For the bulk excavation dig and alteration of levels, to reduce ground locally to that compatible with adjacent lands, together with all associated site development works all to the rear of Suir GaragesGrounds not yet categorised
For the construction of 1no building, 7.25m overall height, for use as an agricultural vehicle testing facility, incorporating associated offices and mounted signage to the front elevation of the unit, together with all associated site development works,Grounds not yet categorised
Sought for indefinite retention of 3 No. 7m high signage flagpoles PLANNING PERMISSION for erection of 1 No. 1.6m wide x 3.2m high freestanding road side illuminated advertisement sign, plus associated site works. Also for the erection of 2 No. 1.61m High x 0.8m wide building mounted Mercedes and Setra signs, plus a building mounted 3m wide x 0.81m high Omniplus Sign.Grounds not yet categorised
To build a detached two floored dormer type dwellinghouse. Together with all associated services, including foul drainage disposal in the installation of a proprietary waste water treatment system and a water connection from the public mains on the adjoining public road and also all associated development work, including a new entrance to the site from the adjoining public roadDecision record indexed
For sub-division of the site and Outline Planning Permission for a dwelling with waste water treatment system and all associated site worksDecision record indexed
Permission consequent on grant of outline planning permission 22/497 for a dwelling and garage with wastewater treatment system and all associated worksDecision record indexed
For the construction of two single storey extensions to both sides of our existing dwelling together with connection to on site services and all associated site works atDecision record indexed
Construction of a new single/two storey detached dwelling house, new detached garage, waste water treatment system and all associated site worksDecision record indexed
Construction of a new single/two storey detached dwelling house, new detached garage, waste water treatment system and all associated site worksGrounds not yet categorised
Gorteens and Drumdowney Upper, Slieverue, Co Kilkenny
For an access road, bridge and associated works including landscaping. The proposed access road and bridge will extend the existing road network and will provide access to lands zoned Port Facilities and Industry. A Natura Impact Statement will accompany this application.Grounds not yet categorised
To provide a new single storey extension to the side and rear of the existing dwelling, proposed changes to the internal layout of the existing dwelling to provide a new layout, elevational alterations to the existing dwelling, new detached garage building, new wastewater treatment system, proposed alterations to the existing drive within the site, and all associated site development worksDecision record indexed
Belview Port Gorteens, & Drumdowney Upper, Co. Kilkenny
For the extension of the existing access road that provides access to lands located at Belview Port, Gorteens & Drumdowney Upper, Co. Kilkenny. The proposed development works will consist of the extension of the existing access service road, construct a new clear span bridge structure, ancillary service connections, landscaping and associated site works. A Natura Impact Statement (NIS) will accompany this applicationDecision record indexed
Alterations and extension, conversion of existing garage to habitable accommodation, new entrance porch and all associated site worksDecision record indexed
Alterations comprising a new roof with an increased ridge height, attic conversion with 4 no. velux rooflights, elevational modifications and all associated site worksDecision record indexed
Construction of a single storey front porch and single storey extension to side of existing dwelling, alterations to the existing front & side elevations and all associated site development worksDecision record indexed
For the handling and temporary storage of zinc and lead ore at an existing bulk store, and loading of the ore from the store onto ships from an existing Wharf. It is expected that the proposed development will facilitate the export of up to 210,000 tonnes of ore per annum. The works will include modifications to the existing bulk store and the addition of dust extraction from the bulk store building. The proposed development will also involve the use of telescopic material handling equipment on the existing wharf at Belview to facilitate loading of the zinc and lead ore onto Ships, along with associated site works. A Natura Impact Statement will accompany this application.Decision record indexed
The raising of existing front boundary walls with finish as existing to a finished capped height of 2.4m from front public footpath and all associated site worksGrounds not yet categorised
For (1) (a) Permission for the proposed erection of a Fertiliser Storage unit together with all associated site works, landscaping and ancillary services on site including (b) the removal of the existing septic tank on site, and the proposed installation of a new treatment system on site to cater for foul water from site (c) the removal of the existing attenuation tank on site and the proposed installation of a new attenuation tank on site together with installation of a Bypass Separator with Flume monitoring equipment on the discharge from the surface water drainage on site, and for (2) Permission for Retention of a water storage tank for fire fighting purposes, pump house, storage shed and external storage area for sawdust. An Appropriate Assessment Screening Report forms part of the Planning ApplicationDecision record indexed
For development at this site address. The development will consist of an ESB medium voltage (MV) Unit Substation and adjoining Customer Switchroom (an external footprint of up to 31m2, gross floor space of up to 19.5m2 and up to 3m in height) and all other associated site development works, including drainage and underground electrical cabling and ducting, required to facilitate the development. The substation development will be contained entirely within the boundary of the existing Belview Port and will use existing access arrangements within the port facility. The application is accompanied by a Natura Impact Statement (NIS)Decision record indexed
For a dormer style two storey extension to the side of the existing dwelling with associated alterations to the existing dwelling including demolition works, the relocation of the front entrance door together with all ancillary site works.Decision record indexed
For a Maintenance Building, roof mounted solar panels and associate site works at Belivew Port, the building is to provide storage for port vehicles, workshops for the maintenance and storage of port machinery and equipment, ancillary office accommodation and welfare facilities atDecision record indexed
For a laydown area for equipment and break bulk materials. The works will include earthworks, drainage, concrete paving, retaining walls and landscaping works. A Natura Impact Statement will accompany this applicationDecision record indexed
Unit 1 Belview Port, in the townland of Gorteens, Co Kilkenny
For development, at Unit 1, Belview Port, Gorteens, Co. Kilkenny. The development will consist of the amendment of condition no. 3 Pl. Ref. 11/397 to include for the acceptance, unloading and storage of non-hazardous waste including construction and demolition waste, end of life tyres and other non-hazardous bulk wastes for onward export. The application is accompanied by an Environmental Impact Assessment Report (EIAR) and Natura Impact Statement (NIS)Decision record indexed
Unit 2 Belview Port, in the townland of Gorteens, Co Kilkenny
For development, at Unit 2, Belview Port, Gorteens, Co. Kilkenny. The development will consist of the amendment of condition no. 3 Pl. Ref. 11/397 to include for the acceptance, unloading and storage of non-hazardous waste including construction and demolition waste, end of life tyres and other non-hazardous bulk wastes for onward export. The application is accompanied by an Environmental Impact Assessment Report (EIAR) and Natura Impact Statement (NIS).Decision record indexed
Demolition of derelict dwelling and agricultural outbuildings, construction of new dwelling, domestic carport, new entrance from local road and new driveway, proprietary wastewater treatment plant and percolation area. Construction of 5no. stables and storage shed, landscaping and all other associated site works.Decision record indexed
For the refurbishment of the existing gate house / security office at the main entrance to Belview Port to include new external cladding and windows, and a proposed extension to the existing structure to add toilet facility and associated site worksDecision record indexed