Erect an extension to existing cubicle shed previously granted under planning ref 17/745 to include underground slatted tanks and all associated site and ancillary worksDecision record indexed
Single storey porch to front of existing dwelling and RETENTION permission of 1. conservatory and games room to rear of dwelling 2. domestic garage as constructed (variations from garage as granted permission under planning permission reference 99/1078) 3. domestic shed as constructed 4. garden shed as constructed3 conditions indexed
Construction of a single storey 2 bedroom dwelling with an office and studio. Roofing of slate and nap plastered outside finish. Front door facing the road screen plating with a cluster of Irish nature trees. A new vehicle entrance off existing lane 16 feet wide, a 14 ft driveway with 4" stone filing to start and 2" 804 to finish. A bored well and septic tank area as proposed in site characteristic form and all associated site worksGrounds not yet categorised
Single storey dwelling, septic tank and percolation area, bored well, a new entrance on existing lane and all associated site worksDecision record indexed
A single storey dwelling, septic tank and percolation area, bored well, a new entrance on existing lane and all assorted site worksGrounds not yet categorised
A single storey dwelling, septic tank and percolation area, bored well, a new entrance on existing lane and all assorted site worksGrounds not yet categorised
1) existing extension to side of original cottage; 2) permission for retention of change of use of traditional store to a home office; 3) permission for retention for change of use of part of an existing farm building to a playroom and all associated site worksDecision record indexed
New four bedroom, part single, part two-storey dwelling house; detached garage; upgraded vehicular entrance on to public road and access driveway; new waste water treatment system and soil polishing filter and all associated landscaping worksDecision record indexed
Proposed detached dormer dwelling & detached garage together with ancillary site development works including screen planting, effluent disposal system to current EPA standards and access driveway & vehicular entrance onto public roadDecision record indexed