to
to

Planning records

Showing 751-800 of 4,032 public records
Page 16 of 20
  1. © OpenStreetMap
    22/5026Granted

    46 Glean Rua Ballygarvan Co.Cork

    Permission for retention to existing dwelling. These changes include (a) permission for retention of a single storey entrance porch to the north elevation and (b) retention of alterations to elevations (North and East) and all associated site worksDecision record indexed
    Decision21 June 2022View record
  2. © OpenStreetMap
    20/4477Granted

    Ballygroman Upper Ovens Co. Cork

    To construct a dwelling house, detached domestic garage, on site sewerage treatment and all associated site works.Decision record indexed
    Decision18 November 2020View record
  3. © OpenStreetMap
    21/5112Granted

    27 Gleann Dara Ballygarvan Co. Cork

    The construction of a two storey side extension incorporating first floor extension over existing single storey side annexe, single storey rear extension to an existing dwelling and associated site works.Decision record indexed
    Decision14 June 2021View record
  4. © OpenStreetMap
    20/5349Granted

    27 Gleann Dara Ballygarvan Co. Cork

    Construction of a two storey rear extension, first floor side extension, extension to ground floor roof canopy and the retention of a front porch to an existing dwelling and associated site works.Decision record indexed
    Decision02 September 2020View record
  5. © OpenStreetMap
    20/6225Granted

    Ballycraheen and Garraun South Donoughmore Co. Cork

    Construction of a livestock underpass, effluent holding tank and all associated siteworks.Decision record indexed
    Decision06 April 2021View record
  6. © OpenStreetMap
    23/5555Granted

    Ballynabortagh Carrignavar Co Cork

    Installation of a cattle underpass, soiled water tank and associated works.Decision record indexed
    Decision14 September 2023View record
  7. © OpenStreetMap
    21/5498Granted

    Inchera AGI Wallingston Industrial Estate Little Island Co. Cork

    The replacement of the current 2.4m high chainlink perimeter fence with a 2.4m high palisade fence. This includes the replacement of a 4m wide access gate located at entrance of the site as well as emergency exits located on the perimeter. Additionally, new single leaf access is to be installed adjacent to the main access gate.Decision record indexed
    Decision21 July 2021View record
  8. © OpenStreetMap
    20/5510Granted

    No. 31, Gleann Dara Ballygarvan Co. Cork

    Permission for retention of an existing bathroom and permission to construct an extension to dwellinghouse.Decision record indexed
    Decision02 September 2020View record
  9. © OpenStreetMap
    23/4580Granted

    Glancam Grenagh Co.Cork

    Permission to (i) construct a new easy feed slatted livestock house adjacent to existing slatted house. Proposed slatted unit to incorporate associated underground slurry storage tank with external agitation points, cubicles, easy feed & ancillary concrete, (ii) construct a new roof over existing tank. The above mentioned development to be carried out with all associated ancillary site worksDecision record indexed
    Decision19 May 2023View record
  10. © OpenStreetMap
    22/5291Granted

    Ardalaghta Gormlee Carraig na bhFear Co. Cork

    The construction of a two storey dwelling and domestic garage/hobby room, the provision of: solar collectors and heat pump, a septic tank and percolation area, private well, modifications to entrance, access driveway and all other ancillary site development works.Decision record indexed
    Decision30 January 2023View record
  11. © OpenStreetMap
    22/6488Granted

    Killanully Ballygarvan Co.Cork

    Permission for the continuation of use of existing construction and demolition (C&D) waste recovery facility at Killanully, Ballygarvan, co.Cork (previously permitted under Cork County Council Planning Ref. 16/05993). Recovery activities principally comprise crushing of construction and demolition waste materials using mobile plant and stockpiling of materials on existing hard standing area on site of 1.9 hectares with in an existing quarry. The application also includes provision for a waste inspection shed (35m2) and a new wheel wash at the site. The recovery facility will continue to share other existing site infrastructure including a portacabin office and weighbridgeDecision record indexed
    Decision10 January 2023View record
  12. © OpenStreetMap
    21/7379Granted

