Demolition of 29.5m2 loading bay and removal of 3 no. storage containers and ancillary 5 no. storage tanks with extension of 394m2 9.0m high warehouse extension with 2 no. roller shutters with internal layout changes for installation of new energy efficient and sustainable equipment to existing commercial laundry with 7 no. new car parking spaces, 24 no. new bicycle spaces in secure standalone shelter with new delivery and loading area covered with new canopy and revised internal vehicular routes while retaining existing entrances to Second Avenue with ancillary site and development works.
Demolition of the existing warehouse unit (1,632sq.m) and the construction of a new 5-6 storey building, accommodating 64 apartments, comprised of 20 1-bed apartments, 16 2-bed apartments, 8 3-bed apartments, 20 2-bed duplex apartments and 1 unit at ground floor level to be either retail or cafe. The proposed development also provides for a podium and an undercroft car parking area, at ground floor level, accommodating 37 car parking spaces, 167 bicycle parking spaces, bin storage, plant room and 2 ESB substations. Vehicular access to the development will be from the Cookstown Road. The development includes all private and communal open spaces, landscaping, boundary treatments, vehicular and pedestrian site access, bin storage, bike storage, signage and all associated site development works including service connections, foul and surface water drainage/attenuation and water supply/storage. On a total site area of approx. 0.28ha (0.7acres).
Roof dormer to the rear aspect of the roof and construction of a single storey 18sqm rear extension with flat roof.
28m of new secure metal fencing.
Demolition of existing fire damaged commercial unit and site clearance including all associated site works.
Amendments to previously granted permission (SD20A/0017) comprising of alterations to façade; installation of roof lights and PV panels.
Renovation and modifications to the original building including a change of use to office, training and distribution centre; proposed changes to the existing internal layout; internal fire stair location moved; extended mezzanine area, additional new toilets; external windows and modifications to the roller door on the rear elevation; new signage to the front elevation and all ancillary works.
Proposed ground floor rear extension for use as family flat
Roof dormer to the rear of aspect of the roof and the retention of the widened vehicular access.
Change of use from permitted retail use to retail use including the sale of alcohol for consumption off the premises (i.e., off licence use) within the overall permitted retail unit, where the floor area for the off licence use is 10.sq.m and is ancillary to the primary retail use.
The development will consist of the provision of a new glazed entrance lobby (24sqm) at the existing west entrance to the Square Shopping Centre (Level 3) and all associated site and development works.
We, Palm grey Limited, intend to apply for development at Crough's Pub, Cookstown Road, Tallaght, Dublin 24. The development will consists of the change of use and refurbishment of the 2nd floor existing staff accommodation to proposed 2 No. 2 Bed Apartments.
Increase the floor area of existing staff accommodation and plant room by 218sq.m on the second floor; provision of 2 additional floors to provide 9 apartments, 6 one bed units and 3 two bed units resulting in a five storey building over basement; new lift and lobby area to the rear to service all five floors; new pedestrian entrance to the eastern boundary and provision of 11 bicycle parking spaces and bin store; all ancillary works necessary to facilitate the development.
Ground floor side extension with pedestrian access door, pitched roof over and 1 roof light over.
A 68.6sqm internal extension to the existing first floor, alterations to front elevation to include new sliding doors and change of use of the entire building from motor sales workshops to funeral home support services.
Retemtiomn of change of use from retail to food takeaway.
Provision of 2 double sided projecting signs to the northern elevation at the existing mall entrance.
Subdivision of the existing retail department store (Unit 116 - 5,396sq.m. - formerly Debenhams) to comprise 2 retail units - 116A (2,431sq.m) and 116B (2,270sq.m) and new service corridor (176sq.m) to the rear of the proposed unit 116B to provide access to the existing service yard; associated modifications including the removal of the existing mezzanine floor within Unit 116 (497sq.m); creation of new retail frontage within the internal mall and associated signage; revisions to existing retail Unit 117 (113sq.m) and 118 (102sq.m) to form a single amalgamated unit (169sq.m) and creation of additional mall floor space (47sq.m) arising from the unit reconfiguration; all associated site and development works including minor revisions to the layout of the existing service yard.
