Change of roof profile from hip end profile to full gable end profile, to accommodate attic conversion with 2 Velux roof lights to rear; All associated wite works to rear.
Conversion of existing attic space comprising of modifications to existing roof structure, raising of existing gable c/w window and 'Dutch' hip, new access stairs and flat roof dormer to the rear.
Attic conversion to storage space to include the following: main hipped roof design changed to a gable style roof with a small 'Dutch' hip design, 5 roof lights incorporated on the main roof structure of the rear elevation, new gable wall constructed with matching materials to that of the main house.
New attic level dormer window to rear elevation; new ground floor living room bay window with pitched roof over to ground floor plus new window to gable at attic level.
The proposed primary school will extend to c3,355sq.m will be 2 storeys in height and will comprise 16 no. classrooms with an additional 2 classroom Special Educational Needs Unit; a General Purpose Hall and all ancillary teacher and pupil amenities and facilities. The proposed development also provides for hard and soft play areas, including 2 no. outdoor ball courts, bicycle parking, staff car parking, vehicle drop off and set down areas. Photovoltaic Panels (PV) are proposed on roofs in addition to EV Charging Points and a packaged Biomass heating plant. The proposed development also provides for all landscaping and boundary treatments and all associated site development works. Access to the site will be via a new junction and access road off Thomas Omer Way. The new access road will run south off Thomas Omer Way and then west into the site. The proposed access road Is in accordance with the Clonburris Strategic Development Zone (SDZ) Planning Scheme and incorporates public lighting, footpaths and cycle tracks. A further pedestrian / cycle only connection to Thomas Omer Way ls also proposed along the western green corridor, west of the proposed school building.
The installation of a 3.25 vent stack servicing the existing underground natural gas pressure reduction installation with all ancillary services and associated site works.
Conversion of existing attic space comprising of: Modification of existing roof structure: raising of existing gable c/w window: new access stairs and flat roof dormer to the rear: construction of 18.5m2 rear ground floor extension inclusive of roof windows, rear sliding door and all ancillary works.
The developments will consist of the construction of a pitched roofed, first floor extension to the rear and a flat roofed ground floor extension with roof windows and solar panels to the rear and side of the existing single family dwelling house for uses ancillary to the existing use. The developments will include internal alterations and changes to elevations including to door and window locations etc.
Removal of a portion of existing boundary wall; provision of new side gate and section of concrete footpath to facilitate access to part single storey and part two storey extension to side of existing dwelling housing a new bedroom, office, utility room, den and bathroom with rooflight to the rear of the two storey section and existing street sign affected by works relocated and all associated site works.
Conversion of existing attic space comprising of modification of existing roof structure, raising of existing gable c/w window and dutch hip, new access stairs, and flat roof dormer to the rear.
Conversion of existing attic space comprising of: modification of existing roof structure; raising of existing gable c/w window; new access stairs and flat roof dormer to the rear.
Single storey standalone extension to the rear and attic conversion with all associated site works.
Temporary single storey prefabricated building located on the existing school staff car park within the site, measuring a total of 855.3sq.m and will include 9 general classrooms, staff & pupil toilets, ancillary staff/multi-purpose room and circulation. It will also include minor temporary alterations to the existing hard and soft landscaping to accommodate the temporary accommodation. These prefabs will be used to facilitate the remediation works in the Phase 1 Griffeen Valley ETNS building and will be required for a period of 12 months from the date of commencement of the works on site.
Permission sought for a single storey extension to the side/rear and also a new pedestrian access gateway to the existing eastern boundary wall to the side onto the public footpath. All for 2 Moy Glas Wood Lucan, Co Dublin K78P5D2 for Caroline and Shane Belton
The installation of 3 roof top support platform poles to support telecommunications equipment including panal antennas, RRU's and transmission dishes together with associated exchange cabinets and all associated development there to provide mobile electronic communications services.
Installation of 3 pole/ballast structures on the rooftop carrying telecommunications equipment including antennas, RRUs and a dish, together with associated exchange cabinets and all associated site development works; the development will provide for wireless data and broadband services.
