Retention permission for the following: (1) 2 No. roof lights located on northern roof pitch and (2) 2 No. gable windows located on east elevation, together with all associated site works at Belleek, Belleek Manor, Ballina, Co. Mayo.Decision record indexed
(1) Retain existing first floor window located on the west elevation, (2) 2 No. roof lights located on northern roof pitch and (3) 2 No. gable windows located on east elevation, together with all associated site worksGrounds not yet categorised
Permission for development at this site at Killala Road, Ballina, Co. Mayo. The proposed development will consist of, 1. The construction of a new staff facilities to include, 2. Changing and Welfare Facilities, including at Ground level 3. Ancillary Building Services and Storage Areas at Ground level 4. Staff Canteen and Kitchen and associated accommodation at First Floor Level 5. Ancillary Building Services at First and Roof level 6. A first floor link corridor connecting the applicant’s existing facility 7. Reconfiguration of car parking spaces, the provision of secure bicycle parking spaces and drop-off/loading area. 8. The removal of a single storey pre-fabricated temporary structure, granted under MCC planning Ref: P2360015 9. All associated site works.Decision record indexed
For retention permission during the course of construction for the following: (1) Changes to all elevations, (2) Increased ridge height on the proposed house, together with all associated site works at Erris House, Belleek, Ballina, Co. Mayo, F26YN56.Decision record indexed
ALTERATIONS TO EXISTING DWELLING TO INCLUDE EXTENSION TO REAR AND SIDE OF DWELLING, NEW PORCH TO FRONT ELEVATION, STONE CLADDING TO EXISTING CONSERVATORY AND ALL ASSOCIATED SITE WORKS.Decision record indexed
Croaghaun West Srahnakilly and Bellacorick townlands, Bellacorick, Co. Mayo
The development will consist of a 114 Megawatt gas fired peaking power plant (which will be capable of running on a mix of natural gas and hydrogen) comprising the ’electricity generating station’. The electricity generating station will comprise of 2 no. open cycle gas turbine (OCGT) generators each consisting of an air intake filter system, exhaust stack (28 metres high), air vent stack, inter cooler system, turbine control room and transformers. In addition the development will include: • Above Ground Installation (AGI) to facilitate connection to the Gas Network, with compound area of 1,600 m²; • 3 no. Gas AGI buildings; • Admin & welfare block; • Electrical Substation with area of 3,800 m²; • 1 no. Substation building; • Electrical building; • 3 no. Secondary fuel storage tanks with volume of 3,600 m³; • Fire Water Storage Tank & Pumphouse; • Sludge Tank & Pump House; • Resurfacing, Repair and Improvement of Existing Site Entrance; • Replacement Bridge; • Gatehouse; • Internal Access Roads; and • Associated Grid Connection Works within the L52925 Public Roadway. The development will include the provision of 12 no. parking spaces, footpaths, landscaping, fencing and all other associated site development plant and equipment and other works including surface water and foul wastewater drainage infrastructure. The development includes for the demolition and removal of a dwelling (112 m²) and associated farmyard barn and outbuildings (94 m², 15 m², 17 m² and 45 m²), all within a total overall application boundary of 4.35 ha. It should be noted in respect of this planning application that permission is sought for a period of 25 years.Decision record indexed
Construct new dwelling house, construct new domestic garage, construct new effluent treatment system with all associated works, construct new domestic entrance off public road and carry out all required ancillary works on siteDecision record indexed
Full planning permission for the construction of a new 192m2 single storey pre-fabricated temporary structure, together with all associated site worksDecision record indexed
The development will consist of the construction of a new dwelling house, domestic garage, new site entrance and connection to public utilities together with ancillary site development works.Decision record indexed
RETAIN EXTENSION TO REAR OF DWELLING HOUSE, RETAIN PORCH TO FRONT OF DWELLING HOUSE AND TO UPGRADE SEPTIC TANK TO PROPRIETARY EFFLUENT TREATMENT SYSTEMDecision record indexed
Full planning permission for the following: 1. The demolition of the existing Sean Duffy Community Centre 2. The construction of a new proposed community centre and sports facility ancillary to Ardnaree Sarsfields sport pitch 3. The provision of new carpark, all this together with connection to services and all associated site worksDecision record indexed
