For dwelling house, wastewater treatment system, percolation bed and associated services. Gross floor space of proposed works: 214 sqmDecision record indexed
Permission for demolition of existing extension and construction of a proposed 1.5 storey extension to existing cottage, waste water treatment system, boundary treatment, landscaping and all associated site works atDecision record indexed
For dwelling house, wastewater treatment system, percolation bed and associated services. Gross floor space of proposed works: 212 sqmDecision record indexed
Permission to construct domestic dwelling house along with domestic garage, new Treatment system and percolation area and all ancillary site development works atDecision record indexed
For 1) a new car parking layout and associated public lighting. 2) a new disabled access external toilet and equipment store. Gross floor space of proposed works: 20.7sqm.Decision record indexed
To demolish the existing Parish Hall and Hand Ball Alley and to construct a new Community Centre, (Ground Floor dedicated to Community Centre and First Floor dedicated to Office Space). Landscaped Car Parking Area along with all associated site works. Development and Demolition works will be carried out adjacent to the boundary of a protected Structure, St Cuan's Catholic Church (RPS No.: 93). Gross floor area of proposed works: 732 sqm(community), 411.00 sqm(demolition)Decision record indexed
35.5 HA SITE KNOWN AS 'WEST OFFALY POWER (WOP) STATION' LOCATED AT SHANNONBRIDGE IN THE TOWNLAND OF CLONIFFEEN, EIRCODE N37 C840 CO. OFFALY
THE DEMOLITION OF THE EXISTING WOP STATION (AS APPROVED UNDER OFFALY COUNTY COUNCIL REF. 01/187 / AN BORD PLEANÁLA REF. PL 19.125575 AND ALL SUBSEQUENT PERMISSIONS); AND THE DEVELOPMENT AND OPERATION OF ELECTRICITY GRID SERVICES — NAMELY A BATTERY ENERGY STORAGE SYSTEM (BESS) AND A SYNCHRONOUS CONDENSER (SYNC CON). THE PROPOSED DEVELOPMENT COMPRISES TWO DISTINCT PHASES OF ACTIVITY. PHASE 1 COMPRISES THE DEMOLITION OF EXISTING SITE STRUCTURES (WITH A TOTAL FOOTPRINT OF C. 1 3, 124 SQ.M. AND A TOTAL GROSS FLOOR AREA OFC. 28,000 SQ.M.) INCLUDING THE FORMER WOP STATION, THE INTERMEDIATE PEAT STORAGE BUILDING AND ASSOCIATED FUEL MANAGEMENT SYSTEM; AND ANCILLARY BUILDINGS INCLUDING: ELECTRICAL TIPPLER AND ASSOCIATED CONTROL ROOM AND OFFICE, SCREENING, LORRY UNLOADING, WATER TREATMENT PLANT, OFFICES, LABORATORY, WORKSHOP AND MAINTENANCE BUILDINGS, OIL PUMPHOUSE, ELECTRICS ROOMS, RAILWAY / LOCOMOTIVE SERVICE BUILDING, COOLING WATER PUMP HOUSE AND SEWAGE / FOUL WATER TREATMENT FACILITY. ALL BUILDINGS AND STRUCTURES WILL BE DEMOLISHED TO GROUND LEVEL, AND THE SITE WILL BE REINSTATED AND SECURED WITH BOUNDARY GATES AND FENCES, ETC. ASSOCIATED WITH THE DEMOLITION ACTIVITY THERE WILL BE ON-SITE CRUSHING OF MATERIAL USING MOBILE MACHINERY, FOR THE PURPOSES OF DISPOSAL AND / OR MATERIAL RE-USE. PHASE 2 COMPRISES THE PROPOSED DEVELOPMENT OF THE BESS, SYNC CON; AND ALL ASSOCIATED DEVELOPMENT. THE BESS WILL COMPRISE A 75 MW CAPACITY BATTERY STORAGE FACILITY LOCATED WITHIN FENCED AND GATED COMPOUND AND WILL INCLUDE UP TO 22 NO. BATTERY STORAGE UNITS INCORPORATING A CONCRETE BASE, BATTERY MODULES, ASSOCIATED PLANT AND EQUIPMENT INCLUDING TRANSFORMERS AND INVERTERS A 240 SQ.M. SINGLE-STOREY CONTROL BUILDING; THE SYNC CON WILL COMPRISE A 400 MVA SYNCHRONOUS CONDENSER LOCATED WITHIN A C. 0.7 HA COMPOUND AND WILL INCLUDE A SYNC CON BUILDING (C. 962 SQ.M., C. 14 M HIGH). INCLUDING A MAINTENANCE LAYDOWN AREA; AND A CHAINLINK OR PALISADE FENCE AND ACCESS GATE LINKING WITH THE EXISTING STATION ROADS. BOTH DEVELOPMENTS WILL BE SERVED BY GRID CONNECTIONS, BOUNDARY FENCES AND GATES, AND LANDSCAPING. EXISTING ACCESS ROADS WILL CONTINUE TO BE USED TO SERVE THE NEW DEVELOPMENT AND WILL NOT BE ALTERED. SITE SERVICES —AND A 20 KV RURAL SUPPLY CIRCUIT BREAKER BUILDING (C. 18 SQ.M.), WILL CONTINUE TO BE USED TO SERVE THE NEW DEVELOPMENT. PLANNING PERMISSION IS SOUGHT FOR A DURATION OF 10 YEARS. (FULL DETAILED DESCRIPTION IN ATTACHED APPENDIX A)Decision record indexed
