1. New single storey toilet block and store rooms extension to rear of existing public house. 2. Conversion of existing stone building to side of public house to lounge/ bar use with alterations to elevations. 3. New vehicular access road to existing car park to rear of public house with additional car parking spaces and cycle parking. 4. New septic tank and percolation area to replace existing system. 5. New photovoltaic panels to front of public house. Retention permission sought for the following: 1. Existing entrance lobbies and ramp to front of existing bar and lounge to public house. 2. Existing smoking area with glazed canopy over to front of public house. 3. Existing signage to front of existing public house. 4. Existing vehicular entrance with splayed wall and piers to front to replace previous vehicular entrance. 5. All above with associated siteworks
Detached single storey timber clad kennels along side a detached single storey timber clad utility/washroom all to side of site, retention for 2 no. detached cabins consisting of kennel cabin and office cabin to rear of site, retention for 1 metal storage shed, retention for canopy area and permission for removal of mobile home to side of site and all with associated ancillary works
Renovations, single storey extensions to front, side and rear of existing bungalow; conversion of attic space with dormer windows, new sewage treatment system, and associated ancillary site works
A proposed replacement waste water treatment system to EPA standards in lieu of existing septic tank and associated works
Bedroom at dormer level and associated works
Change of use of existing farm outbuilding within the curtilage of a protected structure and conversion to a new single family dwelling and connection to existing septic tank of main house
To install a proposed effluent disposal tank in my existing farmyard with all associated site works
As constructed domestic garage located on site
The demolition of the 16sqm rear extension (total area of existing house is 64sqm), construction of a single storey render clad extension (approx. 111sqm) to the rear of the retained portion of the existing house, changes to selected window opes, external wall finishes and roof of the existing house, a bored well, a new site specific treatment unit and percolation area replacing an existing septic tank and soak pit and all associated site works
Change of use (removal of planning condition no. 3 of planning ref. no. 04/113) from restricted use as a dwelling to use by all classes of persons
(1) excavation works to rear of existing commercial property and construction of concrete wall and (2) placement of a container on lands along with all associated site development works
(1) excavation works to rear of existing commercial property and construction of concrete wall and (2) placement of a container on lands along with all associated site development works
(1) excavation works to rear of existing commercial property and construction of concrete wall and (2) placement of a container on lands along with all associated site development works
New dwelling, garage, new entrance and section of laneway on to existing lane, wastewater treatment unit, soil polishing filter, new well and associate works
Single storey extension to the south (side) of existing dwelling; ancillary siteworks and services
Renovate and reinstate existing abandoned residential dwelling to include reinstatement of roof structure. Permission is sought to make alterations and to erect an extension to existing abandoned dwelling. Permission is sought to install wastewater treatment facilities to current EPA standard and sink a new bored well water supply and and all associated site and ancillary works
Two-storey extension and the refurbishment of the Grooms Lodge, part of a stable complex within the curtilage of a protected structure - Ballykean House, to facilitate accommodation for visiting students and tourists, incorporating small lecture room and residence for in-house event manager, including new access road from existing farmyard gate, new treatment plant and associated site works
Permission to upgrade the Existing Effluent Disposal System and a new bored well
As constructed garage and location of effluent treatment unit
Construction of a dormer style dwelling with garage, new entrance off existing lane, well, effluent treatment system to current EPA standards and all associated site works
Dwelling, garage, well effluent treatment system, new entrance and associated works
As constructed dwelling, revised boundaries and permission to upgrade existing percolation area to current EPA standards and removal of condition number 2 from 03/9511 from restricted use to use by all classes of person
As follows: 1. Retention planning permission for an existing mobile home, site entrance and all associated works and 2. Planning permission for a new mobile home (to replace the existing mobile home), effluent treatment system and polishing filter, use existing entrance and all associated site works
1. A timber hut (13.11sqm) to the west of the site. Permission is sought to connect to the existing septic tank and percolation area. 2. A yurt (19sqm) with an eco-compost toilet to the north of the site along with all associated site works. Retention permission is sought for: 1. An existing single-storey log cabin (35.5sqm) located south of the site (behind the existing cottage gardens). Currently not use. 2. An existing camping pod (28.9sqm) located to the west of the site (currently not in use). Permission is sought to connect to the existing septic tank and percolation area. 3> Retention permission is also sought for the existing septic tank and percolation area(which services the existing log cabin) located to the north of the log cabin, an all associated site works
1. change existing door on front elevation to a window 2. change of door style and removal of window side elevation 3. new window to side elevation 4. construction of an extension to the rear 5. construction of a garage 6. upgrading effluent disposal system to comply with current EPA regulations and associated works
The development consists of retention permission for existing small-scale eco-tourism development “Happy Place Stays” which includes an existing single storey log cabin (35.5sqm) and existing camping pod (28.9sq.m) (both as constructed). Retention permission for existing septic tank and percolation area and permission for connection of camping pod to same and all ancillary site works. The use of this accommodation shall be reserved for short term stays only and connected to the horticultural and farming activities established on site.
