To construct an extension to the side of the existing dwelling house and elevational changes to the house along with all associated site works.
For the construction of a dwellinghouse and propriety waste treatment plant and to utilise existing entrance to access site and for PERMISSION for the demolition of existing agricultural building and all ancillary site works
For the Construction of a Dwellinghouse & Proprietary Waste Treatment Plant & to utilise existing entrance to access site & for permission for the demolition of existing agricultural building and all ancillary site works
For the construction of a replacement Dwelling House to replace existing habitable but substandard dwelling and RETAIN existing dwelling to be used as domestic store. Also PERMISSION for new wastewater treatment system and utilise existing entrance with improvements to same including ancillary site works
To (a)construct an extension to the existing dwelling to comprise of kitchen/dining/livingroom and playroom (b)To Refurbish existing dwelling to provide utility, pantry, bathroom and bedroom(c) To convert existing outbuildings to provide 3 No. bedrooms, en-suite, walk-in-wardrobe & bathroom. (d) to demolish existing extension to the rear of the dwelling (e) to install new wastewater treatment system including all associated site development works
For a revised dwelling house design as granted under planning reference P21/761
To construct a dwelling house including waste water treatment system and all ancillary site services and works
For a revised house design as granted under Planning Reference Number P21/761
For development which will consist of the construction of a dwelling house, garage, a proprietary waste water treatment system and ancillary site works
For development at Newmarket-on-Fergus Wastewater Treatment Plant in the townland of Boheraroan, Newmarket-on-Fergus, Co. Clare and an associated rising main traversing the townlands of Ballyconneely, Ballynacragga, Boheraroan, Dromoland, Latoon North, Latoon South, Manusmore, Newmarket and Rathfolan, County Clare. The development will compromise proposed works within the existing Newmarket-on-Fergus Wastewater Treatment Plant, including: a. 1 No. 7.8m high storm storage tank with minimum storage capacity of 516m3, measuring approximately 11m diameter. Between 3.6m - 5.0m will be above ground level, the remainder will be buried below ground level b. New below-ground discharge pumping station with associated below-ground valve chambers and wet well c. New 4.1m high tertiary treatment system (including 2 No. tertiary filter units and flocculation tank with a volume of 8m3) d. 2 No. 2.7m high chemical storage tanks (each with a volume of 7.5m3) e. Electrical control kiosk (6.4m L x 5.2m W x 2.5m H) f. Standby generator g. Diversion of the flows from the existing final effluent pump chamber via 110m of 300mm external diameter sewer to the new discharge pumping station. The proposed development will also include: h. Construction of approximately 4.4km of 400mm diameter outfall rising main from the proposed pumping station to the proposed outfall diffuser within the River Rine i. An outfall diffuser with three diffuser heads of 225mm diameter located within the River Rine foreshore j. All ancillary works site development works including site preparation works, hardstanding, site clearance, ground levelling and site drainage as required to facilitate the development. This application is accompanied by a Natura Impact Statement (NIS).
To retain the conversion of the attic to comprise of stairs, bedroom, study and bathroom with 3 roof windows to front and 3 roof windows to rear of dwelling as constructed including ancillary site works
For the change of use of residential Chalet No. 1 to medical G.P. Clinic together with associated alterations
For the construction of a Lean-to Covered Store adjacent to existing Garage & to utilise existing retaining walls at side and rear of garage to form same, including all ancillary site works
For development at Carrigoran Nursing Home, Newmarket-on-Fergus, Co Clare. The development will consist of 3 no. extensions to the existing Nursing Home to accommodate additional washroom, staff and storage facilities and all associated site works
For the Construction of a Dwelling House, Garage, wastewater treatment system and new entrance including ancillary site works
For the construction of a dwelling house, garage, wastewater treatment system and new entrance including ancillary site works
For the change of house design to that granted under planning reference number P21/1150 including ancillary site works
To construct a 30 metre multi-user lattice tower telecommunications structure carrying antenna an dishes enclosed within a 2.4 metre high palisade fence compound with associated ground equipment and associated site works including new access track
For a single dwelling house, garage, advanced wastewater treatment system along with ancillary site works
Of an existing telecommunications support structure (previously granted under Plan Ref No. 06/2782 and ABP Ref PL03.224539) together with associated equipment cabinets and fencing
To construct a two storey dwelling house, waste water treatment system and all ancillary and associated site and ground works
Of upper floor garage
For the Installation of a Modular Home to be used as Ancillary Living Accommodation with connection to existing wastewater treatment system including ancillary site works
For the construction of a slatted shed along with all necessary ancillary works
For the construction of an extension to existing dwelling house to comprise of Livingroom, two bedrooms and bathroom and also for PERMISSION to refurbish existing dwelling and convert existing bedroom to utility including ancillary site works
For development at Dromoland Castle and Estate, Dromoland, Newmarket-on-Fergus, Co. Clare (Dromoland Castle is a Protected Structure: RPS No. 278). The development consists of:- The demolition of existing golf maintenance shed and the renovation and conversion of the existing stables building from golf storage/maintenance to visitor accommodation to provide 13 no. rooms/ suites, including an integrated bat loft, removal of solar panels, alterations to roof and openings, including installation of new and replacement doors, windows, gates, rooflights, infill wall sections, internal alterations and associated landscape works. - The renovation and conversion of the existing ‘Gardener’s Cottage’ from staff accommodation to visitor accommodation, including removal of existing storage shed, removal of existing rear lean to extension and replacement with two storey extension, new storage shed, internal alterations to provide a 4 no. bedroom guest house, 1 no. car parking space and associated landscape works. - Alteration and extension of existing clubhouse building to provide an enhanced wellness area and associated facilities, including replacement and extension of external deck to rear (south) with single storey timber spa structure, single storey extension to front (north) elevation, together internal alterations. - Installation of 3 no. sauna huts on lake island accessed via existing bridge, including raised timber walkways and floating timber jetties with plunge pools; - The provision of a new formal staff car park to the south of the stables building to provide 61 no. spaces, including accessible and EV charging spaces; - The provision of new/formalised car park to serve Brian Boru Hall (event facilities) to provide 21 no. spaces, including accessible spaces; and - Alterations to the existing stables car park resulting in a reduction of 4 no. spaces (36 no. spaces remaining), including accessible spaces; and - The provision of new/ formalised car park to serve the club house/ wellness centre to provide 10 no. spaces, including an accessible space. The proposed development will also comprise all ancillary landscaping and boundary treatment works, bicycle parking, biodiversity enhancement measures, wayfinding/ signage, site services, site lighting, construction compound, and all other associated site excavation, infrastructural and site development works. The planning application includes a Natura Impact Statement
