20/5596Granted
The existing staff car park at Dairygold's Nutritional Campus and 5, 6 and 7 West End, Annabella Mallow, Co. Cork
The construction of a new 215mm solid block boundary wall with piers, of between 2.0-2.4m in height, plastered and capped, and new footpath, between the existing staff car park at Dairygold’s Nutritional Campus and 5 West End. The proposed development will also consist of the reinstatement of the original vehicular access via the archway between 6-7 West End (existing pedestrian/cyclist access, and existing gates to be retained); the blocking up of the existing northern pedestrian access from the existing car park (to match the existing boundary wall); and all ancillary works, including: the removal of existing internal bollards; the removal of the existing guardrail on West End; and the replacement of existing concrete footpath along West End; as well as all site development, drainage and landscaping works. There are no works proposed to the existing buildings at 5,6 and 7 West End (Protected Structures Reg. Nos. 100,101, and 102). The application relates to an establishment which has an Industrial Emissions License (P0403-03).Decision record indexedDecision03 December 2020View record