    Kilclogh Vicarstown Co. Cork

    Construction of a x 3.0m wide x 2.1m high internal dimensions with 250mm walls x 12.0m long precast concrete underpass under the L- 2752-48 road to connect our lands together with all associated pathways.Decision record indexed
    Decision07 April 2022View record
  13. © OpenStreetMap
    25/4080Granted

    Ballyduhig South Ballygarvan Co.Cork

    Permission to decommission existing septic tank and install new sewerage treatment system to serve existing dwelling houseDecision record indexed
    Decision24 March 2025View record
  14. © OpenStreetMap
    23/4374Granted

    Magooly Dripsey Co. Cork

    Construct dwelling, install a treatment unit and all associated site works.Decision record indexed
    Decision04 July 2023View record
  15. © OpenStreetMap
    25/4299Granted

    Ballinrea Carrigaline Co.Cork

    Permission for the construction of the proposed development on agricultural land will comprise of the following; A Battery Energy Storage System with associated infrastructure including a new internal access road approximately 0.8km in length, a 1.6km 33kV double circuit underground cable grid connection to be permitted Ballinrea Solar Farm 110kV substation (Planning ref ABP-317706), to be installed in an excavated trench including underground ducting; modular office and welfare buildings, three steel storage containers and all associated site development and reinstatement worksDecision record indexed
    Decision09 February 2026View record
  16. © OpenStreetMap
    25/6424Granted

    Gortatray, Berrings, Co.Cork

    Permission for proposed cosntruction of a new detached dwelling house, provision of a waste water treatment system with percolation area and all associated site works.Decision record indexed
    Decision30 March 2026View record
  17. © OpenStreetMap
    24/5699Granted

    Gortatray Berrings Co. Cork

    Permission for the construction of a single storey, three-bedroom dwelling house, single storey detached garage, on-site effluent treatment system and ancillary site works.Decision record indexed
    Decision06 March 2025View record
  18. © OpenStreetMap
    24/4238Granted

    Inchera Little Island co.Cork

    The removal of an existing steel frame and the construction of an unmanned fuel service station solely for the use of trucks consisting of 1) 1 no. diesel island dispensing diesel on each side; 2) the re-use of 2 no. existing above ground tanks for diesel storage; and 3) all associated ancillary development works including vehicular access, landscaping, drainage, plant and services area. Extension of Duration to Permission granted under Planning Ref. No. 18/6138Decision record indexed
    Decision22 May 2024View record
  19. © OpenStreetMap
    24/6412Granted

    Lyre Carrignavar Co Cork

    Permission for:- 1) Poultry house, 2) Soiled water tank. The above is to be carried out in conjunction with all associated site works.Decision record indexed
    Decision19 August 2025View record
  20. © OpenStreetMap
    25/5993Granted

    North Esk Business Park, Dunkettle, Co.Cork

    Permission to erect a 30 metre high lattice tower with antennas, dishes and associated telecommunications equipment, including equipment cabinets at ground level all enclosed by security fencing.Decision record indexed
    Decision28 January 2026View record
  21. © OpenStreetMap
    24/5286Granted

    Clashanure Mullaghroe Ovens Co. Cork

    Permission for new single storey dwelling, domestic garage with car port, sewerage system and all associated works - accessed via existing Lee Valley Golf Club site entrance and access roadDecision record indexed
    Decision22 January 2025View record
  22. © OpenStreetMap
    24/4190Granted

    Lackenareague Ovens Co.Cork

    Permission for construction of new dwelling house with changes in design and layout to that granted under planning reference number 23/5415, new domestic garage, new entrance, wastewater treatment system together with all other ancillary site worksDecision record indexed
    Decision27 May 2024View record
  23. © OpenStreetMap
    23/5415Granted

    Lackenareague Ovens Co.Cork

    Permission for construction of new dwelling house and domestic garage, new entrance, waste water treatment system together with all other ancillary site worksDecision record indexed
    Decision30 August 2023View record
  24. © OpenStreetMap
    22/5290Granted