The development consists the installation of 2no. new water tanks and an associated enclosure to the north of the existing office building, the relocation of a previously granted bicycle shelter under planning reference SD21A/0123, from the east of the site to the south-west, and all associated site works at PM Group, Kearney House, Belgard Square, Dublin, D24 XFW2.
1 no. 6.25m wide x 2.5m high internally illuminated sign to be mounted on existing front (east-facing) elevation of B&Q premises.
Construction of additional floor area of 192.43sqm to existing warehouse and office building of 1658.44sqm, alterations to layout of 152.11sqm of existing warehouse and alterations to existing parking layout to accommodate disabled parking. New first floor of 169.75sqm internally in existing warehouse, internal alterations at ground level, 2 storey extension to southern elevation of existing warehouse to accommodate new entrance lobby and all associated site works.
Works to the existing roof including installation of 173sq.m of solar pv panels; the erection of a new guardrail on the existing parapet to the perimeter of the roof; alteration to a portion of the existing roof from a pitched roof to a flat roof, installation of roof access hatches and all associated site development works.
Material alteration to a single school wing consisting of the installation of an external insulation with rendered finish to the junior school wing and the installation of an external biomass boiler unit to the north elevation / creche wing as part of the pathfinder 2022 energy upgrade programme.
Retention of timber log cabin in back garden to rear and side of house, for use as office, gym, play room/games room and storage area along with ancillary works
Alterations to existing external service area to the north eastern side of The Square Shopping Centre at the entrance to the existing service yard comprising of construction of an external plant area (c.135sq.m) enclosed by 2.4 metre high galvanised fencing to accommodate an Air Handling Unit (AHU) and a Chiller Unit ancillary to the shopping centre; new flat roof boiler room building (c.34sq.m gross floor area) within the proposed new enclosed plant enclosure; installation of a metal frame (2.4 metres wide x 1 metre high and located 2-3 metres above the ground supported by metal stilts) to facilitate the connection of the Air Handling Unit and Chiller within the plant area to the covered service yard area; replacement of mesh panels on existing wall on the western and norther side of the service yard with metal louvered panels; all associated site and development works.
3 signs (1m metre high x 4.5 metres wide aluminium back panels with individual raised illuminated lettering) on the existing tower feature on the western elevation of The Square; 1 sign (1.2m meter high x 6.1 metres wide aluminium back panel with individual raised illuminated lettering) positioned externally on the southern elevation of The Square (south eastern corner).
Revisions to previously permitted internal modifications as approved under Ref. SD18A/0399 resulting in the reductions in the kiosk zone at Level 2 only by 196sq.m (from 1073sq.m to 877sq.m) to accommodate a new partially enclosed restaurant/café unit (196sq.m) and associated setting; the new restaurant and seating area will correspond with the footprint of the existing Units 260/262 and 263 and will contain associated facilities including a kitchen, front and rear counters, condiment unit, dining tables, chairs, booths and benches; associated signage and development works.
The development will consist of internal reconfiguration and amalgamation of 4no. existing Level 2 retail units (U238, U239, U240 and U241) to provide two retail units (U238: 516sqm and U240: 1282sqm) and ancillary circulation and general store rooms (c.274sqm) resulting in no overall increase in gross floorspace. Permission is also sought for all associated site and development works and reuse of existing signage zones.
Retention permission, of the dormer to the rear aspect of the roof, a velux rooflight to the front aspect of the roof, and planning permission for an extension to the front of the dwelling, comprising a porch, and a bay window, with standing seam zinc roof and wall finishes to match existing.
Sliding steel entrance gate to the main entrance; partial demolition of a section of existing boundary wall; construction of new site entrance piers and the extension of the existing perimeter railings to meet the new piers; 2 new bicycle shelters and all associated site development works.
Roof dormer to the rear aspect of the roof and retention of the 'Velux' rooflight to the front aspect of the roof.
Extension to the side at first floor level only comprising a staircase from the rear first floor bedroom to attic level; the enclosure to the stairs to be 1m wide external with off-white T&G effect cedral cladding finish.
