDS) nature based drainage proposals at the Gateway locations to cater for surface water drainage at car park locations. Fencing and screening will be erected where required for health and safety and biodiversity reasons which will include 4058 meters of ecological screening. All other ancillary and associated site work. The application is accompanied by a Natura Impact Statement (NIS)Decision record indexed
    Decision09 December 2024View record
  32. © OpenStreetMap
    2436Refused

    ATHGARVAN ROAD, NEWBRIDGE, CO. KILDARE

    Development will consist of Building 1: the renovation of the existing red brick building (355sqms) and its change of use from office/administration to day care facility including education, training and work placement. Building 2: the construction of a three-storey building (2,635sqms) with warehouse incorporating a trade counter primarily sale of goods to trade (Unit A-500sqms) and a store/depot/office/car repair and tyre depot at ground floor (Unit B-435sqms) with two stores of offices on the upper floors (1,698sqms). The development also includes the car sales display area and use of an existing building for car sales office (22.4sqms). The use of an area as a " self storage yard" with self storage containers ( total area of 10 containers is circa. 138sqms). A manned car wash and valet area and the conversation of the existing building to staff room (25.2sqms) and a canopied structure for valet services. The proposed development includes the construction of an non-habitable, modular, display home within integrated sales office and a gross floor area of circa 80sqms. Construction of a bin store area; car parking; electric vehicle parking; new internal circulation roads and footpaths for cars and pedestrians; car parking and cycle parking; landscaping works both hard and soft; plaza space and crossing points; and a new boundary wall and railing along the roadside. Access to the development will utilise the newly constructed access road within the site. The development also include signage associated with the ground floor uses in Buildings 1 and 2. All associated works to complete the development including all necessary drainage works.Grounds not yet categorised
    Decision09 December 2024View record
  33. © OpenStreetMap
    2460446Granted

    Rickardstown, Newbridge, Co. Kildare

    For the construction of 17 no. residential dwellings comprising 4 no. 4-bed semi-detached 2 storey dwellings, 2 no. 4-bed semi-detached 3 storey dwellings, 6 no. 4-bed end-terrace 3 storey dwellings, 3 no. 4-bed mid-terrace 3 storey dwellings, 2 no. 2-bed mid-terrace 2 storey dwellings, including the closure of existing vehicular access point to the application site and the creation of new vehicular access off the Roseberry Hill Road, ancillary internal access roads, infrastructure, and all associated site and development works and services. Revised by Significant Further Information which consists of; the number of units has increased, there are revised unit types, and the red line boundary of the revised site layout plan is different to the red line boundary of the initial site layout plan. Further Revised by Significant Further Information which consists of a revised site layout with a revised number of units.Decision record indexed
    Decision06 December 2024View record
  34. © OpenStreetMap
    2360305Granted

    Askea House, Pollerton Rd, Carlow

    The construction of a standalone building to the rear of our existing premises to be used in conjunction with our existing community centre as a counseling/training hub, connection to services, associated parking and all associated site works16 conditions indexed
    Decision05 December 2024View record
  35. © OpenStreetMap
    24/5328Granted

    Courtstown Little Island Co. Cork

    Permission for the following Large Scale Residential Development (LRD) comprising; a) The construction of 172 no. residential units to include 146 no. dwelling houses (with 83 no. dwelling house to include the option for constructing a ground floor extension to the rear) 6 no. duplex units and 20 no. apartments, b) provision of 1 no. creche and 4 no. commercial units to provide for a range of uses which may include Class 1 'Shop', Class 2 'Financial and Professional Services', Class 3 'Other Offices and Class 8 'Medical/Health Services' as may be required by future operators, c) upgrading of the existing vehicular access to the site and the creation of a signalised junction on Ballytrasna Park Road (L-2985-0), including footpaths and cycle lanes and pedestrian/bicycle crossing points, to facilitate access into the site, d) the provision of a new distributor road, including footpaths and cycle lanes, connecting the proposed residential development with Ballytrasna Park Road, e) all associated infrastructure and ancillary development works to include the provision of roads, footpaths and cycle lanes as well as provision of vehicular connections to adjoining lands with pedestrian/cycle facilities; proposed diversion and undergrounding of the existing 10kV overhead electricity line and associated poles traversing the site; landscaping & amenity areas, lighting, drainage and services connections; bicycle and car parking; bin storage; and boundary treatments including fencing and landscape buffer and mixed native hedge planting along the eastern boundary of the site. The application may be inspected online at the following website set up by the applicant: www.vickeryshalllrd.ieDecision record indexed
    Decision04 December 2024View record
  36. © OpenStreetMap
    2460449Granted