    (Ardalaghta) Gormlee Carraig na bhFear Co.Cork

    The retention of a mobile home for applicant's occupation for a period of 5 yearsDecision record indexed
    Decision30 January 2023View record
  25. © OpenStreetMap
    21/5387Granted

    Ballynabearna Ballinhassig Co. Cork

    To demolish existing derelict dwellinghouse, to construct a dwellinghouse, a garage for domestic purpose, to install a septic tank and to carry out all associated site works. Extension of duration of permission granted under planning reference: 16/6214.Decision record indexed
    Decision12 July 2021View record
  26. © OpenStreetMap
    20/6249Granted

    North Esk Business Park Dunkettle Glanmire Co. Cork

    To construct a new two storey building for office accommodation, staff facilities, parking, entrance off existing estate road and all ancillary site works.Decision record indexed
    Decision26 March 2021View record
  27. © OpenStreetMap
    22/5680Granted

    Gormlee Carrignavar Co.Cork

    1) Alterations, ground floor extensions (front and rear), first floor rear extension and elevational changes to dwelling house, 2) Alterations, side porch extension and partial change of use of ground floor of existing dwelling house to granny flat, 3) Upgrading existing wastewater treatment system; along with all associated site works and servicesDecision record indexed
    Decision19 December 2022View record
  28. © OpenStreetMap
    26/0254Granted

    30, Gleann Rua, Ballygarvan, Cork, T12P5PX

    Permission for removal of existing steel garden shed and construction of a single storey garage for domestic use and associated site worksDecision record indexed
    Decision31 March 2026View record
  29. © OpenStreetMap
    24/4438Granted

    Templemichael Whites Cross Co.Cork

    Permission for the importation of soil and stone, bricks, tiles, ceramics, concrete for the raising of an agricultural field in order to improve agricultural output of the field using an existing site entranceDecision record indexed
    Decision27 February 2025View record
  30. © OpenStreetMap
    22/4218Granted

    Ballyhooleen Ballinhassig Co Cork

    (A) Retention permission to retain the change of use of an existing structure from that of an agricultural machinery store to use as a workshop and storage ancillary to the family pneumatics business, (B) Construct a new agricultural machinery store abutting the aforementioned existing structure and all associated worksDecision record indexed
    Decision17 June 2022View record
  31. © OpenStreetMap
    20/4676Granted

    No. 3 The Cottages Richmond Dunkettle Glanmire, Co. Cork

    Retention of alterations, ground and first floor extensions, carport and balcony all to an existing cottage.Decision record indexed
    Decision27 January 2021View record
  32. © OpenStreetMap
    23/4950Granted

    Glenview House Ballyhooleen Ballinhassig Co Cork

    Construct an extension to their existing dwelling house and all associated works.Decision record indexed
    Decision30 June 2023View record
  33. © OpenStreetMap
    20/5549Granted