Permission for development consisting of (i) the construction of a two storey flat roof extension to the rear of the existing dwelling with a single storey link to same (ii) the removal of a balcony over rear flat roof extension and at side elevation (iii) block up door way on first floor and alter doorway to provide window on ground floor which are both on the east elevation (iv) some minor internal renovations of existing dwelling (v) decommissioning of existing septic tank (vi) installation of a new effluent treatment unit and percolation area and (vii) all associated site works atDecision record indexed
Permission for erection of dwelling house with sewerage treatment plant and percolation area, and all ancillary development work atDecision record indexed
Permission for development consisting of the installation of a 36m lattice support structure carrying telecommunications equipment including antennas, dishes, together with associated equipment cabin, cabinet, fencing, access gate and all associated site development works (the development will provide for high speed wireless data and broadband services) atDecision record indexed
Former West Offaly Power (WOP) Station, in the townland of Cloniffeen Shannonbridge, Co. Offaly
The proposed development of area 7.34 ha, will consist of a battery energy storage system (BESS) located within a fenced compound and will (subject to detailed design, commercial and technical considerations) comprise of: Demolition of 4 no. prefabricated structures (c. 876 sq.m total); Up to 768 no. battery energy storage enclosures, organised in approx. 36 no. bays. Each battery enclosure will incorporate battery packs as well as power electronics, battery management systems, cooling units and fire suppression systems. The battery bays will be 5m wide x 3m high and vary in length from 23.8m to 33.7m; 11 no. Medium Voltage (MV) Skids (c. 6m x 10.2m x 2.5m); Control Building (c. 285.3 sq.m); Ancillary plant and equipment comprising of: an emergency diesel generator plinth (c. 28.7 sq.m); two spare parts containers (c. 29.7 sq.m); a fire fighting water tank and pump house (c. c. 62 sq.m); an underground oil separator and collection pit; customer transformer compound including a bunded main step-up transformer (c. 141 sq.m) and firewalls, and High Voltage (HV) switchgear, linking with an underground cable; and auxiliary transformers (c. 4m x 4m x 3m); Operation and Maintenance site office including welfare facilities (c. 27.9 sq.m); All services connections including electrical, water and wastewater and connections to existing surface water drains; 2 no. lightning monopoles (c. 18m high); A c. 135m long, c. 5m tall concrete retaining wall to the east of the site; and All other ancillary site clearance and development works including provision of biodiversity landscaping; areas of hardstanding; internal access roads; lighting; laydown area; fencing and access gates (c. 4m in height); car parking; and connections to site services networks. Planning permission is being sought for a duration of 10-years. WOP Station is licenced by the Environmental Protection Agency under an industrial emissions (IE) licence [Ref. P0611-02]. A Natura Impact Statement (NIS) is submitted with the planning application.Decision record indexed
Ardkeenan National School, Ardkeenan, Drum Athlone
Permission for development consisting of the decommissioning of existing septic tank and percolation area serving existing school buildings and replacement with a new wastewater treatment system and tertiary polishing filter and all ancillary site works atDecision record indexed
To construct a 27 metre high multi-user lattice tower telecommunications structure, carrying antenna and dishes enclosed within a 2.4 metre high palisade fence compound with associated ground equipment and associated site works including new access track atDecision record indexed
A C. 14.1 HA SITE LOCATED WITHIN THE SITE OF THE FORMER WEST OFFALY POWER (WOP) STATION, IN THE TOWNLAND OF CLONIFFEEN SHANNONBRIDGE CO. OFFALY, N37 C840