    Nenagh North Nenagh South and Tyone, Abbeycourt Hotel Dublin Road, Nenagh

    (1) ground mounted solar PV panels with new fence enclosure and access gates; (2) a container battery storage installation with 6 electric vehicle charge points, and associated site worksDecision record indexed
    Decision04 December 2024View record
  37. © OpenStreetMap
    F24A/0922ERefused

    98 Tayleurs Point, Rush, Co. Dublin, K56X584

    Conversion of existing attic to storage room, to include raising of riGrounds not yet categorised
    Decision04 December 2024View record
  38. © OpenStreetMap
    2360501Granted

    Athy Lodge, Church Road, Athy

    For 1. the refurbishment and conversion by subdivision of the existing ‘Athy Lodge’ main building into 4 no. apartments; 2. the refurbishment and material change of use of existing medical doctors surgery and outbuildings into 5 no self-contained residential units consisting of – a) 2 no. 2-bed townhouses, b) 2 no 1-bed townhouses, c) 1 no studio apartment; 3. the construction of 7 no. new mews style 2-bed houses; 4. the repair and upgrade of the existing vehicular entrance and exit access points to Church Road; 5. the construction of 4 no. 2-bed single storey housing accommodation units which may accommodate elderly / assisted living residents to be accessed from the R417 by way of a new separate vehicular entrance and 6. to carry out all associated site development works and landscaping. ‘Athy Lodge’ is a Protected Structure (NIAH reference number - 11505150, Record of Protected Structures reference number - AY110)Decision record indexed
    Decision03 December 2024View record
  39. © OpenStreetMap
    SD24A/0225Granted

    Circle K Cranley Service Station, Naas Road, Dublin 22, D22 E3X6

    The Proposed Development will consist of a high power electric vehicle charging points and associated infrastructure consisting of the following. 1. installation of 6no. electric vehicle charging bays, 3no. charging units & CT Metering Cabinet, 2. erection of associated signage, 3 Revision to existing pavement area through the removal of desisting automatic car wash & air/water services unit & all associated site development works including drainage infrastructure and line markingDecision record indexed
    Decision03 December 2024View record
  40. © OpenStreetMap
    24/5447Granted

    Ballysally Business Park, Railway Road Ballysallagh Charleville Co.Cork

    Permission for 1) the construction of 1 no. new hardstanding storage area and 24 no. open storage bays for the storage of construction materials and equipment, 2) new vehicular access point (including automatic barrier) from the internal roadway permitted under P.A ref no 22/6257, 3) Minor amendments to the road/footpath layout and car parking from that permitted under PA ref no. 22/6257, 4) amendments to the landscaping from that permitted under PA ref no. 22/6257, including new woodland planting at the north, northeast, west and south of the proposed storage yard, new swale at the east of same, along with new green area at the east of existing building and new boundary planting to the east and south of the permitted warehouse, 5) amendments to surface water network from that permitted under PA ref no. 22/6257, 6) All ancillary development including boundary treatments, public lighting, services and infrastructure, works to the adjacent public road and undergrounding of existing 38kV ESB electrical cables. Permission for Retention is also sought for amendments to the landscaping permitted under PA Ref no. 22/6257 namely a reconfiguration of the permitted kerb/landscaping layout to the south, east and north of the yard permitted under PA ref no. 22/6257, resulting in a minor increase in the hard standing area to the west of the warehouse building.Decision record indexed
    Decision02 December 2024View record
  41. © OpenStreetMap
    2460357Granted

    Lower Rosses, Rosses Point, Co. Sligo

    A single storey extension constructed to the rear of an existing cottage (containing a kitchen / dining Area and utility room); along with connection to existing servicesDecision record indexed
    Decision29 November 2024View record
  42. © OpenStreetMap
    2460132Granted

    Bord Na Móna lands within the townlands of Cloonbony, Kilnacarrow Ballynakill Begnagh Corragarrow, and Cloonmore County Longford