    Inchera Little Island Co. Cork

    Construction of a renewable bioenergy plant to generate up to 4MW of electricity from 90,000 tonnes of non-hazardous biodegradable waste per annum utilising anaerobic digestion (AD) technology on a 2.01 hectares site. The proposed plant will comprise the following elements: (1) Demolition of the existing decommissioned waste water treatment plant and associated ancillary buildings and the existing utility building located on the east side of the site (c.1425sqm footprint); (2) Main processing building (c.4500sqm floor area up to 14.5m high) incorporating feedstock reception and processing areas, digestate treatment areas, dewatering and storage areas, quarantine areas and the odour control system (c. 12m high, 773sqm floor area) and 25m high stack; (3) Service yard area including 2no. weighbridges, weighbridge office (c.435m high and 17sqm floor area), 2no. car parking spaces, bunded vehicle refuelling area (c.56sqm floor area) with diesel storage tank (2500 litres), workshop (c. 7m high and c. 70sqm floor area), and 1no. wheel wash; (4) Tank farm (c.2900sqm footprint) encompassing 4no. digester tanks (up to 25.5m max. height, c. 5000 metres cubed), 4no. grit removal buffer tanks (up to 24m max. height, c. 630 metres cubed), 2no. post-digestion buffer tanks (up to 24m max. height, c. 630 metres cubed) and 2no. pasteurisation tanks (up to 19m max. height, c. 217metres cubed), 2no. post pasteurisation and sludge storage tanks (up to 24m max. height, c. 630 metres cubed), 1no. process water tank (up to 25.5m max. height, c. 1280 metres cubed), 1no. concentrate tank (up to 10m max. height, c. 240 metres cubed), 4no. chemical storage tanks (up to 5m max. height, c. 48.1 metres cubed), total 20no. tanks in the tank farm, to include a stairwell tower (up to 25m max. height), gantry walkways, 3m high bund wall, 2no. bund access stairs, and 6no. tank emergency access ladders; (5) 2no. enclosed Combined Heat and Power (CHP) 2MW engines (c. 3.6m high and c.66sqm floor area each), 28m high CHP stack, c.14m high gas storage dome (1800 metres cubed) with 4no. lightning rod electrodes (c.18m high), 8.2m high biogas flare stack, gas treatment equipment enclosed in a c.1.8m high container (c.31sqm floor area) containing a gas booster and dryer and a c.2.5m high container (c.79sqm floor area) containing a boiler, 10m high boiler stack, 3no. bunded electrical transformers (c.5m high with 1m high bund wall and c.117sqm floor area), c.3.0m high substation (c.70sqm floDecision record indexed
    Decision11 September 2020View record
  34. © OpenStreetMap
    25/6096Granted

    Inchera, Little Island, Co. Cork

    The development will consist of permission to amend Condition No. 23 of Cork County Council Planning Register No. 25/05034 to allow construction to extend by one additional hour in the evenings, Monday to Friday, and by one additional hour in both the morning and afternoon on Saturdays. Site development and building works shall only be carried out between the hours of 08:00 to 19:00 Mondays to Fridays inclusive, between 08:00 to 14:00 on Saturdays and not at all on Sundays and Public Holidays. Deviation from these times shall only be allowed in exceptional circumstances where prior written approval has been received from the Planning Authority. Reason: In order to safeguard the amenities of adjoining landuses. The application relates to development which comprises or is for the purpose of an activity requiring an Industrial Emissions Directive Licence issued by the Environmental Protection Agency, Reg. No. P1018-01.Decision record indexed
    Decision25 November 2025View record
  35. © OpenStreetMap
    25/5034Granted

