Proposed single storey front extension incorporating an open porch to the existing 2 storey semi-detached dwelling, along with a single storey, flat roof rear extension, proposed internal alterations to the existing ground and first floors along with renovation works to an existing rear garden ancillary building to create an ancillary garden room with office area
Extension to rear.
Extension to rear.
The construction of a new single storey extension to the rear of existing truck and van test centre which will include the erection of a raised parapet and external cladding and external signage to the elevations and for all ancillary site works at Murphy's Truck Centre, Turnpike Road, Ballymount, Dublin 22.
Erect 1050sq.m of photovoltaic panels on the roof of existing warehouse unit with all associated site works.
Construction of new single story extension to side and front.
Replacement of existing asbestos roof covering with a new Kingspan insulated roof panels; replacement of rooflights with new and installation of a roof mounted solar photovoltaic panels to include all ancillary works and services.
Installation of a new canopy roof to the south side of the existing Heiton Steel warehouse and all associated site works.
Sub-division of existing site and construction of a new two storey dwelling; use of existing domestic side entrance; associated car parking; boundary wall to side forming boundary; all associated site works.
(i) Demolition of existing ancillary outbuildings and removal of front boundary treatment to Turnpike Road; (ii) alterations to existing single-storey cottage including demolition of existing front porch, partial demolition to the side/south of the original building, partial demolition of non-original rear extension and replacement of rear pitched roof with a flat roof; (iii) change of use of the cottage from residential to commercial use providing a reception area, coffee shop, multi-purpose studio, changing rooms and associated facilities; (iv) construction of 3 no. enclosed padel courts within 2 no. single-storey structures to the rear of existing cottage; (v) provision of 17 no. car parking spaces (including 1 no. accessible space), 15 no. bicycle parking spaces and refuse/storage facilities; (vi) provision of a new 6.0m wide vehicular entrance via Turnpike Road; and, (vii) all associated works, including new boundary treatments, landscaping, SuDS and drainage necessary to facilitate the development.'
Retention permission is sought for an external, timber framed, flat roof, covered seating area (15.8m²) to the rear garden at side.
Change of use of existing detached warehouse unit to vehicle service workshop including new internal works to from new staff canteen and toilet accommodation; new fire door exit doors; roller shutter door to existing elevations and attached illuminated building signage.
Retention of retention permission to retain the existing as constructed self-contained family flat to the side of existing house and all associated site works.
Conversion of existing attic space comprising of modification of existing roof structure, raising of existing gable c/w window, new access stairs, 2no. roof windows to the front and flat roof dormer to the rear.
Change of use of two community hall meeting rooms - to be used as Montessori classrooms with separate access and the use of kitchen, storage and WC facilities for the same.
The development shall consist of retention of Collect and Go Coffee Dock, together with associated services and signage.
First floor extension over existing ground floor welfare facilities including changes to the elevations; erection of new cladding to the front (north east) elevation and part of the side (north west) elevation including for all associated signage and for alterations to the roof line of the existing porch at the main reception area; erection of 6.65m high totem signage structure located adjacent to the Turnpike road and for a 2.25m high totem signage structure located adjacent to the main reception entrance and for the erection of 3 x 6m high flag poles along the Turnpike Road; and for all ancillary site works.
(a) the construction of a two storey mezzanine floor structure, (b) the installation of a new escape door to the rear elevation, and (c) all associated site works.
Demolition of attached garage and construction of a new one and a half storey dwelling; connection to main sewer and connection to all associated services.
Conversion and extension of the existing garage structure and construction of a new link to the existing single-storey four-bedroom house, to provide a single-storey one-bedroom family flat with kitchen/ living area and outdoor area; construct an additional pedestrian gate in the existing garden wall, to install photovoltaic solar panels to the roof of the house and to complete some ancillary site, landscaping, and drainage works.
2 new signs at site entrance featuring company logo; 5 new signs on building facade featuring company logo and name; 2 Totem signs featuring company logo and opening times etc; all associated site works.
Erect 775.46sq.m or 289.80 kWp of photovoltaic panels on the roof of storage building with all associated site works.
Demolition of existing extension and construction of single storey extension and dormer to the rear of existing dwelling and Velux rooflights to front of existing dwelling
First floor pitched roof extension over existing ground floor consisting of 3 bedrooms with a dormer window to front and side roof; 4 roof lights to side roof; extension to porch at ground floor level to front of dwelling.
Attic conversion with raised gable; dormer and single storey extension to the rear; side window with new gable; Two 'Velux' windows to the front.
Retention permission of change of use from light industrial to coffee shop/restaurant/takeaway with external seating area and associated signage, with internal modifications and associated site works.
Ground floor partial side/front extension and porch; ground floor internal alterations; partial raising of roof ridge height and build up of walls at front and rear to create attic conversion, with dormer roof windows on both side roofs, and window at attic level in front elevation.
Attic conversion for storage. With a raised gable to the side and dormer window to the front and the rear, a new gable window.
