For development which will consist of the construction of a dwelling house, garage, a proprietary waste water treatment system and ancillary site works
To construct a single dwelling house, garage, advanced wastewater treatment system along with ancillary site works
For change of house design (reduce floor area) from that approved under planning ref 22/198. Minor alterations to site layout to reflect above and connect to Waste water treatment system already approved by planning ref 22/198 and all associated site works
The construction of a dwelling house, garage, new entrance, waste water treatment system and all associated site works
To block up existing combined agricultural / residential entrance and replace with a relocated combined agricultural / residential entrance along with all ancillary site works
To construct a dwelling house, garage, new entrance, waste water treatment system and all associated site works
The development will consist of construction of one new single storey dwelling house with wastewater treatment system, bored well, garage, entrance from public road and all associated works
The proposed development, on an overall site of 3.58 hectares, will consist of: A co-located Battery Energy Storage System (BESS) Compound with associated internal access tracks; Access to the proposed BESS compound will be from the R466 local road and will consist of the use of an existing quarry entrance in the townland of Leitrim which will be upgraded as permitted as part of the Fahy Beg Wind Farm (under Clare County Council Ref: 23148 & ACP Ref 317227); Installation of grid code compliance equipment to facilitate an under-the-fence connection to the adjacent Fahy Beg 38kV substation. The grid code compliance equipment will include: Backup Generator, Neutral Earthing Resistor (NER), Auxiliary House Transformer, Marshalling Kiosks; 3 no. spare parts shipping containers (measuring 12.2 m (L) x 2.4 m (W) x 2.6 m (H)); and Associated ancillary development. Installation of 32 no. Battery Energy Storage Units comprising metal shipping containers housing batteries (measuring 6 m (L) x 2.4 m (W) and 2.9 m (H) each), and associated ancillary control and ventilation units; Installation of 8 no. Medium Voltage (MV) Inverter Stations comprising metal shipping containers housing the inverter, MV transformer, and an MV-LV room (measuring 6 m (L) x 2.4 m (W) and 2.9 m (H) each); Installation of 1 no. water storage tank (measuring 5.15 m (L) x 4.15 m(W) x 2.58 m (H)); Construction of 250m of new access tracks; Provision of a crane hardstanding area to facilitate lifting operations on site (280m2); Provision of 10 no. car parking spaces (8 no. standard parking spaces, and 2 no. accessible parking spaces); Reprofiling of the existing cut slope embankment with the erection of a gabion basket retaining wall measuring 75m in length and 2.5m in height, and construction of a reinforced fill slope embankment; Underground electrical and communications cabling; Security lighting, CCTV and communications mast; Provision of 150m of Sound reflective barriers; Security fencing and gates; Drainage system including on-site surface water attenuation ponds; Tree felling of 0.19 Ha (1,890m2) to facilitate required clearance for BESS compound, associated earthworks and drainage infrastructure; Removal of 109m of hedgerow to facilitate development of the BESS compound, and replanting of 109m at perimeter locations; and All associated ancillary site development and vegetation clearance works including landscaping and hedgerow reinstatement. The Applicant requests that the development be
To erect a dwelling house and garage and entrance and install a septic tank and percolation area and all associated site works
To construct a two bay double slatted shed with creep area
To RETAIN a garage granted under P05/319, that was rotated 90 degrees, a rear extension to the same garage, an open storage shed and including all ancillary site works
Of extension erected to the side of their house and also detached garage and all associated site works
For to erect an extension to the side of house and all associated site works
To erect a dwelling house, garage, entrance and install an effluent treatment system and percolation area and all associated site works.
For development which will consist of the restoration of part of an extant sand and gravel quarry to agricultural grassland. The development is necessary to address condition no. 8 & 9 of ABP Ref. 03.QD.0011 and will include importation of inert material and all associated site development works. A Natura Impact Statement (NIS) has been submitted with the planning application
The development will consist of alterations to existing dwelling to include changes to elevations and dormer windows extension to the rear and all ancillary works
For a vehicular entrance, dwelling house, domestic waste water treatment system with polishing filter together with all associated site works
For revised site layout and revised house design to that previously granted permission ref. P23/60265.