Construction of two storey extension to the side of existing dwelling comprising of family room and utility room at ground floor and bedroom at first floor.
Demolition of existing single storey dwelling, garage and sections of the north and east boundaries; Construction of a 3-storey building to accommodate 10 no. duplex apartments comprising 1 no. 1-bedroom unit, 4 no. 2-bedroom units and 5 no. 3-bedroom units, with associated terraces and balconies; New vehicular and pedestrian entrance from Newlands Road; 10 no. car parking spaces; Bicycle and bin stores; Landscaped communal and public open spaces and boundary treatments; All associated site works and services.
Installation of 6 telecommunications antenna together with supporting structures, RRU's equipment cabinet at roof top level to provide mobile electronic communications services and all associated site works.
A single storey extension to the rear of existing house.
To construct a two storey rear extension, kitchen extension ground floor, bedroom extension first floor, to our property and associated site works
Partial change of use of the ground floor of an existing dwelling to a childcare facility; proposed ground floor extension to form part of the childcare facility; new side entrance; proposed rear extension to the existing ground floor measuring 12sq.m; Internal alterations to include proposed accessible wc and minor demolition to accommodate new extension; all associated ancillary site works.
The development will consist of the partial change of use of the ground floor of an existing dwelling to a childcare facility and a proposed extension to the ground floor to form part of the childcare facility that will accommodate for early childhood care and education (ECCE) scheme. The development includes (A) a new side entrance to the proposed childcare facility, (B) a proposed rear extension to the existing ground floor measuring 12m2, (C) internal alterations to include a proposed accessible WC and minor demolition to accommodate for the new extension, (D) dishing of existing footpath to front of dwelling to accommodate greater vehicular access to site, (E) and all associated ancillary site works.
Conversion of existing attic space comprising of modification of existing roof structure; raise existing gable with Dutch hip c/w window; new access stairs and flat roof dormer to the rear.
Conversion of Existing Attic Space comprising of modification of existing roof Structure, Raising of existing gable c/w window and Dutch hip new access stairs and a flat roof dormer to the rear
Development comprising of new pitch roofed two storey extension to side incorporating new garage at ground floor level, and all associated site works.
Conversion of existing attic space comprising of modification of existing roof structure, raising of existing gable c/w window and dutch hip, new access stairs, 1 no. roof window to the front and flat roof dormer to the rear.
Conversion of existing attic space comprising of modification of existing roof structure, new gable wall, new access stairs & flat roof dormer to the rear.
Remove section of existing grass margin and replace with a concrete apron, install accessible kerb and erect a proposed new stainless steel and glass bus shelter, 5.2m x 1.85m x 2.8m high on the public footpath 21.0 metres east of existing bus stop pole with 2 no. LED illuminated advertising panels each of 2.0 square metre area.
Conversion of existing attic space comprising of modification of existing roof structure, raising of existing gable c/w window, new access stairs, flat roof dormer to the rear and installation of 2no. roof windows to the front
The erection of 1 no. single storey detached ancillary accommodation garden room (approx. 30.5m2 gross internal area) including associated site works in rear garden on overall site comprising 0.0167 hectares (circa 167 m2) approx.
