Construction of a new 3 storey mews development building of 4 no. 2 storey 2 bedroom duplex apartments. Accommodation will be at first and second floor levels with balconies at first and second floor levels facing Vauxhall Street. The ground floor will comprise of 4 no. off street parking spaces/car ports, entrances to duplex units and storage facilities for each unit along with a new footpath to Vauxhall Street, new controlled pedestrian access to Dublin Street to the northern corner of the site and all ancillary site development works. Add Info received 8th October 2020. Clarification of Add Info received 7th December 2020.
The development will consist of family flat extension to rear of existing bungalow dwelling. Conversion of existing single dwelling to dormer dwelling with first floor living space over entire proposed structure and all associated site works. AI received 23/09/21
For permission for a development at premises formally known as The Millrace Public House located at 1-3 Dublin Street, Balbriggan, Co. Dublin K32 H008. The development will consist of the construction of a new facade to include all associated site works. AI received 19/05/23
Permission to replace a previous phone kiosk. The development will consist of the replacement of a previous telephone kiosk with a new telephone kiosk with integral Communication Unit and a 1.53 sq. metre digital advertising display. The proposed structure has an overall height 2.43m, a depth of 0.762m and a width 1.096m.
A Retention Planning Permission (temporary) is sought for a single-storey coffee kiosk in the curtilage of Balbriggan Railway Station a protected structure.
Temporary planning permission for single storey kiosk in the curtiage of Balbriggan Railway Station a protected structure.
Planning permission for 1. Attic conversion with dormer to rear roof to accommodate attic stairs to allow conversion into non habitable storage, roof windows to front. 2 Single storey extension to side and front of existing house to create a bedroom and wetroom all with associated ancillary works.
Permission to extend the existing house to the front at ground floor level incorporating a first-floor balcony above, to enlarge and relocate the existing window openings in the front facade, to include new windows in the western facade, to demolish the existing chimneys on the western facade and to construct a new boundary wall along the western side of the existing house.
A new three-storey, three-bedroom townhouse with pedestrian entrance and garage access onto Vauxhall Street and with pedestrian entrance onto Dublin Street along with all associated siteworks to include connection to foul sewer on Dublin Street. Additional information received 20/08/2025
Planning Permission is requested for retention of existing single-storey porch extension to front and single-storey extension to rear of existing two-storey dwellinghouse.
Construction of a new single storey flat roof extension, with balcony, to the front elevation of the existing residential property including all associated site works. The extension will comprise of 27.6m². AI received 30/09/21 AI deemed significant Revised public notices (SAI) received 15/11/21
Retention permission for a single storey extension to the rear of the existing property at 4 Seabanks Road, Bath Road, Balbriggan, Co Dublin K32 VK22. The extension is in residential use and comprises of 20 sqm.
Construction of a new single storey flat roof extension with balcony to the front elevation of the existing residential property, including all associated site works. The extension will comprise of 27.6m2, glazing to the balcony will be opaque to the side elevations with clear glazing to the front.
Planning permission is requested for a new detached dormer bungalow to rear of existing dwellinghouse along with all associated site works to include new boundary treatment and new vehicular access.
The development consists of a change of use from commercial use to residential use, and the provision of 1 no. one bed apartment and 1 no. two bed apartment, accessed from existing common hallway, including all necessary site works.
Planning permission is requested for internal alterations and extensions to front and rear and to expand offering of childcare to provide both sessional and full-time day care in line with relevant guidelines along with associated site works. AI Rcvd 17/04/24
Construct a new entrance lobby at the first floor level on the southern facade, install new pedestrian entrance off existing pedestrian access ramp on the western facade, to install two new windows in lower ground floor level on western facade, to construct a new roof cover to the existing pedestrian access ramp along the western facade and to construct new entrance porch roof over the existing entrance door at lower ground floor level on the eastern facade and to install a new window on the eastern facade at first floor level.