Provision of a roof dormer to the rear of aspect of the roof.
Two storey 44sq.m extension to the rear accommodating a ground floor kitchen extension and new first floor bedroom with roof to be pitched; wall and roof finishes to match existing dwelling.
Retain the amalgamation of both units for single occupancy and external alterations comprising of removal of external timber panel doors and replacement with PVC double glazed doors, removal of an external window and replacement of same with a double leaf door, installation of external signage and installation of external security shutters to windows and doors.
The Development will consist of the installation of 1,611 msq solar photovoltaic Panels to various rooftops of the existing building at Blenders, Whitestown Road, Tallaght, Dublin 24, D24VY75
Blenders intend to apply for Retention Permission and Permission for development on lands at Blenders, Whitestown, Tallaght, Dublin 24, D24 VY75. The development for which retention permission is sought consists of minor works arising from deviations to the permitted finished goods warehouse associated with SD23A/0277 as follows: 1.Single storey office, staircase and utility rooms (1 no. panel room and 1 no. fire hose reel pump room) to the north-west of the finished goods warehouse with roof plant over. 2. Standalone bicycle shed to the north east corner of the site. 3. Widening of the internal road in the southwest corner of the site to accommodate additional HGV staging spaces. 4. Relocation of pedestrian walkway to the front of car parking spaces to the north-west of the site. 5. Associated lighting, landscaping, retaining gabion wall and drainage arrangements. Planning permission is sought for: • alterations to the existing entrance to the south of the site in order to prevent HGVs striking the ground surface on entry/exit along with replacement gates and fencing. •new landscaping (including additional planting) •omission of permitted sprinkler tank and meter room from that permitted under SD23A/0277 All associated site works.
Construction of a finished goods warehouse (including freezer room) at the south side of the existing Blenders manufacturing facility. The proposed extension will have a gross floor area of 3,900 sq.m and a maximum height of 20.5m. Also, ancillary works including: PV panels to new proposed warehouse roofs, 3 no. additional loading dock levellers, Relocation of existing carparking (no change in numbers) including provision of 4 no. EV charging spaces and 2 no. accessible parking spaces, 35 no. cycle parking spaces., New HGV staging area to accommodate 4 trucks., Construction of new sprinkler tank (10m high) and pump room (3m high) to the south west of the site along with retaining wall., Provision of internal connections to the main Blenders building., Fire escape door to western elevation of main Blenders building. All associated site works including landscaping, drainage infrastructure and a new path to east of site.
Demolition of Shed to rear, construction of 1 detached 3bed 2 story house with 2 storey bay to front, 3 rooflights to rear, new vehicular access & car parking in front garden and all associated site works
Demolition of all existing 1-3 storey industrial/commercial structures on the site (c. 5,500 sq.m). Construction of a 1-4 storey Transitional Care Facility (c.11,747 sq.m.) providing therapy and treatment space and a pharmacy and general practitioners space at ground floor level and 171 no. bedspaces at 1st to 3rd floor levels. 2 no. internal landscaped areas are provided at ground floor level (c.440 sq.m) and 2 no. outdoor amenity areas are provided at 1st floor level (c.483 sq.m). Provision of a coffee dock area, hairdresser, comms rooms, toilets, staff changing facilities, kitchen area, laundry rooms, lobbies/reception areas, admin areas, storage spaces, staff canteen, LV switch room, mains/ sprinkler tank room/ boiler room, multipurpose rooms, dining rooms, meeting and office rooms, sluice rooms, nurses stations, ancillary refuse storage area, ancillary generator, ancillary ESB substation and switch room associated with the operation of the facility throughout. Provision of Stair/lifts, photovoltaic panels, mechanical plant and green/blue roofs associated with the operation of the facility throughout. Partial provision of the pocket park identified in the Tallaght LAP (c.1,500 sq.m). Provision for the relocation and upgrade of the existing vehicular and pedestrian access point along First Avenue for servicing and staff parking and relocation and upgrade of the existing vehicular and pedestrian site access point along Cookstown Road. Provision of signage on the southern, eastern and northern facades of the proposed building and associated totem signage. All associated site development works above and below ground, services provision, connection to water supply and foul and surface water networks on First Avenue and Cookstown Road including partial diversion of the foul line to the north east of the site at First Avenue, attenuation/bioretention systems, provision of internal roads and footpaths, tree removal, bicycle storage (60 no. total spaces), staff and visitor car parking (55 no. total spaces) and 3 no. set down/ loading bays.