To erect a dwelling house, garage, entrance, driveway, install an effluent system and all associated site works
To construct a dwelling house, waste water treatment system with percolation area and associated site works
The development will consist of: The addition of PV solar panel array (circa. 30 sq metres in area) on the south western roof plane of the existing single storey garage structure to the rear of the site
For development, the development consists of the construction of a slatted unit and associated site works
To remove ground works of dwelling granted under permission P06-2345, but not completed and to construct a dwelling house including attached car-port, detached garage, with effluent treatment system, new entrance form public road, and all associated site works
For the following development to the existing dwelling house: (a) to RETAIN an existing rear extension (47 sq.M) to the rear of the dwelling house to include revised internal layout and (b) PERMISSION to construct a single storey extension (27sq.M) to the side of the main dwelling house along with associated ancillary site works
To construct a dwelling and garage with effluent treatment system, new entrance from public road, and all associated site works
To construct a dwelling house, detached garage, sewage treatment system, together with all associated site works
Of the following (a) the existing standalone garage, (b) retain the extension to the rear (south) of the house along with the conversion of the integrated garage to accommodation, (c) the existing dormer structure to the house main roof along with the conversion of the attic over the integrated garage, (d) the porch structure on the western side of the house, (e) elevation treatment and fenestration changes and (f) position of septic tank and bored well
For development which will consist of the construction of a dwelling house, a proprietary waste water treatment system and ancillary site works
The development will consist of the construction of a part single storey and part one and a half storey dwelling house, domestic garage, wastewater treatment system and percolation area, the widening and upgrading of the existing access lane from the public road to the site, landscaping and all associated site development works and services
For a single dwelling house, garage, advanced wastewater treatment system along with ancillary site works
For a single dwelling house, garage, advanced wastewater treatment system along with ancillary site works
For the construction of a single storey dwelling house, detached boiler house, septic tank system and all ancillary site works
For development which will consist of the construction of a dwelling house, a proprietary waste water treatment system and ancillary site works
Is sought to construct a 2 storey dwelling house, detached domestic garage, vehicular entrance, effluent treatment system and bored well including all associated site works and services.
For the following works 1. Completion of already substantially complete house as previously granted under P03-2504 and all ancillary works. 2. Construct a new extension to the existing house. 3. Construct a new garage. 4 Bore a new well for the supply of water to the existing house. 5. Alter and construct the site entrance as previously granted under P03-2504
To retain a constructed cubicle house, Permission for development which will consist of the construction of an unroofed slatted feed area for the constructed cubicle house, new walled silo & associated site works
To RETAIN constructed milking parlour and dairy and PERMISSION to construct collecting area, shed with cubicles, calving pens, slatted tank, new silage slab with retaining walls and associated site works
Of a) private garage / store to rear of dwellinghouse, b) site boundaries/ site layout as constructed and c) modifications to windows and doors including additional Velux roof windows to rear of dwellinghouse along with all associated site works and services. Original planning reference Nos. P04-1519 and P05-145
To construct cubicles shed with slatted tank and all associated site works
For the provision of a roofed structure for dry effluent storage (dugstead) and all associated site works
For demolition of the former dwelling house on site and its replacement with the construction of new dwelling house and garage, upgrading existing entrance, waste water treatment system and all associated site works
For dwelling house, garage, a new potable well, on site wastewater treatment/percolation, and associated services
For the construction of a multi use games area (MUGA), associated side fencing and netting, artificial grass surface, floodlighting and all associated ancillary and incidental works
To construct a dwelling house and garage, with effluent treatment system, new entrance from public road, and all associated site works
To construct a dwelling house and garage, with effluent treatment system, new entrance form public road and all associated site works
To Extend the Appropriate Period of Planning for P19/670 to construct a dwelling house, garage and waste water treatment system including all ancillary site services and works
To (a) RETAIN the garage and dwellinghouse foundation as altered (granted under Planning Permission P19/670) & (b) complete the construction of the garage and dwellinghouse
To change the design of the spectator stand previously approved under Planning Ref. P17/880 and all associated site works
To replace the existing open hurling wall with a new relocated indoor / covered hurling wall and pitch to cater for the winter training needs of youth and adult Tulla GAA Club members, to replace existing toilets, upgrade existing wastewater treatment system and all associated site works
Of (a) additional floor areas to existing dwelling house, (b) elevational alterations, (c)domestic garage, (d)2nd vehicular entrance.