The development will consist of retention of as built 2no. two bed, two storey duplex units with associated private and communal amenity spaces, bin and bike store and all associated amendments to hard and soft landscaping and car parking on the adjoining street at Parklands Parade all in lieu of previously permitted creche and community facility at this location.
Replacement of non-original PVC windows with timber sash windows with thermally efficient slim-line double glazing in the protected structure and ancillary landscaping; retention of single storey pavilion incorporating open plan kitchen / dining / living room to rear of the house and minor internal alterations for senior parental accommodation and permission for alterations to elevational treatment of pavilion and garage.
Development to the immediate north of the site is the Carrigmore residential estate, to the west are agricultural lands and a single dwelling, to the east is the Corbally residential estate while to the south is the Boherboy Road; The proposed application represents the development of the entire Boherboy Neighbourhood as identified in the Fortunestown Local Area Plan (2012) consisting of 655 dwellings, comprised of 257 two, three & four bed, two & three storey detached, semi-detached & terraced houses, 152 one, two & three bed duplex units in 17 two to three, three to four & four storey blocks, and 246 one, two & three bed apartments in 9 buildings ranging in height from two, two to five, four to five & five storeys, and a two storey crèche (693sq.m); Access to the development will by via one vehicular access point from the Boherboy Road, along with proposed upgrade works to Boherboy Road to include the provision of a roadside footpath along the front of the site at the Boherboy Road, continuing eastwards to the junction with the N81 Blessington Road (for an overall distance of c.370m); The proposed development also provides for pedestrian and cyclist connectivity to the adjoining Carrigmore Park to the north-east, and vehicular, pedestrian and cyclist connections to adjoining developments at Corbally Heath to the east and Carrigmore Green to the north; The proposed development provides for (i) all associated site development works above and below ground, including surface water attenuation & an underground foul sewerage pumping station at the northern end of the site, (ii) public open spaces (c. 3Ha), including alongside the Corbally Stream, which will accommodate the provision of pedestrian / cyclist links to Carrigmore Park to the north-east, (iii) communal open spaces (c. 6,392sq.m), (iv) hard and soft landscaping and boundary treatments, (v) undercroft, basement & surface car parking (914 car parking spaces, including EV parking), (vi) bicycle parking (797 bicycle parking spaces), (vii) bin & bicycle storage, (viii) public lighting, and (ix), plant (M&E), utility services & 5 ESB sub-stations, all on an overall application site area of 18.3ha; In accordance with the Fortunestown Local Area Plan (2012) an area of c. 1.4Ha within the site is reserved as a future school site.
Kelland Homes Ltd. and Evara Developments Ltd. wish to apply for permission for a Large-scale Residential Development (LRD) on a site located at Boherboy, Saggart, County Dublin. To the immediate north of the site is the Carrigmore residential estate, to the west are agricultural lands and a single dwelling, to the east is the Corbally residential estate and Carrigmore Park, while to the south is the Boherboy Road. The proposed development consists of 611 no. dwellings, comprised of 306 no. 2, 3, 4 & 4-5 bed, 2 & 3 storey, detached, semi-detached & terraced houses, 133 no. 1, 2 & 3 bed duplex units in 12 no. 2-3 storey blocks, and 172 no. 1, 2 & 3 bed apartments in 5 no. buildings ranging in height from 4-5 & 5 storeys. The proposed development also includes a 2-storey crèche (c.630m²). Access to the development will by via one no. new vehicular access point from the Boherboy Road, along with new vehicular connections to adjoining developments at Corbally Heath to the east and Carrigmore Green to the north. Ten no. houses in the south-eastern part of the site will be accessed from Corbally Glade to the east. The proposed development includes for pedestrian and cyclist connections throughout the proposed development and accesses into adjoining lands at Carrigmore Park, Corbally Heath and Corbally Glade to the east and Carrigmore Green to the north. Private amenity space for the residential units is provided in the form of rear gardens for houses and ground floor terraces / upper floor balconies for apartments and duplex units. The proposed development provides for a total of c.2.3Ha of public open space, and c.4,750sq.m of communal open space associated with proposed development. The proposed development also provides for (i) all associated site development works above and below ground, including surface water attenuation & an underground foul sewerage pumping station at the northern end of the site, (ii) public open spaces (c.2.3Ha), (iii) communal open spaces (c.4,750sq.m), (iv) hard & soft landscaping and boundary treatments, (v) surface car parking (861 no. car parking spaces), (vi) bicycle parking (711 no. bicycle parking spaces), (vii) bin & bicycle storage, (viii) diversion of all existing overhead ESB lines underground, (ix) public lighting, and (x), plant / PV panels (M&E), utility services & 8 no. ESB sub-stations, all on an overall application site area of c.18.7Hha. In accordance with the South Dublin County Development Plan (2022-2028), an area of c.1.03Ha within the site is reserved as a future school site.
