(i) Demolition of the existing industrial and commercial buildings (15,989sq.m); (ii) construction of a mixed-use development featuring: (a) 1104 'build-to-rent' apartments in 4 blocks varying in height from four to eleven storeys. Each apartment has associated private open space in the form of a ground floor terrace or a balcony and has access to internal communal amenity spaces (totalling 2741sqm) and 5,107sqm of external communal amenity space at ground, first floor and roof levels; and (b) 4 commercial units at ground floor level of Blocks B and D (comprising of 2 in Block B accommodating a cafe/restaurant/bar; 1 in Block D accommodating Class 1, 2 and 8 uses as per the Planning and Development Regulations, 2001-2019, as amended; and 1 in Block D to serve the Circle K Belgard petrol station which is to be retained), 1,500sqm of office space across first to sixth floor levels of Block D and a crèche with external play area at ground floor level of Block C. The development is served by a total of 351 parking spaces (including 17 limited mobility parking spaces and 16 car share spaces) and 1860 bicycle spaces (1464 resident spaces and 396 visitor spaces); (iii) road, junction and streetscape upgrade works along First Avenue, Cookstown Road and Old Belgard Road, including the installation a signalised junction at the intersection of First Avenue and Cookstown Road and Old Belgard Road and Cookstown Road; (iv) construction of 3 new roads and 1 pedestrian/cycle link to the Belgard Luas Stop; (v) construction of a 1,688sqm landscaped public plaza with an outdoor flexible events space in the south-western corner of the site; and (vi) associated site and infrastructural works are also proposed which include: foul and surface water drainage; attenuation tanks; lighting; landscaping; boundary fences; plant areas; ESB substations; internal hard landscaping, including footpaths and street furniture; and all associated site development works. Any person may, within the period of 5 weeks beginning on the date of receipt by An Bord Pleanála of the application and on payment of the prescribed fee of €20 (except for certain prescribed bodies), make a submission or observations in writing to An Bord Pleanála, 64 Marlborough Street, Dublin 1 or online at www.pleanala.ie. Any enquiries relating to the application process should be directed to the Strategic Housing Development Section of An Bord Pleanála (Tel. 01-8588100).
The construction of a two storey, mixed use, development consisting of a public house at ground floor level with a gross floor area of 359sqms. The public house includes internal bin storage and other ancillary rooms. The construction of 4 residential apartments (Gross floor area 374sqms) at first floor consisting of 2no. one bed units; 1no. two bed unit; and, 1no. 3 bed unit. All apartments have private space in the form of balconies with a common area at first floor for access to each apartment with access to this common area off the internal entrance lobby; internal, residential, bike storage room and bin storage room at ground floor level. The proposed development includes communal amenity spaces located to the west of the block and at first floor level; parking of 8 spaces including 1 no mobility space, 2 electric vehicle spaces and is accessed via a new vehicle entrance from the Old Belgard Road. New boundary treatments proposed along with a drop off area and wider soft and hard landscaping including a plaza area which ties into the public footpath on the Old Belgard Road; external bike parking areas within these external spaces; and, a connecting footpath to the established local centre to the north. Associated mechanical plant, PV panels at roof level, groundworks, landscaping, drainage including SUDS measures, lighting, engineering and ancillary works necessary to facilitate the development.
1. Construction of a two storey side extension with a gable ended roof to consist of a living room, WC and utility at ground floor and master bedroom with a walk-in wardrobe and a bathroom on the first floor. 2. Modifications to the existing side boundary wall for provision of a new pedestrian access exiting onto Kingswood Heights Grove. 3. Modifications to the existing front and side walls boundary treatments for provision of a new vehicular access including dished public footpath exiting on The Grove, Kingswood Heights. General remodel and partial upgrade of the existing dwelling to suit the proposed layouts. 5. All drainage, structural and associated site works to be implemented.
The development shall consist of retention of Collect and Go Coffee Dock, together with associated services and signage.
Change of use of two community hall meeting rooms - to be used as Montessori classrooms with separate access and the use of kitchen, storage and WC facilities for the same.