    The development proposes the following: The delivery of a network of walking and cycling trails on Bord Na Móna lands. This will include the repurposing of 5.2km on existing former rail bed, 3.1km along existing bog headlands / former high fields and 185m along pre-existing machine access routes. The construction of car and / or bicycle parking facilities at a number of gateway locations along the proposed route. This will include 1 no. type 02 gateway, 2 no. type 03 gateway, 1 no. type 04 gateway, 3 no. rest points. The provision of 1 no. proposed Type 03 Gateway (LD-03-03) is located at the previously permitted Knappogue Bog Amenity Trail as permitted under Longford County Council Part 8. No. 79. The provision of a Type 02 Gateway (LD-02-01) at Lanesborough which will consist of the development of a pavilion structure, ramp and stairs structure to access the car parking facility. The provision of a pavilion and totem feature at Gateways (LD-03-03 & LD03-06) and the provision of a Thematic Experience comprising a framed structure extending to 8.0 meters with a visitor periscope to view the surrounding landscape, along the northern section of the route within the Cloonmore townland. The provision a Type 04 Gateway (LD-04-04), with the provision of handrails at the existing bridge and the provision of a new fence line along the centre line of the bridge with key holder gated access for maintenance vehicles located in the townland Begnagh. Improvement works to 8 no. existing agricultural crossings. The provision of upgrade works at road crossings (LD-00-02 & LD-00-05). The erection of wayfinding and interpretive signage at Gateway locations and along the route. Fencing and screening will be erected where required for health and safety and biodiversity reasons. This will include; 520 meters of screening along the permitted Knappoge Bog section. 1065 meters of screening along the Begnagh Bog section. The implementation of Nature Based Drainage proposals at the Gateway locations to cater for surface water drainage at car park locations. The demolition and removal of 2 No. existing level crossing gates and associated support structure at proposed road crossing locations at Gateways (LD-03-03 & LD-03-06). All other ancillary and associated site works. The application is accompanied by a NISDecision record indexed
    Decision26 November 2024View record
  43. © OpenStreetMap
    2460594Granted

    Beechgrove Service Station, Hardman’s Gardens, Drogheda Co. Louth

    Permission for the redevelopment of the existing service station at Beechgrove Service Station, Drogheda. The development consists of the demolition/removal of the existing shop, canopy and other above ground structures and infrastructure; the removal or retention on site of all underground fuel storage tanks and ancillary underground infrastructure. The construction of a 24 hour, unmanned, service station. The unmanned service station includes 3 pump islands and 6 fueling bays; a forecourt canopy; off set fill location and enclosure; new underground fuel storage tanks (4x50,000litre fuel storage tanks) and associated underground infrastructure; two self-service car wash bays (manual lance car wash type) and car wash enclosure and associated underground infrastructure; single vehicle, service bay space for air, water and Adblue; and a Control/Storage building. Reuse of the existing access and exit points to create a dedicated one way system. New and/or enhanced boundary treatments; all drainage associated with the development including SUDS measures and petrol interceptors. All works associated with the development. All signage proposed including a single operator totem signDecision record indexed
    Decision25 November 2024View record
  44. © OpenStreetMap
    2460356Granted

    Yeats Country Hotel, Rosses Point, Co. Sligo

    For retention for an entrance lobby at the main entrance of the hotel and for a storage shed at the rear of the hotel, used for the storage of waste bins and for a pump house and electricity generator room, also at the rear of the hotel. Permission for the construction of a new storage shed for the purpose of bottle storage for recycling and general storage at the rear of the hotel and for all associated site development worksDecision record indexed
    Decision22 November 2024View record
  45. © OpenStreetMap
    23914Refused

    Site of 3.82 ha at Mariner's Point, Greenhills Road Ballyguile More, Wicklow Town

    The construction of 56 no. residential units, the provision of 110 no. car parking spaces, all pedestrian and vehicular access roads and footpaths will link to the northern Phase 1 of the overall development, all associated site and infrastructural works. A Natura Impact Statement (NIS) has been prepared in respect of the proposed development and will be submitted to the Planning Authority with this planning applicationGrounds not yet categorised
    Decision22 November 2024View record
  46. © OpenStreetMap
    2460489Granted

    4/5 Raheen Villas, Glenard Avenue, Bray County Wicklow

    Material change of use to divide existing property into three seperate dwellings, one house and two apartments and demolition of existing garage to facilitate parking for three dwellings. The exterior of the existing property will remain unchanged. All access and egress points will remain unchanged. All physical changes will be undertaken internally and have no effect on the existing exterior structureDecision record indexed
    Decision22 November 2024View record
  47. © OpenStreetMap
    2461582Granted

    CARROWKEEL, QUIGLEY'S POINT, LIFFORD PO

    DEMOLITION OF EXISTING DWELLING DUE TO DEFECTIVE MICA BLOCKWORK AND ERECTION OF A REPLACEMENT DWELLING WITH CONNECTION TO EXISTING SERVICES AND ALL ASSOCIATED SITE DEVELOPMENT WORKSDecision record indexed
    Decision21 November 2024View record
  48. © OpenStreetMap
    2460203Granted