Permission and Retention Permission for development on a site located within the curtilage of a Protected Structure (RPS Ref. 0019 - chimney of Former sea Mills Hosiery Factory). The development will consist of amendments to the Nursing Home development granted under planning Reg. Ref. F17A/0295 (An Bord Pleanála Ref. ABP-300673-18) and as amended under planning Reg. Refs F20/0430, F21A/0020 and F21A/0265. Retention Permission is sought for 2 no. additional windows at second floor in the northern wing of the building. Permission is sought for:- - 6 no. additional bedspaces within the permitted floor area of the building, 3 no. large bedrooms will become double bedrooms (3 additional bedspaces) and 2 office spaces will become a double bedroom and a single bedroom (3 additional bedspaces). The amendments will increase the no. of bedrooms from 96 to 98 and the number of bedspaces from 96 to 102. - 2 no. additional car parking spaces (total 26) to serve the extra bedspaces. - Minor amendments to the southern elevation at second floor to provide metal cladding over part of the facade. AI received 22/3/2022
The Site is located within the curtilage of a Protected Structure (RPS Ref:- 0019 - Chimney of Former Sea Mills Hosiery Factory) The development will consist of amendments to the Nursing Home Development granted under planning Reg. Ref. F17A/0295 (An Bord Pleanála Ref. ABP-300673-18) comprising the construction of a ground floor plant room at the location of the permitted bin store and the provision of a new bin store.
The site is located within the curtilage of a Protected Structure (RPS Ref 0019 - Chimney of former Sea Mills Hosiery Factory). The development will consist of amendments to the Nursing Home development granted under planning Reg. Ref F17A/0295 (An Bord Pleanála Ref ABP-300673-18) and as amended under planning Reg. Refs F20A/0430 and F21A/0020 comprising:- Reconfiguration of the car park and access road to provide 3 additional parking spaces; Upward extensions at each end of the building at second floor to accommodate 6 no. additional bedrooms.
Permission for amendments to the Nursing Home development granted under planning Reg. Ref, F17A/0295 (An Bord Pleanála Ref. ABP - 300673-18) and as amended under planning Reg. Ref. F20A/0430 comprising:- Repositioning and reconfiguration of 2 stair cores to comply with Building Regulations and the requirements of Fire Safety Certificate Ref. 20/4081. The amended stair cores will project out from the western and northern elevations at all levels and will partially extend into the 2nd floor set-backs at each end of the building. The site is located within the curtilage of a Protected Structure (RPS Ref. 0019 - Chimney of Former Sea Mills Hosiery factory.
The removal of all exisitng temporary school buildings,
The construction of an 8 sqm two storey extension to the rear and associated site works.
Alteration to the existing west elevation shop-front by providing a new aluminium and glass staff entrance door and on the north elevation a new exterior steel plated security metal fire escape door in grey (RAL 7012) to match the existing rear doors.
Permission for development at a c. 0.016 ha site in the service yard of Millfield Shopping Centre, Balbriggan, Co. Dublin. The development will consist of the construction of a sheltered canopy (c.101 sq.m) over 3 no. dedicated van parking spaces in the existing service yard and all ancillary site services and site development works.
For an amendment to previously granted planning permission register reference F18A/0441 to include raising the floor levels and overall height of the apartments by 500mm, the incorporation all of the works granted planning permission under register reference F21A/0240 into one development of 8 apartments and all associated site works. AI Rcvd 14/09/2023
(i) Construction of a two-storey, with single storey element to rear, flat-roofed building to accommodate 1 no. one-bedroom apartment and 1 no. two-bedroom apartment at ground floor level (each served by private garden to rear) and 1 no. three-bedroom apartment at first floor level (served by 2 no. balconies located on the north-west and south-west elevations); (ii) Provision of new shared vehicular & pedestrian accesses off Barnwall Court, 4 no. car parking spaces and 4 no. cycle parking spaces; and, (iii) Landscaping, boundary treatment, SuDS water drainage and all ancillary works necessary to facilitate the development.
Construction of a two-storey infill building to the front of an existing commercial premises, for the conversion of the existing commercial premises to residential accommodation and for all associated site works. Overall development comprising the new building and converted existing to contain 2 no. two-bedroomed apartments and 2 no. one-bedroomed apartments. AI received 06/09/21
Permission for demolishing sheds to rear of 4 Hampton Street & 3 High Street and demolish rear extension to no. 4 Hampton Street, construct a 6-unit apartment block to rear and convert 4 Hampton Street into 4 apartments units. Associated works to include provision for car parking and bicycles spaces and to include all associated works
Planning permission is requested for new all-weather training area (45m x 25m) to south of existing clubhouse along with associated floodlighting (4 x 12m columns), perimeter fencing and all associated siteworks. AI Rcvd 16/09/2024
The construction of 2 no. 3 bedroom semi-detached, two storey dwellings with attic level accommodation both with dormer windows and associated site works.
Retention of single storey domestic shed and all associated site works.
The development consists of the construction of 2 no. semi-detached, two storey dwellings with attic level accommodation and all associated site works. AI received 24/07/23
Planning Permission for external insulation to the front elevation onto the public footpath, and for external insulation to the side and rear elevations of an existing dwelling.
