Rehabilitation works to existing 'Purple Zone' staff car park to include resurfacing, lighting, road markings and signage, ducting for EV charging points, and all associated site works and ancillary development. No increase in parking capacity is proposed. It is proposed that staff parking will be facilitated within the northern section of the 'Express Red' long term car park (also known as the 'Express Green' car park), located to the east of the 'Purple Zone' staff car park in the townland of Cloghran, Co. Dublin, for the duration of the works.
Planning Permission for the following developments: 1. Construction of four aviation-related cargo handling units with ancillary office space: i. Unit 1: c.10,869.7 m² (including 940.9 m² office space) ii. Unit 2: c.9,151.3 m² (including 751.3 m² office space) iii. Unit 3: c.6,024.9 m² (including 497.7 m² office space) iv. Unit 4: c.8,577.7 m² (including 751.3 m² office space) The proposed units will have an overall combined total gross floor area (GFA) of c. 34,623.6 sq.m (alongside ancillary ESB substations, 4 no. security huts with a combined GFA of 30 sqm and pumphouses). The warehouses are c. 12m in height, with the office element being c. 3.3 m in height and located within a landscaped campus on a site of c. 10.7 Ha. 2. Provision of 390 car parking spaces, including 39 EV charging points, 19 accessible spaces, and 39 motorcycle bays. 3. Provision of 230 secure bicycle parking spaces, of which 100 are short stay spaces and 130 are sheltered long stay spaces. 4. Provision of approx. 77 truck parking spaces and 5 van spaces. 5. Hard and soft landscaping, new boundary treatments, including a c. 2m high System Wire Fence to site boundary. 6. Construction of new site entrance onto the R108. 7. Wastewater treatment plant and infiltration area for 250 PE. 8. All necessary site development and engineering and ancillary site works, including provision of ESB substations and switchrooms, sprinkler tanks and pumphouses, bin store and recycle store, lighting, signage, underground services, photovoltaic panel zones at roof level and sustainable drainage systems (SuDS). An Environmental Impact Assessment Report (EIAR) will be submitted to the Planning Authority with the planning application.
The temporary continuance of use of the existing 2,700 long-term car parking spaces. The existing 2,700 long-term car parking spaces are currently used for the same purpose under and in accordance with the existing temporary planning permission reg. ref. PL06F.PA0030 from An Bord Pleanála. Temporary permission is sought for a further period of 7 years from the date of expiry of the existing temporary planning permission PL06F.PA0030 from An Bord Pleanála (7th May 2021). The proposed development includes the continuance of use of all existing ancillary infrastructure and facilities, such as the access from the R132, existing internal circulation roads including bus turning circles, 4 no. bus shelters, 1 no. security hut, lighting, boundary fencing, ticket machines and barriers, CCTV cameras, internal car park signage, existing drainage network including existing surface water attenuation areas, and all existing landscaping. Add Info received 2nd October 2020.
The development will consist of: (i) A single-storey extension to the golf driving range reception building, the proposed extension shall be retail use ( golf equipment, clothes and accessories shop); (ii) Internal alterations to existing building; (iii) associated drainage and site works necessary to facilitate the development. AI received 26/05/25 ** CAI received 08/07/2025 ** SAI received 17/07/25
The development will consist of: (i) Construction of 2 no. covered golf range bays (block 1 containing 16 bays and block 2 containing 10 bays) and 1 no. open golf range bay (containing 10 bays); (ii) associated drainage and site works necessary to facilitate the development.
The development will consist of: (i) Construction of 8 no. open padel courts; (ii) provision of 30 no. car parking spaces; (iii) associated drainage and site works necessary to facilitate the developement. Additional Information Received 1st October 2025 Clarification of Additional Information Received 12th November 2025
Planning permission sought for a change of use from warehouse to vehicle sales outlet and ancillary siteworks for a period of five years. Additional Information Received 16/07/2025
Permission is sought for use of an existing timber structure located within the garden area to operate as a Dog Grooming Business.
The development consists of Retention Permission for replacement 'Park2Travel' signage to site office and entrance/exit canopy, 2 no. signs with external uplighting, 6 no. flagpoles, 2 no. totem signs with digital displays, 1 no. individually lettered 'Park2Travel' sign with external uplighting, and all associated site works necessary to facilitate the development. Additional Information Received 6/10/2025
The development will consist of the demolition of an existing unoccupied dwelling, together with all associated site works.