Demolition of all existing 1-3 storey industrial/commercial structures and small cafe on site totalling c.5,500sq.m in area; construction of a 1-5 storey nursing home/step-down facility (131 bedspaces) over partial basement (total floor area c.6,743sq.m) with central courtyard (c.519sqm); construction of a deck-access apartment development comprising 139 residential units arranged in 2 blocks (Block A - 8 storeys and Block B - 5 to 6 storeys) with a total floor area of c.10,556sq.m excluding deck access (c.1,141sq.m); 2 commercial units comprising a cafe and pharmacy located at ground floor level facing Cookstown Road in residential Block A ( c.292sq.m in area); the residential development consists of 67 one bed/two person units, 12 two bed / three person units and 60 two bed/4 person units with north, south, east and west facing balconies throughout and residents amenity area at ground floor level; central communal open space (c.1,272sq.m); the basement serving the nursing home consists of a sprinkler tank and pump rooms, tank room, plant room and workshop; provision of dining and kitchen areas, siting/family rooms, activity rooms, coffee dock, hair salon, oratory, lobbies/reception areas, ancillary offices and staff areas, stores, toilets, shower/changing facilities, ESB substation, generator, switch room, service yard and waste areas serving the nursing home; provision of an ESB substation, switchboards, waste areas, water tanks and generator serving Blocks A and B; lobbies, stair/lifts, photovoltaic panels and green roofs throughout; partial provision of the pocket park identified in the Tallaght LAP (c.1,165sq.m); new vehicular access from First Avenue and egress onto Cookstown Road via a one-way system through the subject site; entrance signage on the eastern elevation of the proposed nursing home; all associated site development works, services provision, connection to the water supply, foul and surface water networks on First Avenue and Cookstown Road including partial diversion of the foul line to the north east of the site at First Avenue, attenuation/bioretention systems, vehicular and pedestrian access including internal road and footpaths, public realm upgrade works, landscape and boundary treatment works, tree removal, bicycle storage (307 spaces), car parking (42 spaces), set-down parking spaces including 1 ambulance space serving the nursing home and delivery/loading areas to Cookstown Road and First Avenue.
Demolition of all existing 1-3 storey industrial / commercial structures and small café on site totalling c.5,500sqm in area; - Construction of a deck-access apartment development comprising 123 residential units arranged in 2 no. blocks (Block A 5 to 7 storeys and Block B 5 to 6 storeys) with a total floor area of c.9,806sqm including the proposed bike shelter (c.93sqm) and excluding deck access (c.901sqm); -Commercial floor space located at ground floor level facing Cookstown Road in Residential Block A (c.421sq.m); - The residential development consists of 58 no. 1 bed/2 person units, 12 no. 2 bed/3 person units and 53 no. 2 bed/4 person units with north, south, east and west facing balconies throughout and residents amenity area at ground floor level; -Central communal open space (c.1,303sq.m); -Provision of an ESB substation, switchboards, waste areas, water tanks and generator serving Blocks A and B; -Lobbies, stair/lifts, photovoltaic panels and green roofs throughout; -Partial provision of the pocket park identified in the Tallaght LAP (c.1,286sq.m); -New vehicular access from First Avenue and egress onto Cookstown Road via a one way system through the subject site; -All associated site development works, services provision, connection to the water supply, foul and surface water networks on First Avenue and Cookstown Road including partial diversion of the foul line to the north east of the site at First Avenue, temporary foul pump station. attenuation/bioretention systems, vehicular and pedestrian access including internal road and footpaths, pedestrian facilities/public realm upgrade works, landscape and boundary treatment works, tree removal, bicycle storage (302 no. total spaces) comprising 276 no. spaces (serving proposed mixed use development) and 26 no. spaces (serving concurrent transitional care facility application), car parking (32 no. total spaces) comprising 15 no. spaces (serving proposed mixed use development) and 17 no. spaces (serving concurrent transitional care facility application), 2 no loading bays (one each on First Avenue and Cookstown Road), 2 no. setdown/loading areas to the internal road and 1 no. ambulance setdown space serving the adjacent concurrent proposed Transitional Care Facility. The concurrent application has been made to South Dublin County Council regarding a 131 bed Transitional Care Facility on the western portion of the site (SDCC Ref SD22A/0361 refers) currently under appeal to An Bord Pleanála (ABP Ref 317394).