Construction of a 6.4sq.m full width single storey extension to the front of dwelling.
Retention permission for alterations to existing buildings to include, over cladding of brick facade at ground floor level, blocking up of roller shutter doors and over cladding of same and new fire escape doors at Building 1, Units 1a, 1b, 1c, Cookstown Estate Road. Removal of dormant fire escape stairs, over cladding of facade, blocking up of roller shutter doors and over cladding of same and new fire escape doors at Buildings 81a and 81b, Cookstown Estate Road. Demolition of car wash annex building and over cladding of facade at Buildings 2 & 3, at Old Belgard Rd.
Permission to change the use of Unit 3 of Block 2, from retail to a medical practice as well as permission for associated signage area and all associated works to complete the development.
First floor pitched roof extension over existing ground floor consisting of 3 bedrooms with a dormer window to front and side roof; 4 roof lights to side roof; extension to porch at ground floor level to front of dwelling.
Conversion of existing attic space comprising of modification of existing roof structure, new gable window, new access stairs, 3no. roof windows to the side and 2no. flat roof dormers to the side.
Change the use of Unit 1 of Block 3 to a veterinary clinic as well as permission for signage areas. Retention of a new entrance door on Block 3; sub-division of Unit 1, Block 2, in to two units (1a and 1b) and the change of use to a barber (Unit 1a) and takeaway (Unit 1b); new signage zones; all associated works to complete the development.
Ground floor partial side/front extension and porch; ground floor internal alterations; partial raising of roof ridge height and build up of walls at front and rear to create attic conversion, with dormer roof windows on both side roofs, and window at attic level in front elevation.
Retention permission is sought for an external, timber framed, flat roof, covered seating area (15.8m²) to the rear garden at side.
Change the use of Unit 3 of Block 3 from retail to office space (155sq.m gross floor area excluding shared lobby of 34sq.m); signage zones related to the office use; all associated works to complete the development; signage zones located on the fascias of the ground floor retail Unit 2 and two internally illuminated, projecting pharmacy 'cross' signs, for a pharmacy which will be operating from the ground floor retail unit (Unit 2) of Block 3; all associated works to complete the development.
Retention permission for development at 26 Tamarisk Park, Kilnamanagh, Dublin 24. The proposed development will consist of a single floor rear extension (34.4sqm) with 5 new rooflights and internal associated works for Living & Laundry room (15.7sqm) with WC (2.7 sqm) and bedroom (11.7sqm) with EN-Suite.
Change of use of premises from offices and showrooms to health club and for sign on south façade of building.
New rear dormer structure at attic level and conversion of the attic space to habitable space with ensuite
Construction of new side dormer structure at attic level and conversion of the attic space to a bedroom and bathroom. The dormer structure allows for stair access and a functioning bedroom and bathroom with limited space available from the existing hipped roofed structure
Alterations to the existing front facade of the existing industrial unit inclusive of external finishes; Proposed facade feature, new windows and new front door; Proposed internal alterations to existing floor plans; Alterations to existing parking lot to include 12 proposed parking spaces inclusive of 1 disabled parking and 2 EV charging point; Proposed new signage and freestanding signage to vehicular entrance inclusive of all associated siteworks.
Conversion and extension of the existing garage structure and construction of a new link to the existing single-storey four-bedroom house, to provide a single-storey one-bedroom family flat with kitchen/ living area and outdoor area; construct an additional pedestrian gate in the existing garden wall, to install photovoltaic solar panels to the roof of the house and to complete some ancillary site, landscaping, and drainage works.
The development will consist of: 1. The change of use of part of the first floor from retail to gym use within a unit with a gross floor area of circa 790sqms; 2. Alterations to ground floor lobby entrance and steps; and 3. The installation of temporary wheelchair access ramp to the lobby entrance along the centre's eastern elevation. 4. Planning permission for a 24 hour gym; 5. Erect two new external signs, including manifestations to first floor windows. 6. Installation of bicycle parking.
