Retention permission for existing first floor rear extension to existing two storey semi-detached house, retention of ground floor door as constructed (for access to rear garden) and all associated site works.
Demolition of existing single storey garage and construction of a one bedroom and study/storage room, two storey dwelling to side of existing dwelling; two new modified vehicular entrances with block pillars and timber gates proposed to front garden to provide parking space for existing dwelling and new proposed dwelling; provision of new boundary walls to front and rear of existing site and all ancillary site works.
Conversion of existing attic space comprising of modification of existing roof structure, raising of existing gable c/w window and 'Dutch' hip and new access stairs.
To convert attic space to storage space with dormer window to the north facing roof elevation and 1 rooflight to the front west facing roof elevation and 2 rooflights to the rear elevation.
Single storey extension to the side with pitched roof over and 2 roof windows. single storey extension to the rear with lean to roof over and 4 roof windows; front porch extension with apex roof; solar panel array to the rear roof profile; relocation of front driver pier; demolition of existing rear extension.
Attic conversion for storage, including two rooflights to the front roof slope, a dormer and one rooflight to the rear, and two new gable windows to the side.
Proposed 38m2 flat roof ancillary garden studio located to infill irregular space at rear (western side) of existing garden along with associated siteworks
Planning Permission sought for28.5 sqm single story side extension with pitched roofs, 3 no. velux roof lights, internal alterations to ground floor and all associated site works.
Construction of a 24 metre high free standing communications structure with associated antennae, communication dishes, ground equipment and all associated site development works forming part of Eircom Ltd. existing telecommunications and broadband network.
Alterations to the attic storage space to include two dormer roofs to the rear, Velux roof lights to the front, internal modifications and all associated site works
Conversion of existing attic space comprising of modification of existing roof structure; new access stairs; flat dormer roof to rear.
Retention of erection of 457sq.m of photovoltaic panels on the roof of existing building with all associated site works.
Construction of a fully serviced single storey, dormer-style detached house in the existing front garden; new boundary walls and separate vehicle entrance.; connection to County Council foul and surface water and all ancillary site works.
The development will consist of conversion of existing attic with dormer extension to the rear, also one new Velux roof window to the rear.
Construct dormer window to the front and rear of the existing property serving games room/domestic storage; conversion from hipped roof gable to straight roof gable and associated site works.
Single storey extension and new canopy to front/side of units 1 to 10. The proposal involves works within the curtilage of a protected structure. (Ballyowen Castle RPS Ref. No. 105).
Single storey extension to front/side of units 2 to 10 and change of use from Retail/Pharmacy to Doctors/Medical use to proposed extended Unit 10. The proposal involves works within the curtilage of a protected structure. (Ballyowen Castle RPS Ref. No. 105). Previous Granted Planning Ref. No. SD17A/0405
Erection of a single storey extension to the front and side.
Conversion of existing attic space comprising of modification of existing roof structure, new gable wall, new access stairs & flat roof dormer to the rear.
Planning permission for attic conversion with dormer to rear roof to accommodate stairs to allow conversion of attic as non-habitable storage space with roof window to rear roof all with associated ancillary works
The proposed development will consist of the temporary storage of inert soil and stone generated by construction and development activity and imported as waste under licence or as by-product (in accordance with Article 27 of the European Communities (Waste Directive) Regulations 2011 (as amended)) as a non-waste by-product on a 3.87-hectare site within the Clonburris North-West Development Area of the Clonburris Strategic Development Zone (SDZ) Planning Scheme 2019. The proposed development will include for: i. The provision of temporary soil and stone storage for later re-distribution and use within the Clonburris SDZ; ii. The proposed fill material will be stored in 2 no. stockpiles of c.90,000m3 and 18,000m3. iii. The proposed 2 no. stockpiles will provide for a combined c.108,000m3 of material to be stored on site and will be c.6m in height; iv. Vehicular and pedestrian access will be provided via approved access off the Fonthill Road (R113), which will also serve the Logistics Facility as approved under Reg. Ref. SDZ23A/0016. The proposed inert soil and stone stockpiles will be temporary in nature and will be operational for an anticipated 7-year time period. It will then be decommissioned, and the subject lands will be restored and developed in line with the Clonburris Strategic Development Zone Planning Scheme 2019.
The conversion of the existing attic space including new internal stairs and proposed flat roofed dormer to the rear of the property, 2 no. rooflights & solar panels to the roof at the front of the property, plus external insulation to the existing property, amendment to the existing window at the side gable, landscaping and all other ancillary site development works required to facilitate the development.