This development will consist of Planning Permission to extend to the side of existing unit to provide new attached additional storage building and all associated site works.
Retention planning permission is being sought for the incorporation of external loading bay, replacement of two roller doors with sectional doors, replacement of existing emergency escape doors and all ancillary works.
The development will consist of amendments to the previously approved hotel, granted under Reg. Ref. F24A/0904E / ACP Ref. 322594-25. The proposed amendments relate to revised elevations, including revised window configuration.
The proposed development will provide for a new standalone 5-storey over basement level hotel comprising 100 bedrooms, meeting rooms, licensed bar/restaurant, kitchen and ancillary services including, offices, staff room, and gym area, laundry, plant and refuse spaces; along with associated elevational signage. Permission is also sought for reconfiguration of the existing surface car parking on site (comprising a total of 130 no. car parking spaces, in lieu of the existing 223 no. spaces currently on site) to accommodate the proposed hotel; 38 no. bicycle parking spaces (26 spaces at basement level and 12 spaces at surface level), 2 no. motorcycle parking spaces at surface level; utilisation of existing entrance from the Swords Road; landscaping; boundary treatments; drainage works; and all associated site and infrastructural works necessary to facilitate the development. AI received 06/02/2025 CAI Rcvd 08/04/2025
NIS AI Rcvd 22/03/24 - AI Revised NIS included The proposed development comprises of (1) Demolition of existing 2 storey dwelling; (2) The construction of 13 no. warehousing units with ancillary office space within 5 no. two storey blocks with a combined floor area of 11,102sqm (a warehousing floor area of 8.962sqm and ancillary office space of 2,140sqm) consisting of Block A, two units with a combined floor area of 2,598sqm. Block B, five units of combined floor space of 1,978 sqm. Block C, four units of combined floor space of 3,122 sqm. Block D, a single unit with a floor area of 2,078 sqm and Block E, a single unit with a floor area of 1,327 sqm; (3) Provision of signage totem of c. 5m in height and 1.6m in width to display future tenant information. (4) The removal of existing vehicular access and its replacement with a new vehicular and pedestrian access onto Swords Road. (5) Electricity substation; (6) Provision of 59 no. parking spaces of which 15 no. are accessibility spaces and 19 no. are EV spaces; (7) Provision of 112 no. bicycle spaces (64 no. spaces are external short stay and 48 no. spaces are internal long stay) and 16 no. motorcycle spaces. (8) Landscaping and boundary works. (9) Associated site works within a site area of 2.03ha at Lands at Carey House, Swords Road, Co Dublin. This application is accompanied by a Natura Impact Statement (NIS) SAI rcvd 04/04/2024
The development will consist/consists of: Retention permission consists of change of use to assembly/education from industrial to provide practical apprentice teaching facilities associated with the functioning of Dublin Airport in accordance with Development Plan Objectives ED30, ED32 and ED34 and Dublin Airport Local Area Plan Objectives ED01 and ED02. The permission application will consist of minor alterations to 2no existing facade openings consisting the addition of new facade and windows, which will be removed at the end of temporary use, and internal alterations to include the addition of an external escape door, window and an internal gantry of 38sqm.
The development will consist of installation of a new 40,000L above ground fuel storage tank with associated piping, new above ground fill points the extension of the existing concrete slab and associated drainage including a new 10,000 class 1 separator.
The proposed development, for which permission for development is sought, will consist of the construction of an extension to the north and west of the existing two-storey / storey and a half vernacular dwelling, which will provide for a part single-storey, part two-storey four-bedroom detached dwelling (c.202 square meters total gross floor area including part of the existing dwelling). The development, for which permission for development is sought, will also consist of the refurbishment, repair and upgrade of the existing dwelling (including replacement roof); the provision of new vehicular entrance (and associated gates, piers and railings), driveway and car parking; the provision of landscaping, including boundary treatments; the provision of all other associated site excavation, infrastructural and site development works above and below ground, including a proprietary waste water treatment system. The proposed development, for which retention permission and temporary permission for development is sought, consists of: a portable cabin (c. 33.5 sq m gross floor area) comprising an entrance lobby, a kitchen/dining room, a living room, a bedroom and bathroom; and for all other associated site excavation, infrastructural and site development works above and below ground, including proprietary waste water treatment system. Temporary permission is sought for the continued use of the existing portable cabin for a period of 3 No. years.