Extension, Change of Use and alterations to Kilnamanagh Shopping Centre; A two storey extension is proposed along the centre's eastern elevation (total GFA increase of 2,336sq.m); Change of Use of the first-floor retail area (last used by Dunnes Stores as textile sales space) which will be extended and subdivided to provide for two new non-retail, service units; Unit 1 will extend to c.1,411sq.m for use as a health centre and Unit 2 will extend to 790sq.m for use as a gym; Removal of condition 3 of PA Ref: SD06a/0095 to allow for the increased net sales area to allow for the increase in net comparison sales space at ground floor level; New entrance ramp and steps at the north of the extension; The southern lobby entrance into Dunnes Stores will be demolished and replaced with a new glazed lobby entrance; New walkway canopy generally on the north and south elevations; New ramped access next to existing pedestrian entrance steps on Mayberry Road; Reconfigure existing entrance to Treepark Road including revised parking layout generally around the east side of the building to allow for an adjusted, one-way, system around the centre; Car parking, as a result of the extension, will be reduced; Four electric vehicle parking spaces; Covered cycle parking; New enclosed service yard wall and gates to existing service area on the west side of the centre; New signage (including illumination) proposed to elevations including two Totem signs; Recladding on elevations. Additional landscaping treatment generally around the east side of the centre arising from the amendments to the car park. Landscaping works and all drainage works including SUDS measures; All other ancillary works to facilitate the development.
Sub-division of existing site and construction of a new two storey dwelling; use of existing domestic side entrance; associated car parking; boundary wall to side forming boundary; all associated site works.
Demolition of the existing industrial and commercial office buildings totalling c.4,628sqm; Construction of a Build-to-Rent Housing Development comprising 170 apartment units and crèche arranged in 2 blocks across 4-7 storeys over basement car park (total gross floor area c.13,880sq.m excluding basement); The residential development consists of: 9 x1 bedroom studio apartments; 94 x1 bedroom/2 person apartments; 2 x2 bedroom/3 person apartments; 34 x2 bedroom/4 person apartments; 24 x2 bedroom/4 person duplex apartments and 7 x3 bedroom/5 person apartments with north, south, east and west facing terraces/balconies throughout; Internal communal amenity spaces at ground and fourth floor levels comprising reception, gym, lounge, cinema/tv room, events rooms and ancillary areas; External communal open space including children's play areas and informal amenity spaces at ground floor level between Blocks A and B; Communal roof garden at fourth floor level - total external communal open space c.1,005sq.m; Public open space at ground floor level to the east and south of Block B totalling c.1095sq.m; 1 creche with associated outdoor play area at ground floor level; 73 car parking spaces comprising 64 basement spaces, 4 accessible parking spaces and 5 visitor spaces at surface level; 354 bicycle spaces comprising 264 resident spaces at basement level and 90 visitor spaces at ground floor level; Reconfiguration/removal of existing car parking to the north of the site and access road resulting in a total of 28 car spaces serving the adjoining site; All associated plant including heating centres, gas room, water storage room, break tank room, comms room and bin storage at basement level, ESB substation and switch room at ground level and circulation spaces and stair and lift cores throughout; Vehicular/pedestrian access to the east from Belgard Road. All existing vehicular entrances serving adjoining sites maintained. Fire/emergency and refuse vehicle access and pedestrian access to the south from Colbert's Fort; All associated site development and infrastructural works, services provision, foul and surface water drainage, extension to the foul network, access roads/footpaths, lighting, landscaping and boundary treatment works.