Anthony Neville Homes Limited intends to apply for permission for development on lands located adjacent to Drury Mills and Drury Park, Swiftbrook, Saggart, Co. Dublin. The site is located within the curtilage of protected structures associated with the former Swiftbrook Mills (RPS refs. 314, 330 & 332) comprising chimney, storage building, millpond, tail-race, entrance gates and wall. The development will consist of a residential scheme of 73 no. units comprising a mix of 6 no. houses, 59 no. own-door duplexes and 8 no. apartments arranged in 4 blocks set around a central amenity space. The mix of units will consist of 5 no. 1-bedroom duplexes/apartments, 46 no. 2-bedroom duplexes/apartments, 16 no. 3-bedrooom duplexes and 6 no. 4-bedroom houses. The 4 no. blocks are labelled A to D on plans and consist of: Block A - a 3 to 4-storey terrace accommodating 18 no. duplex units with associated balconies & terraces; Block B - a 2-storey terrace accommodating 6 no. houses and 2 no. duplex units with associated gardens & terraces; Block C - a 3 to 4-storey terrace accommodating 27 no. duplex units with associated balconies & terraces; Block D - a 4-storey terrace accommodating 8 no. apartments and 12 no. duplex units with associated balconies & terraces. The development will include: New internal roads accessed from Drury Mills and Drury Park; 84 no. car parking spaces; Bicycle and bin stores and substation; Landscaped public and communal open spaces and boundary reatments; All associated site works and services.
Provision of public concert use at the Convention Centre.
Retention for a porta cabin with an area of c. 54sq.m; Retention for mobile home with an area of c. 54sq.m; Retention for installation of electronic gates with a width 10m; Retention for installation of hardstanding / cement yard with an area of c. 1,020sq.m.
Retention and change of use of one single storey detached 2.85m high home office unit to a self-contained living unit.
Permission to construct an extension to rear of dwelling to connect existing home office (22.6sq.m) to the main dwelling & all associated site development works.
The proposed development will consist of modifications to the elevational design and floor plan layout of the previously permitted 3 storey creche/ community centre building (approved under Reg. Ref. SD22A/0398) resulting in a reduction in overall floorspace from 1610sqm to 1596.8sqm. Revisions are proposed to the approved site layout plan including: removal of the pedestrian bridge and relocation of the external play space area from the open space located to the west of the stream to an outdoor deck play space adjacent (west) of the main building and an enclosed play space at ground floor level on the southern elevation. Permission is also sought for modifications to adjoining cycle track and set down car parking spaces; revised hard and soft landscaping, bin storage and cycle parking and all associated site and development works
Construction of a three storey creche and community centre facility of 1,610sq.m gross floor area with associated external play area; car & cycle parking, hard and soft landscaping, bin storage, a revised layout to the northern edge of Cuil Duin Avenue to accommodate access to the proposed development including amendments to the existing footpath and cycle track and provision of set down car parking spaces and all associated site and development works.
Land recontouring/infilling works on c.16,000sq.m. of a folio size of c.2.4ha (allowing buffers); volume of material to be placed on site is c.35,000m3 with an average fill level of c.3.5m above existing.
Land recontouring/infilling works on c 16,000sq.m of a folio size of c 2.4 ha (allowing buffers); the volume of material to be placed on the site is c 35,000sq.m with an average fill level of c 3.5m above existing - the material is clean, inert soil and stone from the Saggart Water Reservoir construction site located directly adjacent to the north of the proposed infill site; a small section of hedgerow (6m wide) will be required to be removed between Saggart Water Reservoir construction site and the proposed infill site to allow access for lorries and infill equipment onto the proposed infill site.
Conversion of existing attic space comprising of modification of existing roof structure; new access stairs and flat roof dormer to the rear.