For the development which will consist of a new guest carpark including petrol interceptor, surface water attenuation tank, connection to existing surface water drainage system, carpark lighting and ancillary site works (The development is proposed within the curtilage of a protected structure Dromoland Castle, Dromoland)
For the construction of a Dwelling House, wastewater treatment system and new entrance including ancillary site works
For development at Dromoland Castle and Estate, (Dromoland Castle is a Protected Structure: RPS No. 278). The development will consist of: the demolition of the 20th century / non-original infill structures at the castle courtyard and the construction of a glazed roof structure (max height c.11m) to provide additional internal guest recreation / dining space for guests (c.300sqm additional floor area); Demolition of existing part one/part two element and the construction of a part three/part four storey extension to the existing 21st century castle's east wing to provide additional guest accommodation, resulting in the loss of 1 No. existing guest room and an additional 17 No. guest rooms, resulting in a net gain of 16 No. rooms within this part of the castle. Internal upgrades and reconfiguration to the castle's ground floor, resulting in a consolidated kitchen / back of house area and improved and extended guest dining and bar facilities, installation of new lift, alterations to ancillary facilities and loss of 3 No. existing guest bedrooms. Internal upgrades and reconfiguration at the castle's lower ground floor level, to provide additional bar space, kitchen facilities, the upgrade of existing spa areas together with the introduction of new wet spa facilities, all resulting in the loss of back of house space and 1 No. guest bedroom. Removal of existing deck and canopy and the extension of the existing clubhouse building through the reinstatement of the former orangery building to provide a guest restaurant / event space; Alteration and change of use of existing farm structures from agricultural to a golf maintenance facility and central delivery and procurement hub for the estate, including staff car parking to provide 11 No. spaces, including accessible spaces and EV charging spaces; and the provision of new / formalised car park to serve the Castle guests and Brian Boru Hall (event facilities) to provide 85 No. spaces, including accessible spaces and EV charging spaces. The proposed development will also comprise all ancillary landscaping and boundary treatment works, site services, wayfinding, site lighting, and all other associated site excavation, construction compound, infrastructural and site development works. The planning application includes a Natura Impact Statement
To construct a new dwelling house, private garage, site entrance, private wastewater treatment system and all associated site works and services
For development which will consist of the construction of a dwelling house, a proprietary waste water treatment system and ancillary site works
For development which will consist of the following, (1) The relocation and extension of the existing first level retail outlet into an existing enclosed courtyard (2) A new yoga-meditation at the lower floor level in the existing courtyard (3) Minor alterations to existing internal walls and layout (4) Ancillary site works (The development is proposed within the existing hotel complex a protected structure Dromoland Castle, Dromoland)
To make alterations to the existing dwelling house to include the following; a) construction of front porch and covered canopy area, b) elevational alterations, c) construction of standalone private garage and d) associated site works
To renovate and extend existing private dwelling house, construct detached garage and all associated site works
For development which will consist of alterations and an extension to the existing dwelling house including all ancillary site works
To construct dwelling house, septic tank, percolation area and new site entrance
For development which will consist of the construction of a dwelling house, garage, a proprietary waste water treatment system and ancillary site works
To upgrade an existing agricultural entrance to a Forest Road Bell mouth to facilitate timber harvesting, haulage operations and associated site works to existing forestry.
To construct an entrance, dwelling house, garage, waste-water treatment system and soil polishing filter together with all associated site development works and services
For the construction of bay window, sunroom, kitchen, dining room, study, and garage as built including ancillary site works
To construct a dwelling house, entrance, domestic garage, wastewater treatment system and soil polishing filter together with all associated site development works and services
To construct steel clad domestic garage to rear of existing dwelling including ancillary site works
To construct a new dwelling house and garage complete with a new entrance, wastewater treatment system and ancillary works
For the construction of a dwelling house, wastewater treatment system and new entrance including ancillary site works
For the construction of a single storey side extension to the existing dwelling house, including all associated site works
For development which will consist of the construction of a dwelling house, garage, a septic tank with percolation area and ancillary site works
To construct a single dwelling house, garage, advanced wastewater treatment system and ancillary site works
Of the garage attached to the dwelling, the storage sheds & all other site and ancillary works
For development, the development consists of the construction of a slatted unit and associated site works
For development which will provide for the upgrade of the Dromoland Castle Wastewater Treatment Plant and will comprise of: (1) the demolition of the existing above ground wastewater treatment plant tanks; (2) construction of a new inlet works on a raised platform; (3) construction of two new SBR streams to provide secondary treatment; (4) construction of new stormwater holding tanks and sludge storage tank; (5) Construction of a supernatant pumping station, (6) Installation of new control panel kiosk enclosure on a raised platform; (7) Installation of a new chemical dosing system; and (8) all ancillary site works. A Natura Impact Statement (NIS) has been prepared in respect of the proposed development