THE CONSTRUCTION & OPERATION OF A 250 MVA (ELECTRICAL RATING) SYNCHRONOUS CONDENSER LOCATED WITHIN A C. 0.8 HA FENCED & GATED COMPOUND & WILL INCLUDE: (A) A SYNC CON BUILDING (C. 962 SQ.M., C. 14 M HIGH) TO HOUSE EQUIPMENT INCLUDING THE GENERATOR, FLYWHEEL, LUBE OIL SKID, AIR COMPRESSOR & PUMPS; (B) ANCILLARY DEVELOPMENT LOCATED WITHIN THE OUTDOOR COMPOUND INCLUDING: COOLING EQUIPMENT (C. 190 SQ.M., C. 3 M HIGH); MODULAR CONTAINERS TO HOUSE ELECTRICAL & CONTROL EQUIPMENT (C. 270 SQ.M., C. 7 M HIGH); A BUNDED TRANSFORMER (C. 150 SQ.M., C. 8 M HIGH) & TWO AUXILIARY TRANSFORMERS (C. 23 SQ.M., 4 M HIGH); A MAINTENANCE CABIN (C. 78 SQ.M.) & ASSOCIATED MAINTENANCE LAYDOWN AREA; TWO SPARE PARTS STORAGE CONTAINERS (2 NO. CONTAINERS, C. 72 SQ.M. EACH); ELECTRICAL EQUIPMENT; FIREFIGHTING WATER TANK (C. 7 M DIA., C. 8 M HIGH) & PUMPS; & AN UNDER-GROUND OIL SEPARATOR & COLLECTION PIT (C. 69 SQ.M); (C) EXTERNAL LIGHTING POLES (C. 6.3 M HIGH), 2 NO. LIGHTNING MONOPOLES (C. 18M HIGH) & POLE MOUNTED CCTV (C. 8.3M HIGH); (D) CONNECTIONS TO EXISTING SITE SERVICES INCLUDING A NEW UNDERGROUND (220KV CABLE) GRID CONNECTION TO THE EXISTING 220KV SHANNONBRIDGE SUBSTATION, CONNECTIONS TO WATER WASTEWATER & SURFACE WATER SYSTEMS, ELECTRICAL CONNECTIONS BETWEEN ITEMS OF EQUIPMENT, & A 20KV RURAL SUPPLY; & (E) ALL OTHER ANCILLARY & MISCELLANEOUS SITE WORKS INCLUDING: TEMPORARY WORKS (E.G. WORKS COMPOUNDS, ACCESSWAYS & SITE SERVICES), SITE CLEARANCE, SITE ACCESS, INTERNAL ROADS & DEVELOPMENT OF AREAS OF HARD ST&ING & CAR PARKING, & A C. 2.6 M HIGH CHAINLINK OR PALISADE FENCE & ACCESS GATE LINKING WITH THE EXISTING ON-SITE STATION ROADS. FOR CLARITY, PRE-EXISTING ACCESS ROADS WILL CONTINUE TO BE USED TO SERVE THE NEW DEVELOPMENT & WILL NOT BE ALTERED. PERMISSION IS SOUGHT FOR THE CONTINUED USE OF THESE ELEMENTS. THE PROPOSED DEVELOPMENT WILL NOT ALTER OR AFFECT EXISTING ESBN NETWORK GRID INFRASTRUCTURE ON THE SITE (INCL SUBSTATIONS, OVERHEAD LINES & ASSOCIATED SUPPORT STRUCTURES) OR THE THIRD PARTY OWNED TELECOMMUNICATIONS MAST. PLANNING PERMISSION IS BEING SOUGHT FOR A DURATION OF 10 YEARS. NOTE FOR INFORMATION PURPOSES: THIS APPLICATION RELATES TO ELEMENTS PREVIOUSLY CONSENTED BY OFFALY COUNTY COUNCIL UNDER REG. REF 22/223. WOP STATION IS LICENCED BY THE ENVIRONMENTAL PROTECTION AGENCY UNDER AN INDUSTRIAL EMISSIONS (IE) LICENCE [REF. P0611-02]. THE APPLICATION INCLUDES A NATURA IMPACT STATEMENT (NIS)Decision record indexed
To construct a new extension to our existing home, along with internal and external alterations to the existing dwelling house, and all associated works. Gross floor space of proposed works: 100 sqmDecision record indexed
Ballydonagh Cloonineen Skecoor Kiltormer East and Lisheenaguil, Co. Galway
For several minor amendments to the previously consented development under Planning Reference 2461749 (by Galway County Council). The amendments comprise the following; Combined central inverters and MV transformers are replaced by separate string inverters and central MV transformers which results in a reduction in the extent of associated hardstanding areas; alteration to Condition 3(a) to extend the operational lifetime of the solar farm from 35 years to 40 years; addition of tables in the former central inverter locations. An updated Natura Impact Statement has been submitted with this application. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall applyDecision record indexed
Ballydonagh Cloonineen Skecoor Lisheenaguil Kiltormer East, County Galway, Ireland
To construct and complete a Solar PV Energy development with a total site area of circa 56.2 hectares across four sections of land to include, solar PV panels ground mounted on metal support structures, electrical transformer and inverter substation modules, temporary construction compounds, internal access tracks (existing, upgrading and new), site accesses, watercourse crossing infrastructure, security fencing, electrical cabling and ducting, interconnection cabling, CCTV and other ancillary infrastructure, drainage, additional landscaping and habitat enhancement as required and associated site development works. The solar farm would be operational for 35 years. A Natura Impact Statement will be submitted with this applicationDecision record indexed
