For amendments to planning permission 22/187 namely for amendments to the approved house design which shall now incorporate an ancillary family living unit to rear, including any changes to site layout and all associated works
To construct a dwelling, site entrance and boundary wall, install on-site effluent treatment including all associated site development works
To construct a dwelling, site entrance and boundary wall, install on-site effluent treatment system including all associated site development works
To renovate existing Erina canal Lock house and outbuilding, to include new roof, windows, doors and stabilisation of existing masonry walls
To Extend the Appropriate Period of Planning Permission for P16-540 for the construction of dwelling house, garage, WWT system, percolation area, entrance and all associated site works
For detached two storey dwelling, detached domestic garage, onsite wastewater treatment system and percolation area, bored well, new entrance together with all associated ancillary and incidental site works
To extend the appropriate Period of Planning Permission P15-834 to construct dwelling house, garage, waste water treatment system, percolation area, entrance and all associated site works
Of as-constructed waste water treatment system and raised bed polishing filter together with all associated ancillary and incidental works.
To upgrade and relocate waste water treatment system, percolation area and all associated site works
To RETAIN detached garage and 2 no detached domestic storage shed structures and associated site works
The proposed development, on an overall site of 3.58 hectares, will consist of: A co-located Battery Energy Storage System (BESS) Compound with associated internal access tracks; Access to the proposed BESS compound will be from the R466 local road and will consist of the use of an existing quarry entrance in the townland of Leitrim which will be upgraded as permitted as part of the Fahy Beg Wind Farm (under Clare County Council Ref: 23148 & ACP Ref 317227); Installation of grid code compliance equipment to facilitate an under-the-fence connection to the adjacent Fahy Beg 38kV substation. The grid code compliance equipment will include: Backup Generator, Neutral Earthing Resistor (NER), Auxiliary House Transformer, Marshalling Kiosks; 3 no. spare parts shipping containers (measuring 12.2 m (L) x 2.4 m (W) x 2.6 m (H)); and Associated ancillary development. Installation of 32 no. Battery Energy Storage Units comprising metal shipping containers housing batteries (measuring 6 m (L) x 2.4 m (W) and 2.9 m (H) each), and associated ancillary control and ventilation units; Installation of 8 no. Medium Voltage (MV) Inverter Stations comprising metal shipping containers housing the inverter, MV transformer, and an MV-LV room (measuring 6 m (L) x 2.4 m (W) and 2.9 m (H) each); Installation of 1 no. water storage tank (measuring 5.15 m (L) x 4.15 m(W) x 2.58 m (H)); Construction of 250m of new access tracks; Provision of a crane hardstanding area to facilitate lifting operations on site (280m2); Provision of 10 no. car parking spaces (8 no. standard parking spaces, and 2 no. accessible parking spaces); Reprofiling of the existing cut slope embankment with the erection of a gabion basket retaining wall measuring 75m in length and 2.5m in height, and construction of a reinforced fill slope embankment; Underground electrical and communications cabling; Security lighting, CCTV and communications mast; Provision of 150m of Sound reflective barriers; Security fencing and gates; Drainage system including on-site surface water attenuation ponds; Tree felling of 0.19 Ha (1,890m2) to facilitate required clearance for BESS compound, associated earthworks and drainage infrastructure; Removal of 109m of hedgerow to facilitate development of the BESS compound, and replanting of 109m at perimeter locations; and All associated ancillary site development and vegetation clearance works including landscaping and hedgerow reinstatement. The Applicant requests that the development be
To construct dwelling house, waste water treatment system, percolation area, entrance, RETENTION permission for as constructed shed and all associated site works
To construct an extension, garage, treatment plant and percolation area and all ancillary site works to existing dwelling and for permission to demolish existing shed to the front of the dwelling.