Conversion of existing attic space comprising of modification of existing roof structure, new gable window, new access stairs and flat roof dormer to the rear.
The development will consist of Converting the attic space to non-habitable home use, to include a dormer in the rear roof, a new gable window and stair access from the existing upper floor landing area
Conversion of existing attic space comprising of modification of existing roof structure, new gable window, new access stairs and flat roof dormer to the rear.
Conversion of existing attic space comprising of modification of existing roof structure, new gable window, new access stairs and flat roof dormer to the rear.
Conversion of his attic to storage including a dormer window to the rear, a dormer window to the front and a window to the side gable wall all at roof level
Planning permission for a 3 bedroom detached house, demolition of existing garage, extension to rear of existing house and all associated site development works.
Attic conversion to a non-habitable storage space with hip roof to gable to allow stairs access to attic with roof windows to front of existing house and frosted window to side gable all with ancillary works.
Retention planning permission for single storey extension to side
Conversion of existing attic space comprising of modification of existing roof structure, raising of existing gable c/w window, new access stairs and flat roof dormer to the rear.
Retention of single storey extension to front, side and rear of existing house, extension with new utility, bedroom and games/storage room; all associated site works.
Conversion of existing attic space comprising of modification of existing roof structure, new access stairs and flat roof dormer to the rear
Construction of flat roof first floor extension over existing ground floor extension to the rear of existing dwelling comprising of bedroom, new gable window and revised internal layout.
Construction of flat roof first floor extension over existing ground floor extension to the rear of existing dwelling extending the existing rear bedrooms. Conversion of existing attic space comprising of modification of existing roof structure, new access stairs, 3 no. roof windows to the front and flat roof dormer to the rear.
Conversion of existing attic space comprising of modification of existing roof structure, new gable window, new access stairs and flat roof dormer to the rear.
A single storey rear and side extension, minor internal alterations and all associated siteworks
Retention to change from part use of the house to the entire use of the house for a child care centre.
The development will consist of works located outside the Clonburris SDZ relating to the "Stage 2" roads, public parks/open space areas and services infrastructure works (as part of a separate concurrent application) in respect of the northern part of the overall Clonburris SDZ lands comprising: A) The construction/upgrade of an underground surface water pipe from Griffeen Avenue along Griffeen Road to connect to the existing surface water pipe along with the upgrade of existing surface water pipe along Griffeen Glen Drive and adjoining open space area (for c. 450m), which will connect ultimately to the Griffeen River. B) Junction upgrade and junction tie in works to existing road layout at Balgaddy Road and Grange Castle Road, C) Junction upgrade and junction tie in works to existing road layout at Thomas Omer Way/Ninth Lock Road, Fonthill Road (R113), including slip road to the north; D) Junction upgrade and junction tie in works to existing road layout at Ninth Lock Road/Neilstown Road. E) The proposals will also entail the restoration of the open space areas and road surfaces and all associated site development and associated landscape works.
Demolition of existing side garage; construction of a 2 storey extension to side of existing; ground floor front extension with pitched roof; ground floor rear extension with flat roof and all ancillary site works.
Construction of a temporary logistics and storage facility within the Clonburris NorthWest Development Area of the Clonburris Strategic Development Zone (SDZ) Planning Scheme 2019. The facility includes the provision of a logistics facility comprising a warehouse (single story pitched roof c.11.356 meters in height) and adjoining unit (single storey pitched roof c. 6.22m in height) with a combined Gross Floor Area of 1,411sq.m; The provision of a single-storey ancillary office and staff facilities to include an office (25sq.m), canteen/ changing area (24.8sq.m), and WC (9sq.m); Vehicular and pedestrian access from the Fonthill Road (R113) to the east, 24 car-parking spaces, 5 HGV setdown parking spaces and turning/loading areas and 18 bicycle parking spaces; All ancillary site development works including attenuation, footpaths, lighting, landscaping boundary treatments and signage; The logistics facility will exist for a temporary period of up to 10 years to facilitate the delivery and storage of building materials throughout the construction phases of the development of the entire Clonburris Strategic Development Zone; The logistics facility will not be open to the general public; This application is being made in accordance with the Clonburris Strategic Development Zone Planning Scheme 2019 and relates to a proposed development within the Clonburris Strategic Development Planning Scheme Area, as defined by Statutory Instrument No. 604 of 2015 all on wider lands bounded generally by Thomas Omer Way (L 1059) to the north, the Dublin-Cork railway line to the south, the Fonthill Road (R 113) to the east and undeveloped lands to the west.
