Of alterations to private garage
The development consists of the RETENTION of mobile home for habitable purposes, entrance from road and associated site works
Of two sheds as constructed within the curtilage of the subject property
For the construction of an extension & a garage along with all associated works
To construct a new dwelling house, private garage, a new private road connecting to an existing entrance and connection to public utility services along with all associated works
For the following development at Glebe House Building: to (a) provide new disabled access ramp and steps to replace existing ramp and (b) to provide 18 number PV Panels on existing roof as per associated drawings, all within existing site boundaries
To extend the existing dwelling house, including part demolition with all necessary ancillary services
Of remedial works carried out to date on the protected structure ( RPS No 881, a disused estate cottage ) with a view to making it a habitable structure at Wilson Road, Kilrush, Co Clare. The remedial works to include reconstructing the floors, replacing the roof and providing 3 No roof lights all as constructed, the demolition and re-construction of a single storey extension to mirror the structure annexed to the north side. Planning PERMISSION is sought to retain and repair the roofs of the outhouses located at the rear of the dwelling
For renovation works and two storey extension to existing dwelling, demolition of existing sheds, new wastewater treatment system and polishing filter, all associated site works and services
To construct gable extension to existing dwelling plus all ancillary site works
To demolish existing sub-standard dwelling and construct new replacement dwelling, using existing sewer connections, including all ancillary site works and utilising existing site entrance area
To construct 2 dwelling houses, each with entrance from public road, connection to public services and associated site works
To carry out alterations and refurbishment of an existing dwelling house along with all associated works
Of as-constructed ground floor bay window and PERMISSION for alterations to first floor windows on front elevation
To demolish existing shed at rear of house and construct new single storey extension to rear of dwelling
Of the following development: (a) alterations to the existing dwelling house; (b) conversion of shed to use as part of house, including connection to the house; (c) construction of new shed to rear; (d) all associated site works and services
To construct new garage, including all ancillary site works
To construct bay window to the front of existing dwellinghouse plus all ancillary site works
For the construction of a Dwellinghouse, new entrance and connection to public services including ancillary site works
To construct new bay window and porch to front elevation
For development which will consist of the construction of a new internal access road with drain crossing, formalisation of staff car parking areas and minor alterations to Doughmore House, O’Dea Barn and Healy House and the external areas of each property including fencing and alterations to entrance at O’Dea Barn. The change of use of Doughmore House from Office/Administration use to Leisure/Recreation Use, the change of use of O’Dea Barn from Agricultural use to Operational/Storage Use, the change of use of Healy House from residential to Office/Administration and the Shed at Healy House to Operational/Storage use. The development includes the construction of a new boiler room, pickle ball courts, basketball court, and two soft play areas at Doughmore House and minor alterations. The provision of new windows, doors, screen fencing and minor alterations to O’Dea Barn. The construction and erection of a covered walkway and front porch, minor alterations to the existing storage building, converting an existing door to a window and minor alterations at Healy House and all associated works
To carry out the following development: Restoration and additions to existing Walled Garden and Gardener's Yard. The proposed development will include: a) The construction of a new wall and entrance gates to the existing Gardener's Yard. b) The installation of a prefabricated storage container in the existing Gardner's Yard. c) The demolition and rebuilding of the existing greenhouse in the Walled Garden. d) All ancillary site works. In accordance with the Habitats Directive, Appropriate Assessment Screening has been carried out on this project. An Environmental Impact Assessment (EIA) screening determnation has been made and concludes that there is no real liklihood of significant effects on the environment arising from the proposed development and and EIA is not required. This development proposes works adjacent to the exterior of a protected structure, RPSs No: 876 NIAH No: 20301212K27 which would materially affect the character of a protected structure. The development is also within the demesne of Kilrush House/ Vandeleur Estate RPS No: 873 NIAH No: 20301212 as noted in the Clare County Development Plan 2023-2029 Volume 4
To retain and complete restoration and alterations to the existing stable block to support tourism development to include: new double door ope and double doors in existing stone wall with new external steps to access new ESB meter room and to carry out all associated and ancillary site works to facilitate the proposed development at the above address. The stable block is a protected structure RPS No.: 876 NIAH No.: 20301212K27 and is within the demesne of Kilrush House/ Vandeleur Estate RPS No.: 873 NIAH No.: 20301212 as noted in the Clare County Development Plan 2023-2029 Volume 4
To carry out the following development: Restoration and alterations within the existing stable block courtyard to support tourism development including: 1) A café, 2) Indoor and outdoor dining area 3) Kitchen, 4) Office 5) Signage 6) Welfare facilities, 7) associated ancillary services. The stable block is a protected structure RPS No.: 876 NIAH no.: 20301212 and is within the demesne of Kilrush House/ Vandeleur Estate RPS No.: 873 NIAH No.: 20301212 as noted in the Clare County Development Plan 2017-2023 (as varied) Volume 4. In accordance with the Habitats Directive, Appropriate Assessment Screening has been carried out on the project. An Environmental Impact Assessment (EIA) screening determination has been made and concludes that there is no real likelihood of significant effects on the environment arising from the proposed development
To construct dwelling house, entrance, recessed front boundary, foul sewer treatment system and percolation area plus all ancillary site works
To construct sunroom to rear of existing dwelling plus all ancillary site works
To construct agricultural machinery/ storage shed plus all ancillary site works
Of existing extension and alterations to P07/173
To construct new dwelling, utilising existing site entrance and using existing sewer connections, including all ancillary site works
Of the change of design of a dwelling house and garage previously granted under C/603 granted by Kilrush Urban District council, along with all associated works