ERAC propose to erect a stand-alone totem sign to the front boundary of existing car rental hub site. Signage to be constructed from aluminium, finished in grey, fixed to black post and secured to existing ground levels. Signage to be illuminated from independent light bar and all associated and ancillary works.
Planning permission is sought for the following (i) Reconstruction of existing lean to conservatory to front, (ii) internal and external elevation alterations, (iii) a single storey extension to the rear of existing (iv) ancillary works including new boundary treatment, all existing dwelling. AI received 12/07/23
Retention Planning permission is being sought for the retention of a standalone structure divided into 2 units E1 and E2 (with a total floor area 61m2) for commercial storage use located adjacent to main entrance at Metropoint Business Park, Kettles Lane, Cloghran Swords Co. Dublin.
Planning permission is sought for
The installation of an ESB substation and switchroom on site.
The construction of two new 2.5m high draft lobbies at the entrance doors with fully glazed glass walling system to match the existing facade to the front of the crematorium building permitted under (reg ref F14A/0216)
We, Golden Port Homes Limited, intend to apply for permission for a Large-scale Residential Development on lands at Forest Road, Swords, Co. Dublin. The proposed development will consist of a total of 109 no. residential units (42 no. duplex units; 41 no. apartments; 26 no. houses) as follows: (i) 42 no. duplex units within 3-storey buildings comprising 21 No. 1 bed units at ground level and 21 No. 3 bed units over first and second floor levels with balconies/terraces, private and communal open space; (ii) 41 no. apartments within 2 blocks. Block A will be a 4 storey building with 14 no. apartments (5 no. 1 bed units and 9 no. 2 bed units) with balconies/terraces to the north, south and west elevations, and bin, bicycle parking and plant at ground floor level and pv panels at roof level; Block B will be a 5 storey building with 27 no. apartments (13 no. 1 bed and 14 no. 2 bed units) with balconies/terraces to the east and west elevations and bin, bicycle parking and plant at ground floor level and pv panels at roof level; (iii) 26 no. houses (comprising 5 no. 2 bed, 2 storey terrace houses; 6 no. 3 bed, 2 storey terrace houses; 4 No. 3 bed, 2 storey semi-detached houses; and 11 no. 4 bed, 3 storey houses); (iv) 96 no. Surface level car parking spaces and 4 no. surface level motorcycle parking spaces as well as bike parking stores and spaces; and bin stores; (v) 1 no. ESB substation; (vi) Landscaping, including the provision of new public open spaces with play areas and a MUGA; footpaths and cycle paths, new vehicular access/egress from Forest Road; public lighting; boundary treatment and all associated site, drainage and development works necessary to facilitate the proposed development.
The development consists of an existing telecommunications support structure (previously granted permission under Pl. Ref. F04A/0820) together with antennas, dishes, floodlights, for the GAA club, cabinets, fencing and all associated site development works. The development will continue to provide high speed wireless broadband and data services.
The development will consist of the demolition of existing storage warehouse and construction of a replacement storage warehouse at the same site location. The extension and upgrading of cladding on existing storage shed associated with the existing light industrial building and removal of existing Towers and Silo,s also associated with the light industrial building. Proposed minor internal changes and additional rooflight windows to the existing office/trade counter building and provision of dedicated staff and customer parking, delineation of loading & unloading set down areas for HGV/s, building signage and all associated site and development works. AI received 09/02/23
Demolition and removal of portion of existing sub-standard industrial type unit (266m²) and replacing this with new service workshop (431m²) along with alterations to section of the existing building being retained including removal of existing projecting porch and 2 no bay windows on north elevation, new wall cladding and windows to existing elevations and internal alterations to existing staff and ancillary areas.
APO Valet Parking Dublin Limited intend to apply for PERMISSION for development on this site located on lands at Kettles Lane, Glebe, Cloghran, Co. Dublin. The site is located north of Kettles Lane and immediately east of Metropoint Business Park. The proposed development will consist of: • The construction of a Light Industrial/Warehousing development comprising of 9 no. units ranging in size from c.174sqm to c.343sqm with a total gross floor area of c.2,915 sq.m. • Each unit includes ancillary office/admin/kitchenette at first floor level. • Provision of 26 no. car parking spaces and 36 no. cycle parking spaces. • Provision of on-site wastewater treatment system including septic tanks and percolation areas. • Provision of new vehicular entrance from Kettles Lane to the south and closure of existing access (from private lane) to the east of the site. • All associated site development, services provision, landscaping and boundary treatment works.