Of as constructed garden shed and glasshouse and also RETENTION permission for garage conversion to sitting room in dwelling house,
For the following works: construction of a new two storey dwelling with garage and packaged wastewater treatment system and soil polishing filter, new vehicular entrance and associated site boundaries and site development works
For the construction of three single storey detached houses, each with a single storey detached garage and a waste water treatment and disposal system, and all associated works, in accordance with the proposed master plan to complete and terminate the existing 'cluster' submitted with approved planning application, P09/743, to include extending the existing private road and footpaths, surfacing to match existing and providing additional street lighting
For a new dwelling, wastewater treatment system, polishing filter, entrance and all associated site works
For the construction of a detached single storey dwelling, detached domestic garage, new entrance, onsite wastewater treatment system, bored well, together with all associated ancillary and incidental site works
To convert existing garage to a one bed residential unit, construct new garage, re-locate and upgrade DWWT System and RETENTION permission for as constructed site boundaries to comply with Folio CE43994F and all associated site works
For the following development which will consist of planning for the construction of a detached dormer dwelling, detached domestic garage, new entrance and driveway, pumped wastewater treatment system and rising main located on ancillary lands, private bored well, and landscaping together with all associated ancillary site development works
To construct a slatted unit with an underground slurry storage tank for housing livestock
To construct dwelling house, garage, waste water treatment system, percolation area, entrance and all associated site works
For development of a wind farm in the townlands of Fahy Beg, Fahy More North, Ballymoloney, Ballyknavin (Ed O'Briensbridge), Balllyquin More, Woodpark and Leitrim, Co Clare together with the development of an underground grid connection cable to the national grid. The underground grid connection is located primarily within the public road within the townlands of Leitrim, Fahy More South, Ballybrack, Aharinaghmore, Tooreen (Ed Cloghera) Aharinaghbeg, Knockdonagh, Roo East, Blackwater, Rosmadda West, Parkroe, Lackyle (Ed Ballyglass) and Castlebank, Co Clare. Temporary accommodation works to facilitate the delivery of wind turbine components to the site will be required in the townland of Ardataggle, Co Clare. The development will consist of: Construction of 8 no. wind turbines with a blade tip height range from 169m to 176.5m, a hub height range from 102.5m to 110m and a rotor diameter range from 131m to 138m; Erection of 1 no. permanent meteorological mast to a height of 100m above ground level; Construction of 1 no. onsite 38kV electrical substation to ESB Networks (ESBN) specifications and associated compound including Welfare facilities, Electrical infrastructure, Parking, Wastewater holding tank, Rainwater harvesting tank, Security fencing and all associated infrastructure, services and site works including landscaping in the townland of Woodpark; Installation of medium voltage electrical and communication cabling underground between the proposed turbines and the proposed on-site substation and associated ancillary works; Construction of turbine foundations and crane pad hardstanding area; Construction of new site tracks and associated drainage infrastructure; Upgrading of existing tracks and associated drainage infrastructure where necessary; Access to the proposed wind farm site will be from the R466 local road and will consist of the use of an existing quarry entrance in the townland of Leitrim which will be upgraded, as well as the creation of 1 no. new permanent site entrance on the Fahymore local road in the townland of Ballyquin More, and the use of 1 no. existing field entrance which will be upgraded, in the townland of Ballymoloney. The site entrances shall be used for both construction and operation of the proposed wind farm; All associated drainage and sediment control; Installation of new watercourse and drain crossings; Reuse and upgrading of existing internal watercourse and drain crossings; 2 no. temporary construction site compounds and
Of and continued construction of a steel shed
For the following a) to RETAIN change of use of part of existing dwelling as playgroup / pre-school. b) To RETAIN minor elevational changes to existing dwelling including rooflights, conversion of attached garage to bedroom plus sunroom / porch to front of dwelling. c) To RETAIN additional entrance plus front boundary wall and detached domestic garage. And for PERMISSION to upgrade existing sewerage treatment system plus all ancillary site works
For development at the existing Ballyquin Quarry. The development will consist of: (i) The extraction of sand from an area of approximately 16.3 hectares within an overall site area of 97.5 hectares; (ii) The infill and restoration of existing and future quarry voids (38 hectares) using inert soil and stone waste (imported inert greenfield and non-greenfield soils and stone, and river dredge spoil) which will be a soil recovery facility and require a waste management licence or soil and stone by-product (i.e. essentially virgin soil or equivalent to virgin soil and stone, and river dredge spoil) which will be notified to the Environmental Protection Agency (EPA) as an Article 27 by-product; (iii) The upgrade of existing quarry infrastructure including site office, weigh bridge, wheelwash, and welfare facilities; (iv) Refuelling area and associated drainage works, comprising 1 No. concrete hardstand area, hydrocarbon interceptor, wetland, inspection chamber and soakaway; (v) 1 No. soil inspection shed (c.875q. m) for the inspection of soil material; (vi) Erection of washplant; (vii) Settlement ponds; (viii) Landscape berms and fencing; (ix) All associated ancillary works. Site access is via the existing entrance off the R466. An Environmental Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS) have been prepared in respect of the proposed development. Should the inert soil, stone and inert dredge spoil materials be deemed to be a waste, then a Waste Management Licence will be required under Part 5 of the Waste Management Act 1996 (as amended) and an application for a Waste Management Licence will be made to the EPA following a grant of planning permission for the proposed development.
