The development will consist of:. Construction of 6 no. wind turbines with a blade tip height of 175m, rotor diameter of 150m and a hub height of 100m;. Construction of turbine foundations and crane pad hardstanding areas;. Construction of new site tracks and associated drainage infrastructure;. Upgrading of existing tracks and associated drainage infrastructure where necessary;. Upgrade of entrance onto local road L1322;. All associated drainage and sediment control including the installation of new watercourse or drain crossing and the re-use or upgrading of existing internal watercourse and drain crossings;. Construction of 1 no. permanent onsite 38kV electrical substation to ESBN specifications including: - Control building with welfare facilities; - Electrical infrastructure; - Parking; - Wastewater holding tank; - Rainwater harvesting; - Security fencing; - All associated infrastructure, services and site works.. 1 no temporary construction site compound and associated ancillary infrastructure including parking;. Tree felling to facilitate construction and operation of the proposed development;. Installation of medium voltage (20/33kV) and communication underground cabling between the proposed turbines and the proposed on-site substation and associated ancillary works;. Erection of 1 no. permanent meteorological mast with a height of 100m above ground level and associated access track;. Installation of medium voltage (38kV) underground cabling and associated ancillary works between the proposed on-site substation and the existing Charleville Substation within the townland of Rathnacally. The proposed grid connection will be installed primarily within the public road and will include 2 no. watercourse crossings and the installation of 8 no. pre-cast joint bays;. All associated site development works;. A 10 planning permission and 35 year operational life from the date of commissioning of the entire wind farm. This application for planning permission is accompanied by an Environmental Impact Assessment Report and Natura Impact Statement.Grounds not yet categorised
Permission for retention of the existing dwelling house, domestic garage, water well house, wastewater treatment unit with percolation area and entrance, all as constructed with all associated site and ancillary works.Decision record indexed
Construction of a dwelling house, detached domestic garage, installation of waste water treatment unit and all associated site works.Decision record indexed
Permission for retention of two-storey dwelling and attached single storey domestic garage including toilet, rear open porch and detached boiler house to rear of referred dwelling and domestic garage, entrance and associated works.Decision record indexed
Cherry Hill, Killabraher North North Dromina Charleville Co. Cork
Permission for retention of a dormer style dwelling and wastewater treatment system and permission for an entrance and all associated site works.Decision record indexed
Permission for the retention of the existing dwelling house, domestic storage shed, all as constructed with all associated site and ancillary worksDecision record indexed
Permission to extend and alter an existing dwelling house, to construct a detached garage and to install a wastewater treatment unit with a tertiary polishing filter and all associated site worksDecision record indexed
Permission to construct an extension to an existing dwelling and alterations to existing elevations as well as associated site works.Decision record indexed
Permission to construct slatted shed with effluent tank and all associated site works. Demolition of feeding passage shed is also required.Decision record indexed
The Townlands of Fiddane, Cooliney, Ballynoran, Coolcaum & Ballyroe, Charleville, Co.Cork.