The development consists of the retention of ground floor
Planning retention of existing pedestrian gate access onto Old Market Green, and the Planning Permission for the demolition of the existing modern converted extension and shed to the side, the construction of 2 number, 3-bedroom dwellings, 2 storey high, new boundary treatments, to the rear and all associated site works. AI Received 15/04/2024 SAI Rcvd 20/05/24
The development will consist of the construction of four new padel courts (3 no. Will have a roof over), the erection of an associated modular amenity building and ancillary siteworks to include new access, parking area, bike racks, seating, landscaping, drainage & four totem signs (one located within the site, one located on the south-east corner of the site and two located on the footpath alongside the Harry Reynolds Road).
Retention of a single-storey building to the rear of existing two-storey building (Sunshine House) for use as educational/recreational activities, ancillary to the main building use and to include use as a Montessori/Pre-School between the hours of 9.00 a.m. and 12.30 p.m. Monday - Friday.
Planning permission is requested for a) an increase in capacity of existing preschool from 33 children up to 44 children. B) Extended opening hours to operate from 9.00am - 5.00pm to allow for morning and afternoon sessions. C) 1 no. additional staff car parking space. AI received 26/07/23
The construction of a new above ground Motor Control Centre (MCC) kiosk (24m3) and associated ancillary works within existing Quay street Waste Water Pumping station (WwPS).
Attic development to include removal of existing hipped section of roof, construction of a raised gable end, with new flat roof type dormer extension & window to rear, 1 Nr. rooflight to rear, installation of new window to side and associated site works.
Permission for development to consist of;
The development consists of retention permission for 3 no. external illuminated signage on the existing retail building's north elevation and all associated site works.
The proposed development will consist of (i) Installation of solar photovoltaic panels and associated fixtures and fittings on the roofs of the existing amenity building and forecourt canopy, and (ii) All other associated infrastructure and site development works.
Permission for demolition of the existing derelict bungalow and associated out buildings at Clonard Road, Balbriggan, Co Dublin (Eircode K32 YK29) and construction of 2 no. two storey with developed roof space terraces fronting onto Hampton Gardens Drive comprising 22no. residential units (11 no. 2 bed duplex units over 11 no. 1 bed ground floor apartments. Private amenity space is proposed to rear (east) of the units at ground floor level and projecting balconies at first floor level. Communal amenity space is also provided to the rear (east) at ground floor level. Car parking, consisting of one car parking space per unit, is located to the front (west) of the proposed 2 no. blocks of units. Permission is also sought for bin storage areas, hard and soft landscaping, cycle parking boundary treatments and all associated site development and infrastructure works forming the completion of the Hampton Gardens development. Add Info received 1st February 2021. Add Info deemed Significant 8th February 2021. Revised Public Notices received 19th February 2021.
The change of use of the two previously permitted retail units at ground floor under Reg. Ref. F12A/0341 to an extension of the permitted Training & Support Hub for School Leavers with Intellectual Disabilities, under Reg. ref. F18A/0502. Development will also include the internal fit-out and the proposal of one new entrance door on the west elevation and another one on the south elevation.
Permission for the partial demolition of the existing derelict structures to the rear of Bedford House, partial removal of the site boundary wall and creation of new public plaza, renovation of remaining existing derelict buildings and construction of a new three storey music school and auditorium as part of a new campus. The application also includes development at Rosscarrig, a protected structure consisting of a change of use to a commercial building, the replacement of an existing boiler house annex with a two-storey extension, a one storey ground floor extension to the rear elevation and 9 additional parking spaces. Add Info received 27th July 2020. Add Info deemed Significant 4th August 2020. Revised Public Notices received 11th August 2020.
Permission for the demolition of a single storey extension to the rear of the dwellinghouse, the construction of a two storey extension to the rear of the dwellinghouse and for associated site works and the retention development consists of the retention of a garden shed. AI received 30/08/21
We, Annur Islamic Foundation Balbriggan Ltd intend to apply for Retention Planning Permission for indefinite retention of a change of use from Retail to a place of worship and community centre at Old Market House, Market Green, Balbriggan, Co. Dublin. K32 X452 Old Market House, Market Green, Balbriggan is a protected structure – RPS No. 65 AI received 03/02/2025
Development at the rear of Roscarrig, which is a Protected Structure. The development consists of the installation of a two-storey external glazed service lift at the end of the coach house return. AI received 08/04/21