Demolition of all existing 1-3 storey industrial/commercial structures and small cafe on site totalling c.5,500sq.m in area; Construction of a 1-5 storey Transitional Care Facility (step-up/step-down) providing 131 bedspaces over partial basement (total floor area c.6,743sq.m) with central courtyard ( c.519sq.m ); The basement consists of a sprinkler tank and pump rooms, water tank room, plant room and workshop; Provision of dining and kitchen areas, siting/family rooms, activity rooms, coffee dock, hair salon, oratory, lobbies/reception areas, ancillary offices and staff areas, stores, toilets, shower/changing facilities, ESB substation, generator, switchroom, service yard and waste areas serving the facility; Lobbies, stair/lifts, photovoltaic panels and green roofs throughout; Partial provision of the pocket park identified in the Tallaght LAP (c.1,286sqm); New vehicular access from First Avenue and egress onto Cookstown Road via a one-way system through the subject site; Entrance signage on the eastern elevation of the proposed facility; All associated site development works, services provision, connection to the water supply, foul and surface water networks on First A venue and Cookstown Road including partial diversion of the foul line to the north east of the site at First A venue, temporary foul pump station, attenuation/bioretention systems, vehicular and pedestrian access including internal road and footpaths, interim pedestrian facilities/public realm upgrade works, landscape and boundary treatment works, tree removal, bicycle storage (76 total spaces), car parking (32 total spaces), set-down parking spaces, 1 ambulance set-down space serving the facility and delivery/loading areas to First A venue.
The development consists of the change of use of the ground floor unit from retails use to cafe/patisserie shop including the sale of hot and cold beverages. The following works are proposed: (1) Internal configuring of unit including fit out of unit to facilitate development with provision of serving counter, store, W/C and seating area at ground floor level internally and externally (2) Alterations to ground floor level facade including new glazed door and window, new awning to shopfront, new signage and projecting signage to front facade. (3) All associated site works and ancillary works at this address in accordance with plans as submitted
For the construction of first floor side extension over previously converted garage, construction of new dormer structure to the rear and conversion of attic space to home office and a games room. Works at first floor will consist of construction of bedroom with en-suite and associated works.
Construction of first floor side extension over previously converted garage. Works will consist of construction of bedroom with en-suite and associated works
On a site bound by Belgard Road (R113) to the east, Belgard Square North to the North, Belgard Square East to the west and Clarity House to the south, demolition of all existing structures on site (with a combined gross floor area of c. 3625sq.m); The construction of a mixed-use residential development set out in 3 blocks including a podium over a basement, ranging in height from 2 to 13 storeys (with core access above to roof terrace), comprising 334 residential units of which 118 will be Build to Rent (BTR) residential units, with associated amenities and facilities across the development; 4 retail/café/restaurant units and 3 commercial spaces associated with the 3 live-work units (723sq.m combined); Childcare facility (144sq.m); 670 bicycle parking spaces including 186 visitor spaces; 117 car parking spaces (including 6 disabled spaces) are provided at ground floor and basement level; Communal space in the form of residential courtyards and roof terraces; Public open space provision including Homezone/tertiary route along the south of the site between Belgard Rd and Belgard Square East; The overall development has a Gross Floor Area of 29,784 sq.m; Of the total 334 residential units proposed, unit types comprise Block A (Build-to-Rent), 91 one bed units; 1 two bed 3 person units; 26 two bed 4 person units; Blocks B & C, 2 live-work studio units; 102 one bed units; 12 two bed 3 person units; 88 two bed 4 person units including 5 duplex units; 1 two bed 4 person live-work unit; 11 three bed units; A portion of the proposed residential development is a 'Build to Rent' scheme in accordance with Specific Planning Policy 7 and 8 as set out in the 'Sustainable Urban Housing: Design Standards for New Apartments (December 2020); All associated works, plant, services, utilities, telecommunications infrastructure, PV panels and site hoarding during construction; A Natura Impact Statement has been prepared in respect of the proposed development and accompanies this application; The application contains a statement setting out how the proposal will be consistent with the objectives of the relevant development plan or local area plan; The application contains a statement indicating why permission should be granted for the proposed development, having regard to a consideration specified in Section 37(2)(b) of the Planning and Development Act, 2000, as amended, notwithstanding that the proposed development materially contravenes a relevant development plan or local area plan other than in relation to the zoning of the land.