Demolition of the existing industrial and commercial office buildings totalling c.4,628sqm; Construction of a Build-to-Rent Housing Development comprising 170 apartment units and crèche arranged in 2 blocks across 4-7 storeys over basement car park (total gross floor area c.13,880sq.m excluding basement); The residential development consists of: 9 x1 bedroom studio apartments; 94 x1 bedroom/2 person apartments; 2 x2 bedroom/3 person apartments; 34 x2 bedroom/4 person apartments; 24 x2 bedroom/4 person duplex apartments and 7 x3 bedroom/5 person apartments with north, south, east and west facing terraces/balconies throughout; Internal communal amenity spaces at ground and fourth floor levels comprising reception, gym, lounge, cinema/tv room, events rooms and ancillary areas; External communal open space including children's play areas and informal amenity spaces at ground floor level between Blocks A and B; Communal roof garden at fourth floor level - total external communal open space c.1,005sq.m; Public open space at ground floor level to the east and south of Block B totalling c.1095sq.m; 1 creche with associated outdoor play area at ground floor level; 73 car parking spaces comprising 64 basement spaces, 4 accessible parking spaces and 5 visitor spaces at surface level; 354 bicycle spaces comprising 264 resident spaces at basement level and 90 visitor spaces at ground floor level; Reconfiguration/removal of existing car parking to the north of the site and access road resulting in a total of 28 car spaces serving the adjoining site; All associated plant including heating centres, gas room, water storage room, break tank room, comms room and bin storage at basement level, ESB substation and switch room at ground level and circulation spaces and stair and lift cores throughout; Vehicular/pedestrian access to the east from Belgard Road. All existing vehicular entrances serving adjoining sites maintained. Fire/emergency and refuse vehicle access and pedestrian access to the south from Colbert's Fort; All associated site development and infrastructural works, services provision, foul and surface water drainage, extension to the foul network, access roads/footpaths, lighting, landscaping and boundary treatment works. Any person may, within the period of 5 weeks beginning on the date of receipt by An Bord Pleanála of the application and on payment of the prescribed fee of €20 (except for certain prescribed bodies), make a submission or observations in writing to An Bord Pleanála, 64 Marlborough Street, Dublin 1 or online at www.pleanala.ie. Any enquiries relating to the application process should be directed to the Strategic Housing Development Section of An Bord Pleanála (Tel. 01-8588100).
Refurbishment and extension of the existing 3 storey building and a Change of Use of the existing building and site from a vacant addiction service facility to a National Ambulance facility. Demolition of a staircase and boiler room (40sq.m) and the removal of an external stair-core, entrance ramp and steps to the north of the building; and the provision of lateral and vertical extensions at ground, first and second floor levels principally comprising a single storey, two-bay ambulance garage, increasing the gross floor area of the building from 943sq.m to 1,420sq.m; the rationalisation of floor space in the existing building; the provision of an external canopy to shelter 14 No. emergency vehicles; the provision of a power washing station towards the south-western corner of the site; ancillary staff car-parking; cycle parking; revised elevational treatments; boundary treatments; hard and soft landscaping; and all associated works above and below ground.
Construction of new single story extension to side and front.
Proposed single storey front extension incorporating an open porch to the existing 2 storey semi-detached dwelling, along with a single storey, flat roof rear extension, proposed internal alterations to the existing ground and first floors along with renovation works to an existing rear garden ancillary building to create an ancillary garden room with office area
Permission for a new first floor extension with new roof and roof windows to shed at rear of site and all associated site works; Retention of all new shed walls at ground floor and first floor level only that are connected to existing shed at rear of site and all associated site works.
The retention permission of all new shed walls at ground & first floor level that are connected to existing shed at rear of site and roof of shed.
Change of use, and associated internal works, of part of the existing building (167 sq.m. approx.) from warehouse to part workshop/light industrial (89 sq.m. approx.) and part water sampling hub (78 sq.m. approx.) to facilitate the overall use of the building as an Uisce Éireann Operations Centre; the provision of a window and security shutter on the north eastern façade of the building; the provision of a wash bay and 4 No. materials bunkers in external yard area; 2 No. replacement vehicular gates; a new pedestrian gate; Uisce Éireann signage on front (southwest) elevation; external air handling unit on northwestern side of building; and associated site development and drainage works.
Erect 837sq.m for 150.3 KWP of photovoltaic panels on the roof, with all associated site works.
Construction of two new warehouse units (481 sqm each), namely unit 69A and 70A, with ancillary offices located to the north-west of the existing unit 70 and the north-west of the existing unit 69, the reconfiguration of twelve parking spaces to the front of each of the new warehouse units and associated site works.
Replace condition 4 (stating a limit of 15 children) Ref. SD03A/0384 with a new limit of 32 children in sessional care in compliance with current ratios of floor area to number of children as set out in the childcare act 1991 (Early Years Service) Regulations 2016.