Conversion of existing attic space comprising of modification of existing roof structure, raising of existing gable c/w window and Dutch hip, new access stairs and roof window to rear, and new quattro roof window detail to the rear of the house serving attic space.
Single storey extension to rear and side of existing dwelling.
Single storey extension to rear and side of existing dwelling.
New brickwork boundary wall and gates including enlarged W.E.E.E. enclosure.
Detached gym and utility room with connection to all existing services.
Erect a 21 metre high multi user monopole with antennas, dishes and associated telecommunications equipment, all enclosed in security fencing.
Construction of a new two storey dwelling in the side of existing dwelling including two car park spaces at the front of new dwelling and all ancillary site works
The development will consist of works located inside the Clonburris SDZ relating to the Stage 2 roads, public parks/open space areas and services infrastructure works (as part of a separate concurrent application) as per the Clonburris SDZ Planning Scheme (2019) to facilitate the future development of the northern part of the overall SDZ comprising: A) The construction of c. 2.3km of a new Link Street Clonburris Northern Link Street (CNLS) and approximately 800m of side streets including ancillary cycle facilities, pedestrian crossings, traffic signals, footpaths, car parking (79 no. spaces) public lighting as well as services infrastructure (including ESB, Comms, gas main, trunk surface water sewer, and watermain) and ancillary works. B) Provision/upgrade of 12 signalised junctions (5 new and 7 upgraded) as follows: Junction 1: R136 & Adamstown Avenue/Thomas Omer Way, Junction 3: R113 & Thomas Omer Way / Ninth Lock Road, Junction 4: CNLS & R136, Junction 6: CNLS, Junction 8: CNLS & R113, Junction 9: CNLS/Neilstown Road & Ninth Lock, Junction 24: CNLS/Neilstown Road & Ninth Lock, Junction 28: R136 & Adamstown Avenue/Thomas Omer Way, Junction 2: CNLS & Thomas Omer Way, Junction 5: CNLS, Junction 7: CNLS, Junction 27: R136 & Adamstown Avenue/Thomas Omer Way along with minor priority-controlled junctions are proposed along the street alignment to provide access to existing development and future development cells within the Clonburris SDZ. C) Approximately 2 km of upgrade of existing streets, including minor priority-controlled junctions are proposed along the street alignment to provide access to existing development and future development cells within the Clonburris SDZ, including pedestrian crossings. D) Provision of 2 main public parks centrally (Na Cluainte Park North) c. 2.78 ha and in the eastern part of the subject lands (c. 0.77 ha) both to include open water attenuation areas. E) Drainage infrastructure works to include surface water attenuation areas, Sustainable Urban Drainage Systems (SUDs) as well as landscaped areas including attenuation ponds and the provision of underground attenuation. Provision of surface water drainage and waste supply trunk infrastructure within the proposed road corridors; wastewater infrastructure including a foul pumping station (known as pumping station no.3) and foul pipe network within proposed road corridors to facilitate drainage connections to future development within the SDZ lands. The easterly section of the development will collect surface water and discharge into an existing outfall situated within Moorfield Walk whereas the western surface water catchment will connect (as part of a separate concurrent application) to an existing surface water outfall on the Griffeen Road (and ultimately to an existing Griffeen River outfall). F) Provision of trunk watermain infrastructure within the CNLS as well as connections to the permitted watermain infrastructure as part of SDZ20A/0021. G) Permission is also sought for all ancillary site development and landscape works associated with the development, including hard and soft landscaping, (tree pits, boundary treatments, road marking, signage, enabling works and temporary construction works, (including site accommodation, site compounds, and temporary construction boundary fencing) as well as temporary project signage (at 6 no. locations) and provision of underground utility connections under the Dublin - Cork Railway line (at 3 no. locations) and Irish water diversions. This application is being made in accordance with the Clonburris Strategic Development Zone Planning Scheme 2019 and relates to a proposed development within the Clonburris Strategic Development Planning Scheme Area, as defined by Statutory Instrument No. 604 of 2015.
Construction of a new two storey dwelling in the side garden of existing dwelling including two car park spaces at the front of the new dwelling and the relocation of the front driveway to include two car park spaces for the existing dwelling, new boundary wall to separate both properties and all ancillary site works.