For permission for development on this site located on lands at Kettles Lane, Glebe, Cloghran, Co. Dublin. The site is located north of Kettles Lane and immediately east of Metropoint Business Park. The proposed development will consist of the construction of: (1) a multi-storey (up to 5 storeys) car park of 362 no. spaces ( with valet service) and ancillary single storey staff facilities block; (2) a 3 storey block of industrial units (3 no. ). Provision of new vehicular entrance from Kettles Lane to the south and closure of existing access (from private lane) to the east of the site. Provision of on-site wastewater treatment system including septic tanks and percolation areas. All assoicated site development, services provision, landscaping and boundary treatment works.
Apply for Retention Permission of 4 number existing internal classroom layouts, occupancy numbers and associated services.
The development will consist of a temporary (5 year lifespan) construction contractor 'West Compound' on a 5.9 ha site adjoining the R108 public road. The proposed development will include the continuation of use of the existing North Runway contractor compound (including existing office cabins, vehicle workshop, security gatehouse, soil mounding and foul sewer tank) along with a number of amendments and additions to the existing facility to provide a consolidated 'West Compound' for airside development contractors. The amendments and additions to the existing facility include: reduced car parking (150 no. spaces), new truck parking (25 no. spaces) and trailer set down area, new bus stop, cycle parking provision, a new hardstanding area for skip set down, new streetlighting and electrical switchroom. The proposal includes all associated ancillary development, site works and services including underground attenuation system.
Development will consist of a proposed new extension
Retention of single storey extension containing a bedroom and a WC to the side of an existing two storey dwelling and all associated site works.
The development will consist of proposed modifications to an extension previously permitted to the existing helicopter maintenance and heli-facility under planning permission Reg. Ref. F20A/0275, including proposed alterations to provide a slightly increased ground floor area for ease of construction and a proposed partial basement for use as an equipment and store room, signage to southern elevation, and all associated site works necessary to facilitate the development.
Conversion of existing attic to bedroom, with dormer extension to side & to rear and associated site works. Add Info received 1st December 2020.
The proposed development consists of: • Demolishing part of the existing warehouse (Unit 2) and car wash slab and make good eastern gable wall of remaining warehouse structure • Constructing a standalone, single storey, drive-thru restaurant (gfa 270 sq.m) including hot food for consumption off the premises, with drive-thru hatches and storage yard (including new elevational signage - 6 no. signs) • Provide an EV Charging hub (10 spaces) with canopy over including PV solar panels and signage • Relocate the brush wash to west side of site • Provide new car parking (19 no. customer spaces, 2 no. disabled spaces, 2 no. service bays and 4 no. staff spaces) • 8 no. bicycle parking spaces and 2 no. motorcycle spaces • Free standing signage in vicinity of the restaurant and new totem pole to south east of filling station • ESB substation and wash recycle housing • All associated site works including internal access road, paving, delivery bay, order points, seating area, height restrictor, access ramp, lighting, boundary treatment and landscaping.
Change of use of an existing karting motor racing track to a car rental storage car park and maintenance/cleaning facility on a site of 2.99 hectares. The development will consist of the change of use to provide for 1132 no. car parking spaces, a single storey maintenance/cleaning building of 294 sq.m including an external car wash and refuelling area, 4 staff car parking spaces, demolition of an existing single storey pavilion/corridor building (476 sq.m). The proposal includes revised boundaries and associated site works. Add Info received 13th March 2020.
Permission for the change of use of an existing karting motor racing track to a car rental storage car park and maintenance/cleaning facility on a site of 2.99 hectares. The development will consist of: the change of use to provide for 1100 no. car parking spaces, a single storey maintenance/cleaning building of 294 sq.m including an external car wash and refuelling area, demolition of an existing single storey pavilion/corridor building (476 sq.m). The proposal includes revised boundaries, service connections and associated site works. An Environmental Impact Assessment Report will be submitted to the County Council with this application (portal no. 2021072). AI received 04/10/21
Permission for a new single storey extension to side along with ancillary works.