A residential development comprising: 526 residential units and all associated site and development works as follows: - 274 3-bed 2 storey terraced units, 185 4-bed 2 and 3 storey terraced and end of terrace units, 67 2-bed apartment/duplex units (37 2-storey, 2 bed terraced duplexes, 18 1-storey 2 bed terraced apartments and 12 1 storey 2 bed end of terrace apartments). The development also provides for a district park (4.58 ha) and a neighbourhood park (0.71 ha) in accordance with the Fortunestown Local Area Plan 2012. Permission is also sought for 789 car parking spaces, bin storage areas, ESB substations and all associated site development and infrastructural works. Vehicular access to serve the proposed development will be provided via two new access points off Garter Lane and via a new signalised junction at the southeastern corner of the site to replace the existing roundabout off Fortunestown Lane. Provision is made for a future access to Bianconi Avenue. In addition, an interim local square is proposed within the subject site providing a direct pedestrian link from the proposed development to the Saggart Luas stop. Two direct pedestrian links are proposed between the subject site and the adjoining school sites permitted under Reg Ref No SD16A/0255 providing a direct link between the school and the proposed district park and a direct link from the west of the school site to the proposed residential development. Lands identified for future development are located along the southern boundary of the current application site adjacent to Fortunestown Lane/Saggart Luas Stop. These areas will be subject of a future planning application (Phase 2) and will include the final design and layout of the local square.
Construction of a 30 metre high communication structure carrying antennae and dishes with associated ground mounted equipment to share with other licensed operators within a 2.4 metre high palisade fence at existing Saggart 38kV substation site.
Change of use from aparthotel to restaurant, together with external signage and all associated site works.
Additional floor area of 82sq.m ground floor and 35sq.m first floor to allow reconfiguration of 4 double rooms to 8 single rooms, new ground floor storeroom and enclosing fire exit stairs; relocation of 8 car parking spaces to extended existing car park; all associated site works; proposed material finishes to match previously approved changes to previously granted permission SD20A/0153.
Permission for 609.5sq.m, 16-bed extension to existing Nursing Home which consists of new 443sq.m two storey 14 bedroom extension adjoining existing building to the west, new 64.3sq.m single storey 2 bedroom extension to south west wing of existing, new 102.2sq.m 2 storey extension of existing dining areas to the north, new garden lawns and walkway with hard landscaped areas to north west of site, 8 new car parking spaces to existing car park to east of site and all associated site works.
Conversion of Attic Space comprising of modification of existing roof structure, new gable window new access stairs, 2no roof windows to the front and flat roof dormer to the rear.
The installation of telecommunications equipment including no. 3 ballast mounted shrouded antennas, no. 1 ballast mounted dish, remote radio units (RRU's), cable trays, GPS, cabinet and all other associated site development works on the building rooftop to provide for high-speed wireless data and broadband services.
Construction of a 68sq.m single storey extension to the side and rear of two storey, semi-detached dwelling and all associated ancillary site development works.
Full planning permission for the following: (a) replacement of existing roof including raising ridge height over existing single storey detached dwelling house, (b) new single storey extension to side / rear of said existing dwelling house, (c) decommissioning and backfilling of existing sewage treatment system and replacement of same with a new on-site domestic wastewater treatment system, (d) modifications to existing window openings along front elevation, (e) internal modifications, connection to all other existing on-site services, landscaping and all associated development works at Sycamore Cottage, Blessington Road, Boherboy, Saggart, Co. Dublin. Eircode D24 XY46
Single storey and 2 storey extension to front of existing dwelling.
Construction of single storey extension to side of existing dwelling comprising 2no. bedrooms, office, playroom, living room, bathroom, and associated site works.
Single storey family flat side extension and all associated site works.
Demolition of existing single storey dwelling and the construction of 274 units on a 4.62 ha (net) site (density 60 units per hectare). It will comprise of 51 houses, 38 duplex units and 185 apartments. The height of the proposed scheme will range from two storey houses and three storey duplexes to 5 storey and part 8 storey apartment blocks. The proposed residential mix will comprise of: 17 2-bed houses, 27 3-bed houses and 7 4-bed houses, 2 1-bed duplex, 17 2-bed duplex and 19 3-bed duplex units, 62 1-bed apartments, 119 2-bed apartments and 4 3-bed apartments. A 4-classroom crèche of c. 276 sq.m and 2 substations are also included in the proposed development. 276 car parking spaces and 634 bicycle spaces are provided. A planted woodland berm will be developed along the northern boundary with the N7 to provide a sound barrier and amenity open space. There are a number of green spaces located in the centre of the site and on the south east and west of the site with natural play and SUDS elements as well as a large open communal space for the two apartment blocks to the south. Vehicle, pedestrian and cycle access to the site will be from the Mill Road. A new road will be constructed running east west at the southern boundary of the site. The residential element of the site will have two access points off the proposed new road. This new route will extend eastwards to provide cycling and pedestrian connections through neighbouring Citywest lands and to the Saggart LUAS light rail terminus. Secondary access is proposed at the north west of the site from an existing access road connecting to Mill Road. This access is designed as services and emergency only and will be controlled by collapsible bollards.