The development will consist of works located inside the Clonburris SDZ relating to the Stage 2 roads, public parks/open space areas and services infrastructure works (as part of a separate concurrent application) as per the Clonburris SDZ Planning Scheme (2019) to facilitate the future development of the northern part of the overall SDZ comprising: A) The construction of c. 2.3km of a new Link Street Clonburris Northern Link Street (CNLS) and approximately 800m of side streets including ancillary cycle facilities, pedestrian crossings, traffic signals, footpaths, car parking (79 no. spaces) public lighting as well as services infrastructure (including ESB, Comms, gas main, trunk surface water sewer, and watermain) and ancillary works. B) Provision/upgrade of 12 signalised junctions (5 new and 7 upgraded) as follows: Junction 1: R136 & Adamstown Avenue/Thomas Omer Way, Junction 3: R113 & Thomas Omer Way / Ninth Lock Road, Junction 4: CNLS & R136, Junction 6: CNLS, Junction 8: CNLS & R113, Junction 9: CNLS/Neilstown Road & Ninth Lock, Junction 24: CNLS/Neilstown Road & Ninth Lock, Junction 28: R136 & Adamstown Avenue/Thomas Omer Way, Junction 2: CNLS & Thomas Omer Way, Junction 5: CNLS, Junction 7: CNLS, Junction 27: R136 & Adamstown Avenue/Thomas Omer Way along with minor priority-controlled junctions are proposed along the street alignment to provide access to existing development and future development cells within the Clonburris SDZ. C) Approximately 2 km of upgrade of existing streets, including minor priority-controlled junctions are proposed along the street alignment to provide access to existing development and future development cells within the Clonburris SDZ, including pedestrian crossings. D) Provision of 2 main public parks centrally (Na Cluainte Park North) c. 2.78 ha and in the eastern part of the subject lands (c. 0.77 ha) both to include open water attenuation areas. E) Drainage infrastructure works to include surface water attenuation areas, Sustainable Urban Drainage Systems (SUDs) as well as landscaped areas including attenuation ponds and the provision of underground attenuation. Provision of surface water drainage and waste supply trunk infrastructure within the proposed road corridors; wastewater infrastructure including a foul pumping station (known as pumping station no.3) and foul pipe network within proposed road corridors to facilitate drainage connections to future development within the SDZ lands. The easterly section of the development will collect surface water and discharge into an existing outfall situated within Moorfield Walk whereas the western surface water catchment will connect (as part of a separate concurrent application) to an existing surface water outfall on the Griffeen Road (and ultimately to an existing Griffeen River outfall). F) Provision of trunk watermain infrastructure within the CNLS as well as connections to the permitted watermain infrastructure as part of SDZ20A/0021. G) Permission is also sought for all ancillary site development and landscape works associated with the development, including hard and soft landscaping, (tree pits, boundary treatments, road marking, signage, enabling works and temporary construction works, (including site accommodation, site compounds, and temporary construction boundary fencing) as well as temporary project signage (at 6 no. locations) and provision of underground utility connections under the Dublin - Cork Railway line (at 3 no. locations) and Irish water diversions. This application is being made in accordance with the Clonburris Strategic Development Zone Planning Scheme 2019 and relates to a proposed development within the Clonburris Strategic Development Planning Scheme Area, as defined by Statutory Instrument No. 604 of 2015.
Kitchen Extension
Two storey extension to side including a garage conversion; attic conversion to habitable use with dormer windows to rear and a single storey extension to rear and ancillary works.
2 four bedroom, semi-detached dormer bungalows.
Conversion of existing attic space comprising of modification of existing roof structure; new access stairs and flat roof dormer to the rear.
Attic conversion for storage, including two rooflights to the front roof slope, a dormer and one rooflight to the rear, and two new gable windows to the side.
Conversion of existing attic to non-habitable space including raised gable to mini-hip, dormer to rear, window to side & velux to front of existing dwelling.
Planning Permission for a standalone extension to rear comprising of an office, activity room & storage including all associated siteworks
Construct new first floor bedroom extension over ground floor car port extension to south of existing dwelling.
2 storey extension to front/side/rear elevations to the south of existing dwelling; comprises of home office at ground floor level; bedroom with en-suite bathroom at first floor level and all associated site works.
Change of Use from Retail unit to unit for Day Care Centre Use.
Construction of a new two storey dwelling in the side garden of existing dwelling including two car park spaces at the front of the new dwelling and the relocation of the front driveway to include two car park spaces for the existing dwelling, new boundary wall to separate both properties and all ancillary site works.
Construction of a new two storey dwelling in the side of existing dwelling including two car park spaces at the front of new dwelling and all ancillary site works
Planning permission from the permitted class 2 (Professional Services) use to use as a medical surgery (Class 8)
Construction of single storey extension to rear and side of existing dwelling, and all associated siteworks.
Ground floor extension to side and rear of house.
Erection to side and rear of existing dwelling and associated site works.
A single storey extension to rear & side of existing dwelling, an attic conversion including change of roof profile from hip to gable, a dormer window to rear and a new window to side elevation at attic level.