The installation of two 33kV electricity grid interconnectors with a combined total length of 2,217m of underground cable with a joint bay and 1,146m of over head line supported by 8 triple pole sets and 5 double pole sets, a temporary construction compound and 4 transformer stations. The proposed development is to connect the permitted but not built solar farm development at Fiddane (pl.ref 17/05799 & ABP-308846-20) to the consented but not built Ballyroe solar farm (pl/ref. 20/04041), co.Cork and the proposed solar farm development at Coolcaum to the consented but not built Ballyroe solar farm (pl.Ref 20/04041), co.Cork. The cables will be under public road and private lands. The location of the proposed development is in the townlands of Fiddane, Cooliney, Ballynoran, Coolcaum, and Ballyroe near Charleville. A Natura Impact Statement will be submitted to the planning authority with this application.Decision record indexed
Permission to amend the design of the previously approved development (planning reference: Cork County Council 17/5799 & an Bord Pleanála ABP-306915-20)which comprises consent for a 67.8 hectare Solar PV farm at Fiddane, Ballyhea Charleville, Co.Cork. The proposed amendments include; (1) increase in number of transformers, (2) reduction in the spacing of Solar PV rows (strings), (3) increase in size and configuration of solar panels, (4) overall increase in solar power generation, (5) change in solar panels tilt (degree), (6) minor reduction in the height of solar array, (7) operational period proposed to be extended from 30 to 40 years. A Natura Impact Statement will be submitted to the planning authority with this application.Decision record indexed
Residential development comprising the removal of disused farm buildings and the construction of 61 no. dwelling houses and all associated ancillary development works including vehicular access, parking, footpaths, foul and storm water drainage (including the provision of a storm water attenuation tank at Woodview Drive) landscaping and amenity areas - Extension of Duration of Permission granted under Planning Reference: 15/6119 (ABP Ref. PL 04.246853).Decision record indexed
A residential development comprising the construction of 85 number dwelling houses and all associated ancillary development works including vehicular access, parking, footpaths, foul and storm water drainage (including the provision of a surface water attenuation tank), landscaping and amenity areas at Annebella (townland), Mallow, Co.Cork. Extension of Duration to Permission granted under Planning Ref. No. 21/6648, 15/6970, Bord Pleanala Appeal reference no. PL04.247607Grounds not yet categorised
Permission for retention of unauthorised developments consisting of the following: (a) dwelling and entrances as constructed including ancillary works, (b) stables, fowl house and agricultural machinery shed together with vehicular entrance, (c) straw and hay shed, (d) domestic garage and associated site worksDecision record indexed
(1) One artificial all weather sports pitch with associated surround fencing, surround footpath and ball-stop netting, (2) six number 18m high floodlights, (3) car park with 78 number parking spaces, (4) newly surfaced existing vehicular access road, (5) new pedestrian access footpath (6) public lighting for car park, access road and pedestrian footpaths, (7) one number Attenuation Tank and (8) all associated site works.Decision record indexed
Permission for large-scale residential development (LRD), the construction of a residential development of 102 no. residential units comprising of 36 no. dwelling houses and 66 no. apartment/duplex/maisonette units, a two storey creche facility and all ancillary site development works. The proposed 36 no. dwelling houses will all be 3 bedroom mid and end terrace units. The proposed 66 no. apartment/duplex/maisonette units consist of 17 no. 3 bedroom units, 33 no. 2 bedroom units and 16 no. 1 bedroom units. 32 no. of the proposed apartment/duplex/maisonette units will be accommodated in 8 no. 2 storey buildings in southern and central areas of the site, with the remaining 34 no. apartment/duplex/maisonette units being accommodated in a 1-3 storey apartment building to the north of the site. The proposed development facilitates pedestrian and cycle connections to the existing Woodview Drive residential development to the east and the residential development to the west permitted by An Bord Pleanála reference 312640-22, which is currently under construction. Access to the proposed development will be provided via the internal road network of the Annabella Park residential development. The proposed development provides for upgrades to the existing internal road network and public realm of the Annabella Park residential development including new footpaths, public lighting and traffic calming measures. Other ancillary site development works include landscape and amenity areas, public open spaces, servicing and drainage proposals (including SuDs measures), bicycling parking, bin storage facilities and an ESB substation. A Natura Impact Statement (NIS) has been prepared and will be submitted to the Planning Authority with the application. LRD Website: www.AnnabellaLRD.ieDecision record indexed
Construction of 35 no. dwelling units and all associated ancillary development works including access, parking, drainage, landscaping and amenity areas. The proposed dwelling houses will replace 20 no. residential units previously permitted under Cork County Council Ref. 15/6119 (An Bord Pleanála Ref. PL0.246853)(extended under Council Ref. 20/6130).Decision record indexed
Permission for the conversion of former agricultural outhouse to 2 bed dwelling with physical therapy treatment room, construction of treatment unit and soil polishing filter and all associated site works.Grounds not yet categorised
