to
to

Planning records

Showing 51-83 of 83 public records
Page 2 of 2Next
  1. © OpenStreetMap
    WEB1260/22Refused

    An Seantac, Aulden Grange, Santry, Dublin 17

    The construction of a dormer window in the front elevation roof plane at first floor level and conversion of existing loft space to allow for two bedrooms with new window in East facing gable wall, new window in West facing gable wall and 5 roof lights in rear roof plane.Grounds not yet categorised
    Decision16 May 2022View record
  2. © OpenStreetMap
    F22B/0086Granted

    17 Abbey Park, Baldoyle, Dublin 13.

    Construction of a new 30 sq.m. first floor extension over an existing7 conditions indexed
    Decision10 May 2022View record
  3. © OpenStreetMap
    SD21A/0186Granted

    Plot 100, Profile Park, Nangor Road, Clondalkin, Dublin 22

    Construction of a 3 storey (part 4 storey) data centre known as 'DB8' to include data halls, electrical/plant rooms including internal generators, offices, lobbies, ancillary staff areas including break rooms and toilets, stores, stair/lift cores throughout and photovoltaic panels at roof level; the total gross floor area excluding hot air plenums and external staircase is c.9,601sq.m and the overall height of the data centre ranges from c.16m to c.20m to roof parapet level and up to c.24.48m including roof top plant, flues and lift overrun; provision of 5 external generators, 8 fuel tanks and ancillary plant contained within a plant yard to the north of DB8; provision of a water tank plant room, air cooled chillers and ancillary plant contained within a chiller plant yard to the south of DB8; provision of a water sprinkler pump room (c.23sqm), 2 sprinkler tanks (c.12m high each), heat recovery plant room (c.17sqm), ESB substation (c.44sqm), waste/bin stores (c.52sqm); total floor area of ancillary structures and plant (c.303sqm); provision of a delivery yard and loading bays, 64 car parking spaces, 5 motorcycle spaces, bicycle shelter serving 14 spaces, smoke shelter, internal access roads and footpaths, vehicular and pedestrian access to the west from Falcon Avenue and closure of an existing vehicular entrance from Falcon Avenue; all associated site development works, services provision, drainage works including attenuation, landscape and boundary treatment works including berming, hedgerow protection areas and security fencing; no buildings are proposed above the existing ESB wayleave and SDCC watermain wayleave to the west and north of the site; the area to the southwest of the site (temporary meadow) is reserved for a future data centre, subject of a separate application to South Dublin County Council on a site bounded to the east and south by Grange Castle Golf Club, to the north by Nangor Road (R134) and to the west by an estate road known as Falcon Avenue. This application is accompanied by a Natura Impact Statement.Decision record indexed
    Decision24 March 2022View record
  4. © OpenStreetMap
    21517Granted

    Lang's Bar and Restaurant, Grange Td., Grange

    Development consisting of (1) construction of new bar lounge extension (59.18 sqm) to north elevation of existing building (2) change of use of existing off licence area to bar lounge area (28.75 sqm) including alterations to north and west elevations of off licence section of building (3) construction of 2 open outdoor service areas one to north elevation (32.4 sqm) and one to west elevation (19.97 sqm) of new extension all to existing buildingDecision record indexed
    Decision23 February 2022View record
  5. © OpenStreetMap
    212263Granted

    Southgate Shopping Car Park, Grange Rath Level Units LGS4 & 5, Colp West Colpe Road Drogheda

    The change of use from existing permitted retail/retail service under SA800207 of units LGS 4 & 5, c 335 sqm to medical surgery/clinic and related consultants useDecision record indexed
    Decision01 February 2022View record
  6. © OpenStreetMap
    211231Granted

    Grange Upper, Newcastle West, Co. Limerick

    Construction of a dwelling house, garage, entrance, boundary walls an onsite waste water treatment and disposal system and all associated site worksDecision record indexed
    Decision17 December 2021View record
  7. © OpenStreetMap
    21/5815Granted