The development will consist of construction of one new single storey dwelling house with wastewater treatment system, bored well, garage, entrance from public road and all associated works
To construct an extension on to existing dwelling to the front and rear of the dwelling and attic conversion, together with the construction of 4 dormers to the front roof, 2 dormers to the rear roof and a dormer and velux window on the roof of the rear extension, together with the construction of a garage to the rear of the dwelling to be used for storage, together with general landscaping and all associated works
Of dwelling and extensions as constructed to the front and rear of the dwelling as granted under planning ref P24/120. Together with general landscaping and all associated works
To block up existing combined agricultural / residential entrance and replace with a relocated combined agricultural / residential entrance along with all ancillary site works
To construct dwelling house, garage, waste water treatment system, percolation area, entrance and all associated site works
For the following a) demolition of existing substandard outbuilding b) improvement of existing vehicular entrance, c) the renovation of existing dwelling house to include replacement roof and repair of external walls, d) construction of a two storey extension to rear of existing house with a single storey link & single storey extension to the side, e) installation of an onsite waste water treatment system with polishing filter together with f) all associated site works
Of existing front boundary security fence and entrance gate and for PERMISSION to lower height of fence to 1.2m, remove existing double side entrance gates and replace with matching fencing and all associated site works
Of security fence and entrance gate on the front boundary of their dwelling and all associated site works
To construct a single dwelling house, garage and advanced wastewater treatment system along with ancillary site works
Of a single storey extension to front and rear of dwelling house, conversion of attic space to storage space, rooflights to rear elevation, detached shed/fuel store to rear of dwelling together with all associated ancillary and incidental site works
A 10-year planning permission for a solar array. The development will consist of c. 330,000 m2 of solar panels on ground mounted frames, 13 no. single storey control cabins with associated electrical transformer units and hardstand areas, 2 no. ring main units, underground cabling within the solar array site and within the R471 public road to connect solar array field parcels, security fencing, internal CCTV, access tracks (upgrade of existing and new), upgrade to 1 no. existing agricultural field entrance and creation of 2 no. new entrances on the R471 and 1 no. new entrance on the L70382, 2 no. temporary construction compounds (including site offices and welfare facilities), landscaping and all associated ancillary apparatus and development works. The proposed development provides for minor modifications to the solar array permitted under Clare County Council Reference P22/591 / An Bord Pleanála Reference ABP-316043-23. These modifications comprise the omission of 1 no. single storey control cabin and associated electrical transformer unit, omission of solar panels and access track, and reconfiguration of internal cabling. The solar array will connect to the national grid and will have an operational lifespan of 40 years. A Natura Impact Statement (NIS) has been prepared and will be submitted to the Planning Authority with the application
For development which consists of the construction of a roofed dungstead, loose house with meal store and associated site works
For the construction of a detached 2 storey dwelling, new entrance, bored well, onsite wastewater treatment system, connection to necessary services and all associated ancillary and site works
For the provision of a roofed structure for dry effluent storage (dugstead) and all associated site works
To construct beef shed with slatted tanks and all associated site works
For a new single story 3 bedroom house of 128sqm to replace the existing single story 3 bedroom house of 128sqm as defective blockwork has been found in the existing dwelling, compromising its structural integrity. Existing access to the public road is maintained in its current location.
For the construction of a dwelling house, garage, entrance, wastewater treatment system and all ancillary site works.
For the following: Single Storey Extension to side of existing dwelling, and associated site works
For development which will consist of a new single storey dwelling house and a new waste water treatment system and a new vehicular and pedestrian entrance onto the public road and all associated site works
For a single dwelling house, attached carport and garage, advanced wastewater treatment system along with ancillary site works
To construct dwelling house, connect to public services and all associated site works
To construct dwelling house, bored well, garage, waste water treatment system, percolation area, entrance and all associated site works
To erect a dwelling house, garage, entrance and install an effluent treatment system and percolation area and all associated site works.
To construct an extension to the existing warehouse along with ancillary site works