The construction of a ‘Build to Rent’ residential development comprising of 115 apartments (10 x studio units, 62 x 1-bed units, 38 x 2-bed units and 5 x 3-bed units) in 1 block, ranging in height from 2 storeys to 8 storeys over basement level with private balconies/terraces. The proposed development will also comprise of residential amenity facilities and services at ground floor level consisting of a gym, lounges, games room, conference room, meeting room, studio, concierge, bin store, and bike stores (140 spaces). A total of 48 car parking spaces at basement level with a drop-off/service lay by at ground level, 224 bicycle parking spaces across basement, ground floor and surface levels, landscaping including 1 communal roof terrace at 2nd floor level and a landscaped courtyard at ground floor level, public realm works including a new pedestrian path from the public open space at Monastery Gate to the north and along the southern site boundary with a pedestrian connection to Monastery Road to the south, public lighting, boundary treatments 2 no. ESB substations at ground floor level, plant at basement and roof levels and all associated site development and infrastructure works including foul and surface water drainage, necessary to facilitate the development. Vehicular access to the site is from Monastery Road (via the existing access road to the IBIS Hotel) with pedestrian access from Monastery Road and Monastery Gate. The development also provides for all associated site clearance works.
Erect 728.41sq.m of photovoltaic panels on the roof of existing building with all associated site works.
Revision to existing permission (SD24B/0505W) Ground floor partial side/front with porch, rear extension, partial raising of roof ridge height and build-up of walls at front and rear to create attic conversion, (revised larger size) with dormer roof windows on both side roofs, and window at attic level in front & rear elevation, new home office/store to rear garden, internal modifications and associated site works.
Ground floor partial side/front with porch, rear extension, partial raising of roof ridge height and build up of walls at front and rear to create attic conversion, with dormer roof windows on both side roofs, and window at attic level in front elevation. internal modifications and associated site works.
Replace condition 4 (stating a limit of 15 children) Ref. SD03A/0384 with a new limit of 32 children in sessional care in compliance with current ratios of floor area to number of children as set out in the childcare act 1991 (Early Years Service) Regulations 2016.
A porch extension to front of existing, a single storey ground floor extension to rear of existing house, 2 bedrooms at proposed 1st floor Level, with windows to front and rear with dormer windows to sides with opaque glazing roofing with standing seam with black metal finish.
The construction of single storey rear extension, construction of first floor side extension, internal modifications, front elevation window modifications, chimney removal and all associated works
Erection of a perimeter steel fence to match existing fence as erected on neighbouring property 2.5m high and the installation of a new electronically controlled entrance gate set back approx. 13m from road side 2.1m high.
A self-storage facility (for a temporary period of three years) comprising 40 no. 20 foot long shipping containers (14 sq.m. each)
To construct a new industrial building (412 msq) for maintenance of plant and machinery, with incorporated staff facilities, offices, meeting rooms and reception area along with a new connection to public sewers along with all associated services
Conversion of existing attic space comprising of modification of existing roof structure, new gable window, new access stairs, 3no. roof windows to the side and 2no. flat roof dormers to the side.
Attic conversion for storage. With a raised gable to the side and dormer window to the front and the rear, a new gable window, First-floor extension to the rear.
Installation of roof mounted solar panels over an existing Waste Transfer/Recycling building and all associated site works and services; the proposed development relates to an activity covered by an existing Waste Licence issued by the Environmental Protection Agency.
New rear dormer structure at attic level and conversion of the attic space to habitable space with ensuite
Permission for the proposed green energy initiative development consisting of the installation of Photovoltaic Panels on the existing roof structures together with all associated site works
Erect 1,063.05sq.m of photovoltaic panels on the roof of existing building with all associated site works.
Change of use of the second floor of the subject building to a Dental Practice comprising of 2 surgery rooms, offices, waiting room/reception, sterilisation room and toilets and ancillary site works.
Construction of new side dormer structure at attic level and conversion of the attic space to a bedroom and bathroom. The dormer structure allows for stair access and a functioning bedroom and bathroom with limited space available from the existing hipped roofed structure
The removal of existing roof finish to the side (southern) extension granted under SD13B/0233 and replacement of same with standing seam engineered roof covering
Demolition of an existing single storey office building (total area of 647.62m2, 4.38m high) ancillary to the existing crane hire business with this area returning to yard area.
Planning permission for the first floor side extension over the existing ground floor garage with associated integration to the existing dwelling, internal alterations and site works
Construction of 3 no. enterprise / light industrial / wholesale outlet units (Units A, B and C), including ancillary office / administration areas over two levels, with a total GFA of 1,576 sq.m. The proposal includes 25 no. car parking spaces (which includes 2 no. van parking spaces), 20 no. cycle spaces, a Unit Substation, signage zones for the units delivery / loading areas, landscaping, boundary treatments, lighting, PV panels, foul and surface water drainage and all associated development. The proposal forms an extension to the development permitted under Reg. Ref.: SD22A/0099 and includes vehicular and pedestrian access off the permitted internal access road to the immediate south of the proposed units. The application site is located to the north west of, and will be accessed from, the development permitted under Reg. Ref.: SD22A/0099 (to be known as Apex Hub), and is located to the southeast of Crosslands Business Park, Ballymount Road Lower.