SINGLE STOREY PROCESS BUILDING OF 13.3M HEIGHT; 16 NO. FIN FAN COOLERS OF 6.9M HEIGHT; HYDROGEN STORAGE AREA WITH AREA OF 4650M2; GAS INJECTION COMPOUND WITH AREA OF 1000M2; 2 NO. GAS AGI BUILDINGS, EACH OF 3M HEIGHT; ELECTRICAL SUBSTATION WITH AREA OF 2407.6M2; 2 NO SUBSTATION BUILDINGS, EACH OF 4M HEIGHT; RAW WATER AND FIRE WATER STORAGE TANK WITH VOLUME OF 879.6M3; PUMP HOUSE OF 5M HEIGHT; WATER ABSTRACTION CHAMBER WITH VOLUME OF 2.9M3; RESURFACING, REPAIR AND IMPROVEMENT OF EXISTING SITE ENTRANCE; REPLACEMENT BRIDGE; INTERNAL ACCESS ROADS AND ASSOCIATED GRID CONNECTION WORKS WITHIN THE L52925 PUBLIC ROADWAY. THE DEVELOPMENT WILL INCLUDE THE PROVISION OF 12 NO. PARKING SPACES, FOOTPATHS, LANDSCAPING, FENCING AND ALL OTHER ASSOCIATED SITE DEVELOPMENT PLANT AND EQUIPMENT AND OTHER WORKS INCLUDING SURFACE WATER AND FOUL WASTEWATER DRAINAGE INFRASTRUCTURE WITHIN A TOTAL OVERALL APPLICATION BOUNDARY OF 6.51HADecision record indexed
CONTINUED USE AND OPERATION OF THE EXISTING LIMESTONE QUARRY (C. 3.97 HA) INCLUDING WHEELWASH, SETTLEMENT LAGOONS, PORTABLE OFFICE, WORKSHOP AND ALL ASSOCIATED ANCILLARY ACTIVITIES, PERMITTED UNDER PLAN REG. REF. NO. 02/1931 AND 08/1563; INSTALLTION OF A PACKAGED WASTEWATER TREATMENT SYSTEM AND POLISHING FILTERDecision record indexed
CONSTRUCTION OF A NEW DWELLING HOUSE, GARAGE, SEWAGE TREATMENT SYSTEM, PERCOLATION AREA AND ALL ASSOCIATED SITE WORKS AND SERVICESDecision record indexed
Construction of a new two storey detached dwelling house and domestic garage, together with connection to public services and all associated site works at Old French Road, Farrannoo Td., Ballina, Co. Mayo.Decision record indexed
Construction of a new two storey detached dwelling house and domestic garage, together with connection to public services and all associated site works at Old French Road, Farrannoo Td., Ballina, Co. Mayo.Grounds not yet categorised
Permission to construct Roofed Slatted feeding area (ii) Slatted tank (iii) flow channel and all associated site works. Demolition of open slurry tank also requiredDecision record indexed
The development will consist of the construction of new dwelling house, domestic garage, on-site wastewater treatment system, new site entrance together with ancillary site development works.Decision record indexed
Retention permission for revised entrance and driveway from that granted under P98/2820 (eastern boundary) to west side of front boundary, retention permission for revised boundaries to south elevation (rear boundary), retention permission for additional windows and velux roof lights to side and rear elevations, retention permission of existing roof space to storeroom and study area. Planning permission for new staircase from existing ground floor to storeroom and study area, to include all retained ancillary site development works in accordance with previous planning ref. P98/2820Decision record indexed
ALTERATION, CONVERSION AND EXTENSION OF EXISTING STABLES TO DWELLING WITH CONNECTION TO PUBLIC SERVICES AND ALL ANCILLARY SITE WORKSDecision record indexed
DEMOLISH EXISTING DWELLINGHOUSE AND CONSTRUCT REPLACEMENT DWELLING HOUSE, DOMESTIC DOUBLE GARAGE, WWTP AND PERCOLATION AREA, WITH NEW ACCESS TO EXISTING ROAD, AND CARRY OUT ALL ANCILLARY AND ASSOCIATED SITE WORKSDecision record indexed
Construction of a new house, access road, connections to public services and ancillary site development works and services above and below groundDecision record indexed
CONSTRUCT DWELLING HOUSE, DOMESTIC GARAGE, INSTALL EFFLUENT TREATMENT SYSTEM WITH PERCOLATION AREA AND TO CARRY OUT ALL ASSOCIATED ANCILLARY SITE WORKSDecision record indexed
To carry out alterations to front and end elevations of existing dwellinghouse, to include removal of curved walls and roof and rebuilding feature facades. To construct extension along rear elevation. To revise site boundaries, previous grant of planning retention refers and to carry out minor ancillary site worksDecision record indexed
(1) the demolition of an existing storage shed, (2) construction of a new detached assisted living unit associated with the existing dwellinghouse, (3) Alteration to the existing front elevation & (4) the proposed extension to the rear of the existing dwelling house, together with connection to services and all associated site works at, Garrankeel, Ballina, Co. Mayo.Decision record indexed