An extension and alterations/full renovations to an existing derelict dwelling house consisting of the following; removal of the existing chimneys, replacement of the existing roof, removal of the existing front porch and the construction of a new front porch, removal of the existing windows/doors and replacement of same within revised openings, removal of the south and west walls of the existing dwelling and replacement of same with new openings, construction of a rear/south extension containing Kitchen/Dining Area, Bedroom, Shower Room and Ensuite. Permission is also being sought for a new domestic garage/storage shed, new treatment system and percolation area, new site entrance and all associated site worksDecision record indexed
Of a dwelling, septic tank and percolation area and site entrance on revised site boundaries from previously approved under plan ref. no. 51539; retention of a domestic garage with a connecting link to the existing dwelling; retention of an agricultural shed and all associated site worksDecision record indexed
Permission for development consisting of construction of dwelling house and effluent treatment system along with associated site works atDecision record indexed
For the construction of the following, 1) provision of a below ground wet well chamber (approx. 18m3) emergency storage chamber with screen (approx. 37m3 storage volume) and valve chamber (approx. 6m3) to replace the existing below ground inlet screening chamber wet well and dry well which will be decommissioned all within the existing pumping station compound, 2) replacement of the existing below ground gravity sewer from the existing below ground combined sewer overflow (CSO) chamber on Chapel Street to the existing below ground manhole within the yard of the public house with a 225mm diameter gravity sewer 3) Construction of a new below ground gravity sewer, 225mm dimeter from the existing below ground manhole within the yard of public house to the new pumping station wet well; 4) Decommissioning of the existing below ground gravity sewer, 150mm diameter from the existing below ground manhole with in the yard of the public house to the existing pumping station inlet screening chamber, 5) Decommissioning of the existing below ground CSO chamber and replacement with a new below ground manhole to facilitate the transfer of wastewater flows from the Ahascragh network to the new pumping station wet well, 6) the decommissioning of the existing CSO pipe from the existing CSO chamber to the Mill Stream; 7) the construction of an emergency overflow pipe from the proposed emergency storage chamber within the existing pumping station compound to the Mill Stream and 8) associated below ground pipework connections from the existing pumping station inlet tank to the proposed wet well rising main connection from proposed valve chamber to existing rising main which leads to the Ahascragh Wastewater Treatment Plant. A Natura Impact Statement has been prepared to accompany this planning application. Gross floor space of proposed works; 33sqm, Gross floor space of work to be retained; 13sqmDecision record indexed
Ahascragh West, Main Street Ballinasloe, Ballinasloe
For A) change of use of existing ground floor unit from retail use to takeaway use, including food prep area and storage area. B) Erection of new proposed signage to the front elevation of the buildingDecision record indexed
For a change of use for the building formerly known as "Brookside Footwear" to a shop and café associated with the Whiskey Distillery recently granted planning permission in Ahascragh. There will be offices at first floor level in the existing building and a single storey extension is to be constructed at the side to accommodate an 'outdoor' seating area with a roof covering and all associated site works. Gross floor space of proposed works: 87 sqnDecision record indexed
Ahascragh West, Main Street & Church Avenue, Ahascragh Co. Galway
Of 1. single storey extension (22sq.m) to the north of the existing shop building; 2. Permission for demolition works (12sq.m) to the existing shop building; 3. Permission for construction of single storey extension (27sqm) to the north of existing shop building; 4. Permission for construction of single storey extension (12sqm) to the south of existing shop building; 5. Permission for reconfiguration of the internal layout of the existing shop building to provide retail area (81 sq.m), off licence area (19sq.m), deli area (28sq.m), seating area (12sq.m) with alterations to ancillary area (23sq.m) with change of use of full retail area to retail use with ancillary off licence use. 6. All associated ancillary site and drainage worksDecision record indexed