    Inchera Little Island Co.Cork

    Permission for the proposed development will consist of the completion of the Renewable Biogas Plant as permitted by extant planning permission ref. 15/4926, extended by ref 20/5549 and amended by ref 23/5586. All demolition, site clearance, earthworks and formation for foundations will be complete under the current permission. The proposed plant will generate renewable biogas from 90,000 tonnes of non-hazardous biodegradable waste (‘Brown bin’ domestic and commercial waste) per annum utilising anaerobic digestion (AD) technology. It is proposed to upgrade the biogas to biomethane and inject it into the adjacent gas grid to replace fossil fuel derived natural gas. Other products from the process include digestate (a nutrient rich biofertilizer) as well as biogenic (natural) carbon dioxide. The proposed development will consist of the construction of: 1) main process building (c.3,762m2 gross floor area (GFA), max 14.5m high) incorporating feedstock reception and processing area, digestate treatment areas, dewatering and storage areas, quarantine areas, an odour control system and associated 25m high stack with signage on the south elevation. 2)Tank farm (c. 3,183m3 footprint, 4m high bund wall) encompassing a total of 6 tanks including four digestor tanks (20.15m max. height, c.3,400m3 capacity) a digestate storage tank (20.15m max. height, c.3,400m3 capacity), a suspension buffer tank ( 10.5m max.height, c.700m3 capacity (, an containerised desulphurisation plant and associated 2 tanks (14m max height, c120m3 capacity), 2 no. enclosed pump rooms (room no.1 -53.58m2 GFA and room no.2 – 23.69m2 GFA), and enclosed feedstock pump room (53.58m2 GFA and 3.6m high), 3 sediment settlement tanks (c.5.84(L), c.2.23m (W) & c.3.78(H) on a raised platform at 6m above ground level, stairwells, pumps, gantry walkways, 2 bund access stairs and tank emergency access ladders; 3) A biogas upgrade plant and gas entry unit; 1 no. containerised Combined Heat and Power (CHP) 1.5MW unit with an associated 28m high stack, a carbon dioxide liquefaction plant, a biogas holder (10.56 max. height, c.2,000m3) with 4 no. c.13.12m high lightning rods, a 9.26m gas flare, a containerised boiler with 10m stack, a transformer station, a propane storage tank, an emergency generator, 2 no. weighbridges, weighbridge office (c.17.2m2 GFA and 4.55m high), a fire water tank (c.1,000m3 and 14.12m high), a bunded vehicle refuelling area with a fuel storage tank (2.5m3) and a wheel wash, 4) Administration building (c.393.25m2 GFA) and a workshop (c.70m2 GFA), 5) 31 car parking spaces (including 2 electric vehicle charging points and a universal parking space), 2 motorcycle parking spaces and a covered bicycle rack; 6) Boundary treatment including 2.4m high perimeter fencing (mix of mesh wire fencing and acoustic fencing), access gates on the south western and north eastern boundaries; and 7) all ancillary site development works and services including landscaping, lighting, 2 no. directional signs, service yard area and internal circulation routes, pipe bridge, footpath and all site drainage works. The application relates to development which comprises or is for the purpose of an activity requiring an Industrial Emissions Directive Licence issued by the Environmental Protection Agency, reg. no. P1018-01. An Environmental Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS) have been prepared and will be submitted to the planning authority with the application.Decision record indexed
    Decision24 July 2025View record
  36. © OpenStreetMap
    21/6440Granted

    Inchera Industrial Estate Inchera Little Island Co. Cork

    Replacement of existing 60m3 external dry goods storage silo, with 120m3 external dry goods storage silo, with external maintenance access stairway. This development is within a site to which the Major Accident Directive applies. No alteration to the existing Integrated Pollution Prevention and Control (IPPC) license is required.Decision record indexed
    Decision25 January 2022View record
  37. © OpenStreetMap
    24/4983Granted

    Shanlyre Whitechurch Co Cork

    Permission for:- a) Demolition of existing agricultural buildings, b) Construction of the following:- 1) Extension to existing roofed colleting yard, 2) Agricultural building to include straw bedded livestock housing over existing slatted tank along with livestock handling facilities, 3) Roofing of existing manure pit, 4) Unroofed slurry tank, 5) 2 no. unroofed silage pits and apron along with associated site works. Extension of Duration to Permission granted under Pl. Reg. No. 19/4815.Decision record indexed
    Decision18 July 2024View record
  38. © OpenStreetMap
    24/5233Granted

    Ballyshoneen Berrings Co. Cork

    Permission for decommissioning existing septic tank and construct a wastewater treatment system to serve existing dwelling house, with associated site works.Decision record indexed
    Decision26 August 2024View record
  39. © OpenStreetMap
    23/6631Granted

    Ballynabearna Ballinhassig Co. Cork

    Permission for an agricultural entrance and associated Site works.Decision record indexed
    Decision09 September 2024View record
  40. © OpenStreetMap
    26/0618Refused

    Lisheenowen, Whitechurch, Co. Cork, T34D294

    Permission for: i) Domestic garage for storage and restoration of vintage cars, ii) Home office, iii) Septic tank and percolation area to serve home office iv) New entrance and (v) All associated site works.Grounds not yet categorised
    Decision05 May 2026View record
  41. © OpenStreetMap
    21/4644Granted