For the Construction of a single storey extension to existing dwelling to include front porch, Living area, Dining area, T.V Room, Play room and for internal and elevational changes to existing dwelling. Also PERMISSION is sought for the demolition of existing conservatory to side of dwelling and demolition of detached garage, including ancillary site works
To RETAIN extension to the existing dwelling house along with all associated site works
To construct a new dwelling house and garage complete with a new entrance, sewage treatment system and ancillary works
To construct a dwelling house, garage, access road linking to an existing private entrance onto the public road, new sewerage treatment system and percolation area along with all other necessary ancillary works
To construct new dual sided, sports-wall training area
For development of this site at Trump International Golf Links & Hotel, Doonbeg, Kilrush, Co. Clare, V15 KH39. The development will consist of: a) The construction of new golf tee boxes serving Holes 3 and 17, including associated turfing, edging, contouring and grading works to integrate the golf tee boxes into the existing golf course layout and design; b) The demolition and removal of a section of the existing internal access road, and the realignment and construction of a new and upgraded internal access road, including all associated works and services; c) Landscaping and remodelling of adjoining improved grassland areas, including minor contouring, low earth mounding to improve visual screening, integration of the new golf tee boxes and associated walkways, the formation of a pond and associated wetland areas, and the expansion and enhancement of the existing improved grassland; and, d) All associated site development works, including earthworks, temporary fencing, reseeding, landscaping, ground reinstatement and any ancillary works required to facilitate the development. A Natura Impact Statement (NIS) has been prepared for this development and is submitted with this planning application
To extend and renovate the existing dwelling house including upgrading the sewage treatment system and changing the location of the site entrance and to include restoring the existing outbuilding to its original form, a protected structure listed in Clare County Development Plan 2023-2029 Volume 4 Record of Protected Structures RPS No. 301 with all necessary ancillary services
For development, the development is located in the townlands of Ballykett, Tullybrack East and Tullybrack, Kilrush, Co Clare. The Development will consist of the erection of 4 no. wind turbines with an overall ground to blade tip height of 150m with a rotor diameter of 136m and a hub height of 82m. The development will also consist of the construction of crane hardstand areas and turbine foundations, new site entrance onto the L6132, construction of one no. temporary construction compound with associated temporary site offices, parking areas and security fencing, installation of one no. permanent meteorological mast of 82m overall height, construction of new internal site access tracks and upgrade of existing site track, to include all associated drainage including new clear span bridge crossing of the Moyasta River, development of a site drainage network, biodiversity enhancement measures, construction of one no. permanent electrical substation, ancillary forestry felling to facilitate construction of the Development, all associated underground electrical and communications cabling connecting the wind turbines to the wind farm substation and to the existing Tullabrack 110kV Substation. This application is seeking a ten year permission and a 35 year operational life from the date of commissioning of the wind farm. The Planning Application is accompanied by an Environmental Impact Assessment (EIAR) and a Natura Impact Assessment (NIS)
For development of agricultural machinery shed
For the erection of 4 no. wind turbines with an overall ground to blade tip height of 150m with a rotor diameter of 136m and a hub height of 82m, the construction of crane hardstand areas and turbine foundations, the creation of a new site entrance onto the L6132, construction of 1 no. temporary construction compound with associated temporary site offices, parking areas and security fencing, installation of 1 no. permanent meteorological mast of 82m overall height, construction of new internal site access tracks and upgrade of existing site track, to include all associated drainage including new clear span bridge crossing of the Moyasta River, development of a site drainage network, biodiversity enhancement measures, construction of 1 no. permanent 38kV electrical substation, 2 no. permanent spoil storage areas, all associated underground electrical and communications cabling connecting the wind turbines to the wind farm substation and to the existing Tullabrack 110kV Substation, all ancillary forestry felling to facilitate construction including the development of one no. borrow pit, vertical realignment of an existing crest curve on the L6132. This application is seeking a ten year permission and a 35 year operational life from the date of commissioning of the wind farm. The planning application is accompanied by an Environmental Impact Assessment (EIAR) and a Natura Impact Statement (NIS)
The development will consist of demolition of front and rear porch and modifications to existing house; construction of extension to dwelling house incorporating existing outbuilding; associated modifications and re-roofing of outbuilding and garage, all associated site works; use of existing connections to wastewater treatment system and services, and existing entrance from public road
To change the design of the extension previously authorised under planning permission P20/702 with all necessary ancillary services
Of A) domestic garage as constructed to rear of existing dwelling B) access road and entrance with gravel hardstanding area to side and rear of existing dwelling plus all ancillary site works
To RETAIN existing rear extension as constructed and PERMISSION to construct new extension also to rear of existing dwelling with a private garage, decommission existing septic tank system and upgrade to a proprietary wastewater treatment plant with percolation area and associated ancillary siteworks
For alterations to the proposed dwelling house as granted under application P23/60278 to include a childcare facility on the ground floor along with ancillary works
For the construction of a new dwelling house and attached garage complete with a new entrance, sewage treatment system and ancillary works
Of the following a) extension to side of dwelling house, b) velux rooflights to dwelling house and c) detached private garage to side of dwelling house along with associated site works
To construct dwelling house, garage, entrance, waste water treatment system and percolation area plus all ancillary site works
To construct a new dwelling house, new entrance, private garage and install a new wastewater treatment system along with all associated works
To construct a new dwelling house, new entrance, private garage and install a new wastewater treatment system along with all associated works