For the construction of a new detached bonded warehouse storage unit, revised car park layout to include additional car parking spaces, and all associated site works. Gross floor space of proposed works 1012 sqm.Decision record indexed
(a) construction of a new dwelling, (b) construction of a domestic garage / store (c) wastewater treatment system with percolation area (d) new site entrance and (e)all associated site works. Gross floor space of proposed works house & garage 359.71 sqm.Decision record indexed
For (a) the retention of a previously granted dwelling (Pl. Ref: 05/3360) in a revised location on site with revised site boundaries, (b) retention of an existing domestic storage shed, (c) permission for the construction of front porch & rear bedroom extensions and (d) all associated external works.Decision record indexed
Permission to construct an extension to the existing school consisting of: 1. Therapy room and associated WC facilities; 2. Alterations to school entrance to include automatic entrance door and creation of canopy; 3. Alterations to site entrance and formation of wheelchair accessible / assisted car parking spaces & associated site works atDecision record indexed
For a new Whiskey Distillery at Ahascragh Mill, Main Street, Ahascragh, Co. Galway, 177691, 238557 consisting of alterations to repair and restore the building fabric of the existing Buildings, install process equipment for the production of whiskey, administration space and function space ancillary to the distillery use. Visitor facilities will be incorporated to accommodate tours of the Distillery which will include a museum/interpretative area displaying articles and plant associated with the former use of the building as well as a Tasting Room. The old Mill Wheel will be restored. A Natura impact statement (NIS) will be submitted to the local authority with the Planning Application. Ahascragh Mill is a protected structure and can be reviewed on the record of protected structures list under RPS no 92. Gross floor space of the proposed works: 1757 sqm. Gross floor space of work to be retained: 1216 sqm. Gross floor space of any demolition: 177 sqmDecision record indexed
To construct a storage shed for straw and feed stuffs to include concrete apron and all associated works. Gross floor space of proposed works: Shed: 922.32 sqm, Apron: 253.00 sqmDecision record indexed
To retain and complete (a) an extended site boundary and (b) the relocation of a site entrance, at the site at an existing dwelling house previously granted planning permission, Ref PD/16/41 atDecision record indexed
To construct a fully serviced private dwelling house with waste water treatment system and private garage/fuel shed to include all associated site works. Gross floor space of proposed works: House: 140.98 sqm, Garage/fuel shed: 53.94 sqm.Decision record indexed
Permission for the construction of extensions & alterations to existing dwelling house, proposed domestic garage/store, demolition of existing sheds/walls, septic tank upgrade to proposed proprietary treatment system, percolation area and associated works atGrounds not yet categorised
Permission to demolish existing dwelling house and domestic sheds, to construct new replacement house and domestic garage, to install upgraded treatment system and percolation area and all ancillary site development works atDecision record indexed
For the new residential housing development which includes: 1. The demolition of 2 no. existing sub-standard houses along Main Street. 2. Permission for the construction of 11 new dwelling house residential development comprising of; a. 1 no. 1 storey detached 4-bedroom unit. b. 2 no. 2 storey semi-detached 2-bedroom units. c. 2 no. 2 storey, 2-bedroom terraced units. d. 6 no. 2 storey, 3-bedroom terraced units. e. All ancillary site works, services, utilities, water connection, roads, footpaths, parking, shared surfaces, street lighting, hard and soft landscaping, to service the development. f. The provision of landscaped open spaces to include a play area. g. The connection of the development to the public sewer and for all ancillary services/plant associated with same. h. Proposed access to the residential development. Gross floor space of proposed works: 1,109.55 sqm. Gross floor space of any demolition: 102.48 sqmDecision record indexed