    Ballymurphy North Innishannon Co. Cork

    (A) Retention permission of existing silage pit. (B) Construction of an agricultural building to include livestock cubicles, straw bedded area and underground slatted slurry tanks. (C) Construction of an agricultural building to include a milking parlour, dairy and ancillary rooms, storage area, livestock waiting yard, handling facilities and underground soiled water tank. (D) Construction of a roof over an existing roofless livestock yard. (E) Erection of a meal bin and water storage tank. (F) Construction of a dungstead and all associated site works.Decision record indexed
    Decision01 June 2021View record
  42. © OpenStreetMap
    24/5207Refused

    Clashanure Ovens Co. Cork

    Permission for the construction of a new dwelling house, domestic garage, new entrance, wastewater treatment system, deep bored well and all associated site works.Grounds not yet categorised
    Decision19 August 2024View record
  43. © OpenStreetMap
    20/5701Granted

    Ballyshonin Berrings Co. Cork

    The construction of an extension along with modifications to the existing dwelling, and all associated works.Decision record indexed
    Decision07 April 2021View record
  44. © OpenStreetMap
    25/5956Granted

    Cuan Barra, Coolatooder, Ballinhassig, Co. Cork, T12F53F

    Permission to replace existing septic tank with new septic tank and percolation area.Decision record indexed
    Decision12 November 2025View record
  45. © OpenStreetMap
    25/4740Granted

    Clashanure Ovens Co.Cork

    Permission for a domestic garageDecision record indexed
    Decision10 June 2025View record
  46. © OpenStreetMap
    25/4674Granted

    Ballycraheen Donoughmore Co Cork

    Permission to construct a new dwelling house.Decision record indexed
    Decision12 November 2025View record
  47. © OpenStreetMap
    23/5586Granted

    Inchera Little Island Co.Cork

    Permission for an amendment to the permission granted under ref.15/4926 as extended by ref 20/5549 for renewable bioenergy plant. The amendment consists of: 1) omission of one permitted combined heat and power (CHP) enclosure to reduce the CHP capacity from 4MW to 1MW, 2) replacement of the CHP capacity by installation of a biogas upgrade unit to generate renewable gas from biogas, 3) installation of a gas grid entry unit to facilitate the export of renewable gas to the national gas grid, 4) installation of a carbon capture and storage unit to take the carbon dioxide stream from the biogas with associated tank and filling area to facilitate off-site export for use in industry, 5) amendments to the permitted tank farm to; a) reduce the number of tanks from the permitted 16 process tanks to 9 process tanks. All tanks will remain within the max permitted capacity and height. b) reduce the footprint of the tank farm and increase the bund wall height by 1.3m, 6)ancillary development works include installation of pipe runs, reorganisation of permitted car parking layout, relocation of a weighbridge, relocation of permitted boiler and stack and biogas holder, all to facilitate the proposed amendments. The proposed development is wholly within the permitted site boundary and relates to changes confined to the east of the site covering an area of approximately 0.7ha. The application relates to development which comprises or is for the purpose of an activity requiring an industrial emissions directive licence issued by the environmental protection agency reg no. P1018-01.Decision record indexed
    Decision17 November 2023View record
  48. © OpenStreetMap
    21/4367Granted

    Clashanure Ovens Co. Cork

    The construction of a single storey detached garage to the southern side of the existing dwelling and a carport to connect between the proposed garage and existing dwelling with driveway alterations to suit and associated site development works.Decision record indexed
    Decision31 March 2021View record
  49. © OpenStreetMap
    20/4150Refused

    Ballinrea Carrigaline Co. Cork

    Dwelling house and all associated site development works.Grounds not yet categorised
    Decision21 March 2020View record
  50. © OpenStreetMap
    24/5895Granted

    Castlehyde Dunkettle Richmond Glanmire Co Cork

    Permission for Retention of two storey (dormer bungalow) rear extension, external store and all associated site works at an existing single storey dwelling.Decision record indexed
    Decision03 December 2024View record
Showing 751-800 of 4,032
Page 16 of 20