Single storey extension to side of existing bungalow and internal alterations comprising of 91sq.m to include new sitting room, bathroom and bedroom with en-suite.
Construction of single storey extension to the side and rear of existing dwelling comprising of bedroom c/w en-suite, open plan kitchen, dining, living space and utility room. Internal modifications and all associated site works.
Excavation of a basement level (54sq.m) and construction of an extension (151sq.m) to the eastern side of the existing house. The development will accommodate a home theatre at basement level, domestic swimming pool, sauna and gym at ground floor level increasing the area of the dwelling from 373sq.m to 578sq.m; 2 dormer windows at first floor level in lieu of 2 existing 'Velux' windows; internal reconfiguration of ground floor rooms to facilitate the internal connection to the side extension; elevational treatments; modification and replacement of first floor window on the south-west side elevation; upgrading the existing wastewater treatment system including provision of an Ecoflo polishing filter; hard and soft landscaping; changes in levels and all other works above and below ground.
1) REMOVAL OF EXISTING TEMPORARY STRUCTURE (LOG CABIN) AND 2) CONSTRUCTION OF A NEW DETACHED DWELLING TO THE REAR OF THE EXISTING DWELLING AND ALL ASSOCIATED SITE WORKS.
Permission for development on a site of 6.7ha. The proposed development will consist of the construction of a Photovoltaic Solar development to the North of the Citywest hotel on lands formally in use as a golf course [comprising a change of use from former golf course to solar development]. The proposed development will include the installation of solar photovoltaic (PV) panels on ground mounted frames/support structures, underground cabling and ducting, security fencing, CCTV cameras, temporary construction compound and an area of hardstanding for an electrical compound. The electrical compound will consist of two modified shipping containers, containing 3 inverters and LV Switch gear. This compound will also accommodate the Battery Energy Storage system, PV inverter and a transformer. The proposed development includes the above as well as drainage, landscaping, bio-diversity enhancement measures and all other associated site excavation, infrastructural and site development works above and below ground. While the proposed development relates to a total site area of 6.7ha, c.3.5ha of this constitutes the actual land take post development. The operational lifespan of the solar PV development will be 30 years. A Natura Impact statement (NIS) accompanies the planning application.
Land recontouring/infilling works on C. 38,000sq.m of a folio size of C.5.3HA (allowing buffers); the volume of material to be placed on the site C.91,000m3 with an average fill level of C.3.5m above existing.
Retention of an agricultural shed (measuring c.235 sqm in floor area, ridge height of 6.126 metres and eaves of 4.975 metres), yard and all associated site works.
Two storey side extension; 3 front facing 'Velux' windows and a rear facing dormer window.
The development will consist of Retention Permission sought for widening of entrances, Laying of hard standing over grassland plus permission for the construction of a storey and half dwelling plus a detached domestic garage. A domestic waste water system plus a surface water soakaway and all associated site works.
Retention Permission sought for widening of entrances, laying of hard standing over grassland plus permission for the construction of a storey and a half dwelling plus a dethatched domestic garage, a domestic waste water treatment system plus a surface water soakaway and all associated site works.
Erection of a three storey with front dormer, three bedroom detached dwelling in the side garden of existing dwelling with one pedestrian entrance and one vehicular entrance; creation of a new boundary wall between existing house and new dwelling to be known as No. 2A.
The development will consist of a cemetery including: 8,047 No. traditional burial plots; Columbarium walls; 1 single storey reception building (214.7m2 Gross Floor Area (GFA)) comprising a reception, 1 office, 1 reception store, WC, kitchenette with photovoltaic (PV) solar panels at roof level; and the provision of an ancillary maintenance shed, bin and battery storage structures; The development includes a new vehicular access road from Garters Lane to the N7 /M7 Naas Road, with 2 vehicular access points serving the proposed cemetery; 110 car parking spaces (25 spaces to the east of the reception building and 85 within overflow car park areas to the south of the development); 8 bicycle parking stands; and all associated hard and soft landscape and boundary treatment works including the reshaping of an existing lake and provision of a footbridge; provision of SUDS measures, associated lighting, associated signage, site services (foul and surface water drainage and water supply); and all other associated site excavation, infrastructural and site development works above and below ground.