Source EV Ireland Ltd. intends to apply for permission for development of an Electric Vehicle (EV) Charging Station at Belgard Retail Park, Belgard Road, Tallaght, Dublin 24, a site of ca. 0.035ha. The development will consist of 5 no. EV charging stations, each serving 2 no. vehicle charging bays, a total of 10 no. charging points. The charging bays will be located in the existing car park replacing 12 no. standard parking bays with 10 no. EV charging bays. The proposed development will utilise an existing, ancillary storage building to house an Medium Voltage (MV) switch room linked to an adjacent ESB substation to service the proposed development, the charging bays will utilise existing established access & egress and includes all other associated above and below ground ancillary works.
Three storey apartment building containing six apartments with external terraces/private gardens (3 x two bed & 3 x three bed duplex) & one end of terrace two storey house (two bed), landscaping of site and play area, footpath, bin stores, eight car parking spaces, eighteen bicycle parking spaces and all associated site works.
Mixed use commercial extension (9,956sq.m gross floor space) to the southern side of The Square Shopping Centre and a new public plaza and all associated site and development works including new signage; Level 1 - no changes; Level 2 - removal of southern mall entrance lobby and construction of new extension to existing Level 2 mall to include 6 retail units (2,611sq.m), a food hall/market hall area for multiple restaurant/food and beverage type uses with associated seating areas (2,041sq.m), a restaurant/cafe unit (67sq.m) and associated ancillary accommodation and circulation (1,534sq.m) and plant rooms (176sq.m) and introduction of new internal service corridor; Level 2 extension is replacing surface parking spaces (140) to the south of the shopping centre and an existing parking area (34 spaces) to the east of the proposed extension is to be reconfigured; creation of Level 3 entrance and creation of new public plaza to replace roof car park (111 spaces) and the new outdoor public plaza (0.74ha) will be used for multi-purpose events, civic and recreational uses and retail and food and beverage concessions involving temporary moveable structures erected on a seasonal basis; the creation of the new Level 3 entrance involves replacement of existing retail unit at Level 3 (Unit 307A) with mall area to include flexible kiosk type retail concession areas; 2 buildings accommodating 9 restaurant/bar units (3,324sq.m) and ancillary accommodation (175sq.m) and associated outdoor seating areas in the new plaza on south facing terraces; Level 4 - ancillary accommodation and service areas (28sq.m) on roof of 2 restaurants buildings within provision for screened plant areas and solar panels; the proposed extension has a maximum building height of 18 metres above existing ground levels; the extension is to replace and supersede the Plot B development previously permitted under Reg. Ref. SD13A/0192 (Bod Ref. PL06S.243280) which included a gross floor space of 5,684sq.m; the permitted northern extension (Plot A) remains unchanged. Permission is sought to amend Condition 3(a) of the Reg. Ref. SD13A/0132 (Bord Ref. PL06S.243280) to facilitate the construction of the proposed southern extension prior to the permitted northern extension (Plot A) subject to a phasing programme to be agreed.