Synchronous condenser/flywheel, located within a fenced compound of c.0.85 ha consisting of: machine building to house equipment including the synchronous condenser, flywheel, lube oil skid, air compressor and pumps. Supporting items of plant; cooling equipment, c.6m high modular containers to house electrical and control equipment, 2 auxilliary transformers and electrical plant including external circuit breaker, HV electrical compound with electrical switchgear and main step-up transformer and new c.200m underground cable grid connection to the Bellacorick 110kv substation; diesel generator, fire water tank, underground oil separator and collection pit, services connections including electrical, water and wastewater and constructed wetland connecting ot Owenmore River; 3 office/welfare buildings and 2 spare parts containers. External lighting poles c. 9m, lightning monopole and Scada communications mast,. 4 fire walls around main step up transformer c. 8m high, 2 fire walls either side of auxilliary transformers c. 5m high, 3 firewalls around cooler for main transformer, 8m high. Ancillary site clearance and developemt works including provision of areas of hardstanding, internal access roads, laydown area, car parking and connection to site services networks. The development will be bounded by one c. 3.6m high palisade fence on the east side and one 5m high palisade fence to the south side. Site access will be by means of a new c. 3.6m high palisade gate and a second 3.6m sliding gate accessed from the Shranakilla Road off the N59. Permission sought is for 10 years. NIS submitted with application.Decision record indexed
Change of use of the existing four-storey building on site (previously used as a grain store and boxing gymnasium) to residential use to create one residential unit. The proposed development will also provide for complete refurbishment and upgrade of the existing building, including new gable windows and all associated site development and clearance works, soft and hard landscaping, new vehicular entrance off the Downhill Road and connections to all environmental servicesDecision record indexed
CHANGE OF USE OF PART OF EXISTING BUILDING TO RETAIL USE. PERMISSION IS ALSO SOUGHT FOR EXTERNAL SIGNAGE TO THE EXISTING FRONT ELEVATION AS SHOWN ON PLANS AND ALL ANCILLARY SITE DEVELOPMENTSDecision record indexed
For full planning permission for the following: (1) Demolition works to existing derelict dwelling and outbuilding, (2) Construction of a new two-storey extension, (3) Renovations to existing dwelling with changes to elevations and (4) Upgrade of existing septic tank to proprietary wastewater treatment system, together with all associated site works.Decision record indexed
Retention of development. The development consisted of change of use of a single storey garage and boiler house to a bedroom and En-suite shower/W.C. and relocate boiler room to new boiler house at rear. Revised internal layout to include new bathroom with W.C. and revised fenestration to the rear elevation of the dwelling including all associated site works and servicesDecision record indexed
Abbeyhalfquarter, IDA Industrial Estate, Bunree Ballina Co. Mayo
Planning permission for development consisting of the following (1) Change of use from existing light industrial (P02/2256 Refers) to recreational/Leisure facility (2) building signage to front elevation (3) Amend existing car parking and provide bicycle parking, (4) and the carrying out of all associated ancillary site works at Abbeyhalfquarter, I.D.A. Industrial Estate, Bunree, Ballina, Co. Mayo.Decision record indexed
The application will consist of planning permission to (1) Partially demolish existing dwelling house, (2) Alter and extend existing dwelling house, and (3) Carry out all required ancillary works on site.Decision record indexed
The application will consist of planning permission to (1) Demolish existing back extension, (2) Alter and extend existing dwelling house, and (3) Carry out all required ancillary works on site.Decision record indexed
Knocknalyre or Downhill Td., Riverslade, Ballina Co. Mayo.
1. The demolition of our existing two storey dwellinghouse and domestic garage, 2. The Construction of a new two storey dwellinghouse, together with ancillary site works and reconnection to existing on site services 3. The relocation of our vehicular entrance from its existing location to a position further north along our front boundaryDecision record indexed
Construction of an extensions to the rear and side of an existing dwelling house to be used as an independent living unit associated with the main dwellinghouse, together with all associated site worksDecision record indexed