The development will consist of converting the existing two bedroom detached single storey bungalow to a two storey three bedroom detached house and all associated site works, through the construction of a new additional first floor storey to the existing single storey house with a new pitched roof over, consisting of an attic conversion and rear roof dormer.
Retention of 3 first floor offices and a mezzanine floor for storage purposes; free standing detached steel framed; 7 bay open fronted shed at rear.
Front porch and pitched canopy at front and side. Retention of existing single storey extension at side.
An attic conversion to hobby room with alterations to the existing tiled hip roof, construction of a 'Dutch' style gable hip roof to the side and a new dormer roof extension and window to the rear, internal alterations to layout, new internal stairs, roof lights to the front & side and all associated site works.
Conversion of existing attic space comprising of modification of existing roof structure, raising of existing gable c/w window, new access stairs, 2no. roof windows to the front and flat roof dormer to the rear
Retention of retention permission to retain the existing as constructed self-contained family flat to the side of existing house and all associated site works.
Construction of a single storey extension to the rear and widen existing vehicular entrance.
Warehouse extension (circa 87sq.m) at rear.
Erect 224sq.m of photovoltaic panels on the roof of existing building with all associated site works.
Construction of a single storey (staff room) extension to the front (southeast) of the school (including a rooflight); construction of a single storey classroom extension to the rear (northwest) of the school; All associated elevational changes, internal alterations, site, landscaping and ancillary works.
Demolition of all existing 1-3 storey industrial/commercial structures and small cafe on site totalling c.5,500sq.m in area; Construction of a 1-5 storey Transitional Care Facility (step-up/step-down) providing 131 bedspaces over partial basement (total floor area c.6,743sq.m) with central courtyard ( c.519sq.m ); The basement consists of a sprinkler tank and pump rooms, water tank room, plant room and workshop; Provision of dining and kitchen areas, siting/family rooms, activity rooms, coffee dock, hair salon, oratory, lobbies/reception areas, ancillary offices and staff areas, stores, toilets, shower/changing facilities, ESB substation, generator, switchroom, service yard and waste areas serving the facility; Lobbies, stair/lifts, photovoltaic panels and green roofs throughout; Partial provision of the pocket park identified in the Tallaght LAP (c.1,286sqm); New vehicular access from First Avenue and egress onto Cookstown Road via a one-way system through the subject site; Entrance signage on the eastern elevation of the proposed facility; All associated site development works, services provision, connection to the water supply, foul and surface water networks on First A venue and Cookstown Road including partial diversion of the foul line to the north east of the site at First A venue, temporary foul pump station, attenuation/bioretention systems, vehicular and pedestrian access including internal road and footpaths, interim pedestrian facilities/public realm upgrade works, landscape and boundary treatment works, tree removal, bicycle storage (76 total spaces), car parking (32 total spaces), set-down parking spaces, 1 ambulance set-down space serving the facility and delivery/loading areas to First A venue.
Demolition of all existing 1-3 storey industrial / commercial structures and small café on site totalling c.5,500sqm in area; - Construction of a deck-access apartment development comprising 123 residential units arranged in 2 no. blocks (Block A 5 to 7 storeys and Block B 5 to 6 storeys) with a total floor area of c.9,806sqm including the proposed bike shelter (c.93sqm) and excluding deck access (c.901sqm); -Commercial floor space located at ground floor level facing Cookstown Road in Residential Block A (c.421sq.m); - The residential development consists of 58 no. 1 bed/2 person units, 12 no. 2 bed/3 person units and 53 no. 2 bed/4 person units with north, south, east and west facing balconies throughout and residents amenity area at ground floor level; -Central communal open space (c.1,303sq.m); -Provision of an ESB substation, switchboards, waste areas, water tanks and generator serving Blocks A and B; -Lobbies, stair/lifts, photovoltaic panels and green roofs throughout; -Partial provision of the pocket park identified in the Tallaght LAP (c.1,286sq.m); -New vehicular access from First Avenue and egress onto Cookstown Road via a one way system through the subject site; -All associated site development works, services provision, connection to the water supply, foul and surface water networks on First Avenue and Cookstown Road including partial diversion of the foul line to the north east of the site at First Avenue, temporary foul pump station. attenuation/bioretention systems, vehicular and pedestrian access including internal road and footpaths, pedestrian facilities/public realm upgrade works, landscape and boundary treatment works, tree removal, bicycle storage (302 no. total spaces) comprising 276 no. spaces (serving proposed mixed use development) and 26 no. spaces (serving concurrent transitional care facility application), car parking (32 no. total spaces) comprising 15 no. spaces (serving proposed mixed use development) and 17 no. spaces (serving concurrent transitional care facility application), 2 no loading bays (one each on First Avenue and Cookstown Road), 2 no. setdown/loading areas to the internal road and 1 no. ambulance setdown space serving the adjacent concurrent proposed Transitional Care Facility. The concurrent application has been made to South Dublin County Council regarding a 131 bed Transitional Care Facility on the western portion of the site (SDCC Ref SD22A/0361 refers) currently under appeal to An Bord Pleanála (ABP Ref 317394).