Retention of (i) conversion of attic of existing dwelling to storage area including roof lights and gable window and (ii) elevational alterations to existing dwellingDecision record indexed
Retention of the extension to the side of existing dwelling and for retention of the conversion of the garage for habitable use within the dwelling and for retention of the bay window in front elevation of existing dwelling.Decision record indexed
Permission to alter existing dwelling house, to include alterations to elevations of existing dwelling house, new dormer windows and an enclosed front porch, extension to the existing detached garage, provision of renewable energy type roof panels to the detached garage roof, modifications to the existing vehicular entrance, construction of a front boundary masonry blockwork wall to replace existing front boundary fence line and permission for retention of the location of the existing bored water well.Decision record indexed
Permission to construct a new roofed collecting yard adjacent to existing milking parlour. Proposed new roofed collecting yard to incorporate new underground slatted soiled water tank with external agitation & crush & ancillary external concrete. The above to be carried out with all associated ancillary site works.Decision record indexed
The construction of a residential development comprising 88 residential units (2 no. 1-bed; 71 no. 3-bed; and 15 no. 4-bed), comprising 54 no. houses (28 no. semi-detached; and 26 no. townhouse units), 32 no. duplex, and 2 no. apartment. The proposed development will also consist of a creché, new vehicular and pedestrian access from Kennel Hill Road, car parking, shared open spaces, landscaping, a pumping station and all associated ancillary development and site works necessary to facilitate the development.Grounds not yet categorised
No. 8 St Theresa's Place Greenane Kanturk Co. Cork
(1) The demolition of a rear extension of existing dwelling, (2) the demolition of the shed to the rear, (3) construction of a new two storey extension to the rear and the construction of a new single storey extension to the front of the two storey dwelling, (4) a new rooflight to the rear of the existing dwelling and (5) all associated site works.Decision record indexed
The construction of a crèche facility to serve the adjacent permitted residential development (Planning Ref: 15/6119) and all associated ancillary development works including vehicular access, parking footpaths, drainage, landscaping and amenity areas - Extension of Duration to Permission granted under Planning Ref. No. 16/6023Decision record indexed
Permission for the construction of a creche facility to serve the adjacent permitted residential development (Cork County Council Ref. 15/6119 (extended under Ref. No. 20/6130) and all associated ancillary site development works including vehicular access, parking, footpaths, landscaping and amenity areas at Annabella (townland), Mallow, Co. Cork. The proposed creche will replace the creche previously permitted under Cork County Council Ref. 16/6023 (extended under ref. 22/6434).Decision record indexed
To demolish existing dwelling house and adjoining outhouses, and construction of replacement dwelling house with adjoining storage shed and all associated site works.Decision record indexed
Permission to demolish existing dwelling house and adjoining outhouses, and construction of replacement dwelling house with adjoining storage shed and all associated site works as previously permitted under planning ref no. 21/4222, except that the location of the dwelling house and storage shed have been amended within the site.Decision record indexed
Permission for the retention of the existing single storey front porch extension to the front elevation, existing greenhouse extension to the side elevation and existing single storey extension and two storey extension to the rear of the existing two storey dwelling house with all associated site and ancillary works.Decision record indexed
Permission for Retention of the extensions to the front, rear and side of the existing dwelling, (2) Permission for the decommissioning of the existing septic tanks, (3) permission for the installation of a secondary treatment system and soil polishing filter and all associated site works.Decision record indexed
N20 Road Kilknockan and Lackanalooha (Townlands) Mallow Co. Cork
The construction of a modern service station comprising a one storey forecourt building, a forecourt with canopy, 6 pump islands, 3 underground fuel tanks; electric vehicle charging stations; parking for vehicles, coaches and HGV’s; and signage. A new access road is proposed onto the L-92004-0 road and improvement works are proposed to the existing entrance onto the N20 Road, including provision of a right-hand turning lane on the N20 Road. The forecourt building includes: (1) retail shop; (2) delicatessen; (3) restaurant with drive through facilities and drive through lane; (4) internal seating and dining area; (5) sale of hot and cold food for consumption both on and off the premises from the delicatessen; (6) ancillary space for staff, office and storage; (7) toilet facilities; (8) service yard with bin storage; and (9) external seating area. The proposal will also comprise of all associated ancillary site development works including pedestrian access, internal roads and round-about, parking, footpaths, crossings, landscaping and boundary treatments, and drainage. A Natura Impact Statement will be submitted to the Planning Authority with the application.Grounds not yet categorised
To construct a dwelling (change of plan from that granted under reference 10/4472 and extended under 15/6144) and for construction of a detached domestic garage, installation of a treatment unit and polishing filter as per reference 10/4472, extended under 15/6144 and to carry out all associated site works. This application is accompanied by a Natura Impact Statement (NIS).Decision record indexed