The development will consist of internal alterations to the existing retail units to facilitate an amalgamation of the units into a single unit of approximately 234 sq.m and a change of use of the amalgamated unit from its permitted Retail use(s) (under planning Ref. SD03A/0857), to a Sports Facility (Gym).
Attic conversion for storage incorporating a dormer window to the front, a dormer window to the rear, and a new gable window to the side.
Attic conversion and dormer roof window on rear slope of roof at attic level.
New agricultural shed building; Upgrading existing agricultural entrance to accommodate new recessed entrance; Access roadway and all associated site development works.
Expansion of the floor plate of proposed creche/pre-school facility (area 370sq.m) to include adjoining storage space (32sq.m) with revised layout plan to that approved in ref. SHD3ABP-302398-18.
Planning permission and retention permission for a Large-scale Residential Development (LRD) consisting of amendments to a Strategic Housing Development (SHD) permitted under ABP Ref. 305556-19, as subsequently amended under SDCC Planning Ref’s SD22A/0299 and SD22A/0422 at a site at Citywest Shopping Centre, Fortunestown, Dublin 24. The proposed amendments for which permission is sought, include the following: (i) External alterations to Block F, comprising the relocation of a plant room door at ground floor level from the south elevation to the northern elevation along with the relocation of balconies at the eastern end of the building at 2nd to 6th floor levels together with a reconfiguration of the design of the balconies; (ii) Omission of 3 no. permitted on-street bin stores and replacement of same with a single consolidated bin store near the south-western corner of the shopping centre, together with a reconfiguration of hard / soft landscaping and on-street car parking spaces, resulting in the net loss of 1 no. on-street car parking space in this area; (iii) alterations to the design and configuration of the permitted single storey staircore structure leading to the basement level that is situated at the south-eastern corner of the shopping centre. The amendments for which retention permission is sought, include the following: (iv) Alterations to the permitted siting, design and size of the permitted ESB Substation and Switchroom at Block D together with the reconfiguration of hard / soft landscaping and on-street car parking spaces, resulting in the net gain of 1 no. on-street car parking space in this area; and (v) Internal and external alterations to the layout, design and configuration of the permitted single storey plant room and associated ESB substation / switch rooms at the south-eastern corner of the shopping centre, together with a slight re-siting of the reconfigured plantroom structure. In the interest of clarity, it should be noted that the proposed amendments and amendments to be retained will not result in any change to the total number of residential dwellings permitted on site, or the total number of on-street car parking spaces, as previously permitted. A dedicated website has been set up for this LRD application which can be viewed at: www. Carrigmorewoodsamendment1.ie
Amendments to the residential development permitted under An Bord Pleanála Reference ABP-305556-19 comprising of the omission of a permitted vehicular access ramp from ground to basement level of the existing Citywest Shopping Centre along the southern elevation; The permitted entrance to the ramp is proposed to be replaced at surface level with 5 car parking spaces, with associated amendments to the parking layout, pedestrian paths and landscaping in the immediate vicinity; An increase in the area of a permitted surface to basement level circulation core in the south-eastern corner of the existing Citywest Shopping Centre (to incorporate a lift and revised stairwell design), together with associated amendments to pedestrian paths and landscaping in the immediate vicinity; The relocation of permitted demountable bollards further eastwards along a permitted roadway to the south-east of the Citywest Shopping Centre; The enlargement of a permitted hammerhead circulation area to the south-east of the Citywest Shopping Centre and the provision of a standalone ESB Substation to the south-east of Block D; These amendments are provided to reprove the operational efficiency of the vehicle circulation and parking arrangement to service the permitted apartment buildings and to meet the requirements of ESB to serve the site.