    IDA Business & Technology Park, Keenaghan Td. Carrick on Shannon, Co.Leitrim

    Construct an advanced technology building as follows: industrial unit 1,512sqm with 4 no loading bays to rear, 512sqm 2-storey office and reception area to front comprising 269.5sqm at ground level and 242.5 sqm at first floor level (overall floor area 2,027sqm); 56 no. parking spaces and 5 no disabled parking spaces, entrance from existing access point to access road (constructed under previously approved reg ref: 15/110), bicycle stand and electric vehicle charging station, solar panels to roof, provision of grey water system and associated underground water storage tanks, connection of all site services and all ancillary worksDecision record indexed
    Decision21 November 2024View record
  49. © OpenStreetMap
    SD24A/0202WGranted

    Lands to the East (and within the curtilage) of St. Mary’s Priory, Old Greenhills Road, Tallaght

    Alterations to nursing home element previously approved under Reg. Ref. SD22A/0035 comprising: (i) The omission of the permitted nursing home pharmacy unit and internal void spaces to facilitate the inclusion of additional staff and IT facilities; (ii) revision of staff accommodation including additional office space; (iii) provision of Quiet Rooms on all floors; (iv) revisions to lift locations; (v) the provision of an external bin store; (vi) the 4-storey extension to the western and northern wings of the Nursing Home Building to facilitate: (a) additional staircase; (b) laundry rooms; (c) bulk storage room; (d) increase in bedroom quantum from 106 to 120 (including bariatric standard bedrooms with ensuite accommodation on all upper floors); and (e) the relocation of plant room; (vii) the addition of 2 no. EV parking spaces in lieu of 2 no. standard car parking spaces to bring the total number to 5 no. EV points (the total number of car parking spaces remains as permitted at 24 no. spaces); (viii) the increase in bicycle parking provision to 20 no. spaces to serve the nursing home; (ix) amendments to windows/glazing to correspond with internal modifications; (x) all site works and landscaping necessary to facilitate the development. No works are proposed in relation to the approved Independent Living Units.Decision record indexed
    Decision21 November 2024View record
  50. © OpenStreetMap
    2460187Granted

    Collin's Lane (R443) Tullamore, Co. Offaly, The site is generally bounded by greenfield lands to the north; Collins Lane (R443) to the south; Collins Lane Link Road and roundabout to the west; and greenfield lands to the east (recently subject to a

    The construction of a new local neighbourhood centre development of approx. 2,607 sqm (total GFA) in the form of 2 no. new single storey buildings (overall heights 6.2m and 7.5m) comprising: a) Unit No. 1 - A convenience retail supermarket with ancillary off licence (approx. 2,126 sq m GFA/1,430 sqm NFA), entrance lobby, ancillary managerial office spaces, customer WC area, staff welfare facilities (approx. 210 sq m GFA), warehouse facilities including delivery areas (approx. 385 sq m GFA), a switch room (approx. 12 sq m GFA) and a plant room (approx. 14 sq m); b) Unit No. 2 - A café (approx. 240 sq m GFA) with external outdoor seating area, ancillary office and staff welfare facilities and bin store; c) Unit No. 3 - A pharmacy (approx. 110 sq m GFA) including a store area; d) Unit No. 4 - A retail unit (approx. 78 sq m GFA); e) 1 no. new link road (to the north of the development site) via the roundabout to the north west of the site, which will deliver 1 no. new vehicular access point and new pedestrian connections to the site together with new pedestrian connections from Collins Lane (to the south of the site); f) A Deposit Return Scheme Facility (approx. 25 sqm GFA); g) Service and delivery yard area to include a new dock leveller, loading bay, overhead canopy, bin store, generator, a refrigeration plant area and an EV charging point for delivery vehicles. h) Retail Signage (total approx. 74.75 sqm) including 2 no. advertising totem signage structures (33 sq m) and façade retail signage associated with the overall development (approx. 41.75 sq m); i) 135 no. surface car parking spaces which includes 104 no. standard spaces, 8 no. accessible spaces, 7 no. parent and child spaces, 14 no. EV charging spaces and 2 no. click and collect spaces; j) 26 no. bicycle parking spaces including provision for 2 no. cargo bicycle spaces; k) 1 no. trolley bay shelter and 3 no. trolley return shelters; l) An ESB substation (approx. 28 sqm GFA). The site development and infrastructural works provide for water, foul and surface water drainage and all associated connections; all landscaping and public lighting; all boundary treatment works; internal roads and footpaths; PV panels; and all associated site clearance, excavation and development worksDecision record indexed
    Decision20 November 2024View record
Showing 501-550 of 2,129
Page 11 of 20