Conversion of existing attic space comprising of modification of existing roof structure, raising of existing gable c/w window, new access stairs, 2no. roof windows to the front and flat roof dormer to the rear.
Removal of existing ground floor porch structure and chimney to side elevation; construction of new single storey extension to the front and side elevations; construction of a new single storey extension to the rear elevation; construction of a new first floor extension to front elevation; alterations to existing first floor structure to allow for a revised pitched roof design with a roof light and rooflight to rear roof slope; installation of external insulation to existing dwelling and proposed new elements; all associated internal alterations, demolitions, site boundaries, landscaping, drainage and ancillary works.
Three storey apartment building containing six apartments with external terraces/private gardens (3 x two bed & 3 x three bed duplex) & one end of terrace two storey house (two bed), landscaping of site and play area, footpath, bin stores, eight car parking spaces, eighteen bicycle parking spaces and all associated site works.
Demolition of all existing 1-3 storey industrial/commercial structures and small cafe on site totalling c.5,500sq.m in area; construction of a 1-5 storey nursing home/step-down facility (131 bedspaces) over partial basement (total floor area c.6,743sq.m) with central courtyard (c.519sqm); construction of a deck-access apartment development comprising 139 residential units arranged in 2 blocks (Block A - 8 storeys and Block B - 5 to 6 storeys) with a total floor area of c.10,556sq.m excluding deck access (c.1,141sq.m); 2 commercial units comprising a cafe and pharmacy located at ground floor level facing Cookstown Road in residential Block A ( c.292sq.m in area); the residential development consists of 67 one bed/two person units, 12 two bed / three person units and 60 two bed/4 person units with north, south, east and west facing balconies throughout and residents amenity area at ground floor level; central communal open space (c.1,272sq.m); the basement serving the nursing home consists of a sprinkler tank and pump rooms, tank room, plant room and workshop; provision of dining and kitchen areas, siting/family rooms, activity rooms, coffee dock, hair salon, oratory, lobbies/reception areas, ancillary offices and staff areas, stores, toilets, shower/changing facilities, ESB substation, generator, switch room, service yard and waste areas serving the nursing home; provision of an ESB substation, switchboards, waste areas, water tanks and generator serving Blocks A and B; lobbies, stair/lifts, photovoltaic panels and green roofs throughout; partial provision of the pocket park identified in the Tallaght LAP (c.1,165sq.m); new vehicular access from First Avenue and egress onto Cookstown Road via a one-way system through the subject site; entrance signage on the eastern elevation of the proposed nursing home; all associated site development works, services provision, connection to the water supply, foul and surface water networks on First Avenue and Cookstown Road including partial diversion of the foul line to the north east of the site at First Avenue, attenuation/bioretention systems, vehicular and pedestrian access including internal road and footpaths, public realm upgrade works, landscape and boundary treatment works, tree removal, bicycle storage (307 spaces), car parking (42 spaces), set-down parking spaces including 1 ambulance space serving the nursing home and delivery/loading areas to Cookstown Road and First Avenue.