The development will consist of amendments to the Strategic Housing Development permitted under An Bord Pleanála Reference TA065.305556. The proposed amendments comprise the provision of photovoltaic panels on the roofs of all 6 no. blocks, the provision of roof plant at Blocks A, B, C and D, the provision of an ESB substation at Block O that requires the relocation of no. 1 carparking space, and the reconfiguration of the ground floor of Block E to provide an enlarged plant room. These amendments are necessary to service the permitted blocks, improve the energy efficiency of the development, and to meet the requirements of ESB to serve the site. At Block A it is proposed to provide the following: 21 no. photovoltaic panels arranged in 3 no. rows; and a screen plant area accommodating an internal plant room of 13.24 sqm and an external plant area of 34.72 sqm surrounded. The proposed screened plant rises approx. 1 metre above the permitted lift overruns. At Block B it is proposed to provide the following: 21 no. photovoltaic panels arranged in 3 no. rows on the 5-storey section of the permitted building; a red brick internal plant room of 10.3 sqm on the 4-storey section of the building; and a screened external plant area of 29.2 sqm on the 4-storey section of the building. The proposed roof plant rises approx. 1 metre above the permitted lift over run. At Block C it is proposed to provide the following: 21 no. photovoltaic panels arranged in 3 no. rows on the 6-storey section of the permitted building; a red brick internal plant room of 10.3 sqm on the 5-storey section of the building; and a screened plant area of 32 sqm on the 5-storey section of the building. The proposed roof plant rises approx. 1 metre above the permitted lift over run. At Block D it is proposed to provide the following: 21 no. photovoltaic panels arranged in 3 no. rows; a screened with an internal plant room of 13.5 sqm and an external plant area of 24.33 sqm; a c. 3-metre-high red brick ESB substation with LV switch room to the southwest of the Block D, and the ancillary relocation of 1 no. car parking space. The proposed screened plant rises approx. 2 metre above the permitted parapet level. At Block E it is proposed to provide the following; 18 no. photovoltaic panels arranged in 3 no. rows; and the reconfiguration of the ground floor to replace 1 no permitted retail unit with an enlarged Plant Room (117.15 sqm}, ESB substation (13.6 sqm), a Generator Room (21.82 sqm}, and a Low Voltage (L V} switchroom (13.71 sqm}. These works require the removal of existing windows and doors at the permitted retail unit. At Block F it is proposed to provide 18 no. photovoltaic panels arranged in 2 no. rows. These, and all associated site works including landscaping at a site of 2.9 hectares.
Erection of linear arrays of solar photovoltaic panels on the roof of Unit 2007 together with 4 invertors 1.075m wide x 0.33m deep x 0.55m high together with all ancillary works. There will be 350 panels in all, each 1.34m x 2.28m in size, located on 3 of the 4 south facing sides of the roof area, all concealed from view behind the parapet walling. No panels are proposed on the 4 north facing elevations. The panels will provide sustainable energy to the premises with the surplus being fed into the grid. An additional means of escape is also proposed.
Amendment to Block D4 of the Strategic Housing Development permitted under ABP-310570-21. The proposed amendment to Block D4 is for a reduction in height to 9 storeys (from 13 storeys) and associated reduction in the number of units to 44 (from 60 units); Block D4 will have 4 one beds (no change), 34 two beds (down from 46) and 6 three beds (down from 10) all with associated private balconies/terraces to the north/south/east/west elevations; This will result in the reduction in the total number of residential units across the entire development site from 421 residential units to 405 residential units; Block D4 will also provide 564sq.m residential amenity space at ground floor level (an increase of 9sq.m); Minor amendments to the southern elevation are also proposed. The application includes for all site services required to facilitate the amendment to Block D4.
Changes of use within parts only of the existing building from storage and production to: (a) use of an area as a marketing suite/showroom (380sq.m ground floor together with an 80sq.m first floor mezzanine extension); (b) automotive academy and training area (925sq.m); (c) construction of additional ancillary office/welfare accommodation (467sq.m) at ground and first floor; (d) two storey briese soleil/sun shade structure to the south elevation; (e) additional windows and glazed screens on all elevations; (f) new single storey hand wash valet structure (146sq.m) on south elevation; (g) new wall mounted signage to west and south elevation; (h) 14 new car parking spaces (previously approved) and 25 new electric car charging points; (i) revisions to existing hard and soft landscaping to accommodate the development; (j) new ramped and stepped access with external terrace to form new entrance area with canopy at existing exit on west elevation; (k) existing 8 metre high water sprinkler tank to be replaced with 11 metre high water sprinkler tank. It is intended that the majority of the premises (6926sq.m) will continue in use for storage and distribution with ancillary office use continuing also.