To construct a fully serviced private dwelling house with waste water treatment system and private garage/ store to include all associated site works. Gross floor space of proposed works: 206.59 sqm (house) & 53.94 sqm (garage/fuel shed)Decision record indexed
To construct a loose housing shed to include concrete aprons and all associated site works. Gross floor space of proposed works: loose shed 261.48 sqm & Concrete aprons 296.80 sqmDecision record indexed
Of a house on revised site boundaries from those originally granted in 1983, to demolish an old extension (20sqm), to construct a new extension (45.6sqm) and to relocate and upgrade an existing septic tank, incorporating a new proprietary sewage treatment unit and percolation area along with all associated site works. Gross floor space of proposed works: 45.60 sqm. Gross floor space of any demolition: 22.50 sqmDecision record indexed
Alterations to the development of an Energy Storage Facility designed to provide system support services to the Electricity Grid at Cloniffeen, Shannonbridge, Co. Offaly in lieu of that granted under planning permission No. PL2/21/295. The proposed alterations consist of: (i) changes to the type of battery containers and medium voltage power stations (MVPS) unit and a reduction in the number of units from 169no. to 88no., (ii) six new battery storage control modules (combined floor area 163m²), (iii) reorientation and decrease in floor area of the synchronous condenser building from 531m² to 503m², (iv) reorientation and inclusion of three additional synchronous condenser control modules (floor area increases from 148m² to 216m²), (v) reposition of grid transformer, auxiliary transformers, generator circuit breaker, and external air cooling units, (vi) decrease in floor area of the IPP building from 354m² to 147m², (vii) decrease to battery storage compound area from 19,295m² to 11,135m², (viii) increase to the synchronous condenser compound area from 4,060m² to 4,890m², (ix) associated minor changes to internal roads, surface and foul drainage, civil engineering, landscaping, lighting, car parking, and site worksDecision record indexed
DEVELOPMENT OF AN ENERGY STORAGE SYSTEM (ESS) FACILITY DESIGNED TO PROVIDE SYSTEM SUPPORT SERVICES TO THE ELECTRICITY GRID. THE DEVELOPMENT WILL COMPRISE: (I) AN OPEN AREA BATTERY ENERGY STORAGE SYSTEM (BESS) COMPOUND (AREA OF 19,295SQM) CONTAINING 169 NO. BATTERY AND MEDIUM VOLTAGE POWER STATION (MVPS) ENCLOSURES (13.720M LONG X 2.55M WIDE X 3.902M HIGH), (II) IPP BUILDING (40M LONG X 10M WIDE X 6.853M HIGH), (III) SYNCHRONOUS CONDENSER COMPOUND (AREA OF 4,060SQM) CONTAINING SYNCHRONOUS CONDENSER BUILDING (30.0M LONG X 18.0M WIDE X 12.15M HIGH), 5NO. CONTROL MODULES EACH (12.192M LONG 2.438M WIDE X 3.332M HIGH), ASSOCIATED BUNDED TRANSFORMERS AND ELECTRICAL PLANT, (IV) ELECTRICAL SUBSTATION (AREA OF 2,805SQM) CONTAINING EIRGRID BUILDING (14.509M LONG X 12.509M WIDE X 6.926M HIGH), AND ELECTRICAL PLANT AND BUNDED MAIN TRANSFORMER WHICH WILL ELECTRICALLY CONNECT THE PROPOSED ESS FACILITY, VIA UNDERGROUND CABLE (UGC), TO THE GRID AND TRANSFORMER BAY WITHIN THE EXISTING SHANNONBRIDGE 220KV SUBSTATION LOCATED ON LANDS APPROXIMATELY 230M WEST OF THE PROPOSED ESS FACILITY, AND (V) ALL ANCILLARY DEVELOPMENT, INCLUDING; LIGHTING MAST PROTECTION, PERIMETER FENCING WITH ACCESS GATE AT PRIMARY VEHICLE SITE ENTRANCE WHICH WILL CONNECT TO A LOCAL PUBLIC ROAD PROVIDING ACCESS TO THE R357, LANDSCAPING, LIGHTING, CAR PARKING, INTERNAL ACCESS ROADS AND ALL CIVIL ENGINEERING WORKS FOR THE DISPOSAL OF FOUL AND SURFACE WATERDecision record indexed
Of agricultural buildings and farm related structures within the existing farm complex, extensions to the rear and front of existing dwelling house and all associated site services. Gross floor space of work to be retained: 1,221.69 sqmDecision record indexed