The development will consist of
Approved Dublin Port to Dublin Airport fuel pipeline approved under Reg. Ref. F15A/0141, from the Athletic Union League/FAI sports grounds to the Dublin Airport terminal, located within the townlands of Toberbunny and Stockhole, Co. Dublin The development will consist of: Alterations to the Dublin Port to Dublin Airport fuel pipeline previously approved under Reg. Ref. F15A/0141. The proposed alterations, in the Athletic Union League/FAI sports grounds, M1 and Dublin Airport, are located within the townlands of Toberbunny and Stockhole, Co. Dublin. Permission is sought to amend the route of the pipeline as follows: It is now proposed to reroute the approved pipeline from Clonshaugh Road North along the southern boundary of Athletic Union League/FAI sports grounds, under the M1 Motorway, into Dublin Airport lands south of the Eastlands Car Hire Compound, along the western boundary of Eastlands Car Hire Compound where it will connect to the approved route. The proposed development will reduce the length of the pipeline in that area from 1,434m to 1,216m; Permission is also sought for all ancillary works, including landscaping and site preparation, necessary to facilitate the development. This planning application is accompanied by a Natura Impact Statement. AI received 27/7/2023
Retention will consist of changes to planning application F18B/0111. The retention changes are the removal of a door to the rear of the new works and moving the window to the centre of the rear new works and replacing a window to the side of the new works with a door and all ancillary works.
Planning Permission for the minor internal layout changes to the ground and first floors within the building known as the service building, complete with retention for an existing first floor window and 2 no. new matching windows to the rear of the existing east facing elevation, all with associated site works at their existing facility located.
Planning Permission for a ground floor
Planning Permission is sought for a material change of use from long term residential letting to short term residential letting.
Permission for temporary (12 months up to the end of 2021) change of use of 9.22 ha of existing Holiday Blue Car park for the development of a facility to provide for parking of Heavy Good Vehicles (HGV). The development comprises the reconfiguration of the existing car-parking area to provide 250 no. HGV parking spaces, as well as resurfacing of parking areas and internal roads. The development includes 10 no. prefabricated buildings comprising 2 no. 2.7m x 8.0m office units, 2 no. 2.7m x 8.0m canteen units, 4 no. 2.7 m x 5.0m bathroom units, 2 no. 2.7m x 6.0m shower units, proprietary waste-water treatment unit with percolation area, water connection to existing Irish Water service and ancillary works.
Planning permission for attic conversion with hip to gable roof and dormer to rear roof to accommodate stairs to allow access to attic conversion as non habitable storage space with roof windows to front, gable window to side all with associated ancillary works.
We, Frylite (Dublin) Ltd, intend to apply for permission for development/continuation of use at 'Frylite', Ballystruan Lane, Swords, Co. Dublin K67 K5X0. (The site was known and referred to in previous planning applications as the ABP Meat Processing Plant, St. Anne's Cloghran, Ballymun, Co. Dublin). The development will consist of temporary permission (5 years) for the the continuation of development granted temporary planning permission under P.A. Ref. F19A/0095. As per planning permission F19A/0095 the development consists of the continuation of the temporary change of use of part of the ABP meat processing plant from meat processing to a waste transfer and processing facility (non-hazardous wastes) providing for / incorporating: (a) The collection, processing, storage and bulking up of used and fresh cooking oil; (b) A waste transfer facility for food waste;(c) the washing of used cooking oil containers (d) a dissolved air floatation tank, (e) continued use of a portacabin office accommodation (permitted under P.A. Ref. F16A/0387), (f) continued use of part of the building for collection, storage and bulking up of used cooking oil, (g) use of 6no. existing silos for storage of fresh cooking oil and use of existing 1 no. silo for storage of used cooking oil, (h) 6 no. silos for storage of used cooking oil and, (i) all related site development works. A waste facility permit is required from Fingal County Council for this proposed development.
The development will consist of: retention of existing (89.0 m2) single storey valeting building, the removal of existing single storey portable cabins, permission of new single storey (154m2) extension to existing valeting building to be retained, permission for new single storey (80.0m2) modular office unit, including all associated site and ancillary works at this address according in accordance with drawings as submitted.