Change of use of domestic garage to additional Playshcool room with services and all associated site works
Erect extension to rear and side of our dwellinghouse, to carry out alterations to same, to revise existing entrance from the public road, to provide a new waste water treatment system on site and to carry out all associated ancillary works.
Of extension to existing residence
New dwelling, new garage, new entrance onto public road, wastewater treatment unit and soil polishing filter, new well and associated works
Domestic garage with loft storage space, tool shed, fuel store and associated works
Bungalow, detached domestic garage, effluent treatment system in accordance with EPA 2009, and associated site works
Change of use from the current residential use to short term lettings at Foal Lodge, Ballykean Estate, Redcross, Co. Wicklow
Construction of new dwelling, domestic garage, wastewater treatment unit and polishing filter, new well, upgrading of existing entrance onto public road and associate works
Erect a 24m high lattice telecommunications support structure together with antennas, dishes and associated telecommunications equipment all enclosed in security fencing
Single storey 39.825 sqm living are extension to side of existing bungalow, RETENTION for 78.28 sqm large plus, plus 2 no 24.6 sqm and 4.05 sqm smaller sheds, attached to front of large shed (total 106.93 sqm). All sheds are used for domestic storage / workshop use only, the large shed also accommodates stabling comprising of 2 no pony stalls. PERMISSION to install a new raised percolation area, comprising of a coco pod to EN12566 standards, and 80 sqm attenuation layer in accordance with EPA 2009 Regulations at existing dwelling
Proposed change of use (the removal of condition 2(a) of planning register reference 01/5292) from restricted use as a dwelling to use by all classes of persons
Replace existing unauthorised log cabin with Family Farm house, garage and waste water effluent treatment unit to current EPA standards, bored well and pump house and all associated site works.
Short term retention of unauthorised log cabin to allow for family farmhouse, garage and waste water effluent treatment unit to current EPA standards, bored well and pump house and all associated site works. To be completed. Granted under PP 21/346
Of hardstanding, wash bay, new entrance and galvanised shed as constructed on site and their continued use for agricultural purposes and bus parking on-site, all together with associated site works
The collection, treatment and disposal of effluent as a result of bus washing, all together with associated site works
Single storey extension at ground floor to the side of an existing stone cottage to provide for an additional 2 bedrooms and permission for works to upgrade existing septic tank system
Alteration and extension of an existing stone cottage to provide a new open plan dining/kitchen area, relocated master bedroom, new extension providing new living area, and new extension providing an additional en suite bedroom. Demolition of existing conservatory. Alterations to existing hard landscaping to rear. All associated landscaping, drainage, ancillary site works and services
(i) a new entrance (ii) existing entrance to be closed and made obsolete (iii) the importation of material to in-fill and re-contour the subject site, and all associated site development works. Once the importation is complete, the applicant will seed the land in line with Teagasc guidelines and return it to agricultural use. The Operational Phase will see the site being used as agricultural pastureland. The applicant proposes, subject to planning, to import clean greenfield soil and stone to remediate approximately 3.72ha. of the total site. The 3.72ha is divided into 4 distinct phases - Phase 1 is 1.82ha, Phase 2 is 0.58ha, Phase 3 is 0.66ha and Phase 4 is 0.66ha. A fill plan has been drawn up for the importation of 41,552tonnes to fill Phase 1, 25,243 tonnes to fill Phase 2, 28,596 tonnes to fill Phase 3, and 28,596tonnes to fill Phase 4, equating to a total of 123,987tonnes of soil and stone. Permission is being sought for a 5-year period and will be subject to a waste facility permit
Proposed erection of a fully serviced dwelling house and domestic garage, new on-site wastewater treatment system and private well to EPA standards, proposed new entrance onto existing lane, together with associated and auxiliary site works
(1) Two storey extension to rear of existing house. (2) New porch & rooflight to front elevation. (3) New high-level windows at first floor level to south elevation of existing house. (4) Alterations to existing window openings to front & rear elevations. (5) New septic tank & percolation area in new location
Dwelling, garage, waste water treatment system to EPA standards, new entrance and associated site works
Agricultural entrance and all associated site works
233 sqm single storey dwelling, 48 sqm single storey garage, vehicular entrance via existing agricultural entrance, bored well, effluent disposal system to current EPA standards, all associated ancillary site development works
1. extension and amendments to existing house including rear extension, side extension, replacement roof and amendments to all elevation; 2. construction of a new on-site treatment system; 3. construction of a new replacement vehicular entrance to achieve 65 meter sight lines; 4. construction of a new domestic garage/shed; together with all ancillary site works