    River Bend Grange West Fermoy Co. Cork

    (a) Alterations and refurbishment to existing dwelling house (b) the construction of single storey extension and all associated site works.Decision record indexed
    Decision07 December 2021View record
  8. © OpenStreetMap
    SD21A/0203Granted

    Grange Castle Business Park, Nangor Road, Clondalkin, Dublin 22

    Modifications and minor additions to previously approved scheme (Planning Register Reference SD20A/0283) at this site of c.16.23ha (in total) comprising of the following changes to previously approved scheme SD20A/0283; Approved Central Administration Building (CAB), relocation of building to the east by approx. 7m; reconfiguration and setting out of building plans at all levels (including roof level) resulting in increase in building footprint of approximately 170sq.m (from 1,424sq.m to 1,594sq.m) associated changes to building elevations (design and finishes); approved single storey Cafeteria Element, additional basement level below cafeteria to accommodate plant; 9 rooflights (2.8 m diameter) and 9 rooflight (1.8m diameter), inclusion of MEP Plant on roof level including new flue extending approx. 1m above parapet; approved four-storey Office element, parapet at roof level to be raised by approx. 1.1m (increased from approved 19.5m in height to proposed 20.6m); overall increase in GIFA of 395sq.m; reconfiguration of area available for PV panels and sedum roof finish in order to accommodate required MEP equipment at roof levels. approved Data Centres - DUB14 and DUB15, reconfiguration and setting out affecting building locations and plans at all levels (including roof level) resulting in reduction in overall building footprint (for each building) by 48sq.m (from 13,442sq.m to 13,394sq.m), associated changes to staircases design, building elevations design and finishes, increase in parapet height of Vent Houses (at roof level) by approx. 350mm and omission of previously proposed zone of sedum roof finish; overall decrease in GIFA of 1,352sq.m in respect of DUB 14 and decrease of 1,453sq.m in respect of DUB 15; all plant equipment at ground level - reduced in height compared to approved layout so that the screening is deemed not required; DUB 14, reduction in height of approved flues by approx. 650mm, reduction in number of flues from 11 approved to 8 proposed; DUB 15, change to level of ground floor and associated increase in overall building height of approx. 700mm (parapet height increased from approved +83.0m O.D. to proposed +83.7m O.D.); reconfiguration of associated external plant at ground level (including generators / E-Houses & transformers) flues, omission of approved Modular Electrical Rooms (MERs) and associated screening serving approved Data Centres DUB14 &15; relocation, modifications to design and expansion of approved Water Treatment Building and associated plant to include, Water Treatment Tanks, 2 sprinkler tanks and relocated approved pump house (contained in the main Water Treatment Plant building) and 1 generator with additional proposed flue stack (height 30.75m) and 1 transformer; Gas Generator Compound - Relocation & reconfiguration of previously approved gas generator compound including, additional 4 generators (from 20 approved to 24 proposed), omission of approved E-houses; additional 7 electrical rooms, additional 7 flues (from 5 approved to 12 proposed); modifications to approved layout of internal site roads, yards and footpaths; relocation and modifications to design of approved Sprinkler Tanks and Pump Houses, Pump House serving DUB 14, relocated into proposed Water Treatment Building and compound, redesign of approved larger tank into proposed two smaller tanks; Pump House serving DUB 15, relocated to south of DUB15 the north facilitate space for electrical equipment redesign of approved larger tank into proposed two smaller tanks; relocation of Approved Gas Networks Ireland (GNI) gas skid & compound including approved 3 kiosk buildings; modifications to approved car park layouts and landscaping design; modifications to location and design of approved bicycle shelters; modifications to site development works, including underground water and building services provision, landscaping, internal security and compound enclosure fencing, and associated works; the remainder of the development (including permitted temporary construction car parking) to be carried out in accordance with parent permission SD20A/0283. An Environmental Impact Assessment Report (EIAR) has been submitted with this application; The application relates to a development which comprises an activity requiring an integrated pollution prevention and control (IE) licence relating to lands located west of the existing MS Data Centre Campus and also a site located north of the main entrance to the business park from Grange Castle Road.Decision record indexed
    Decision10 November 2021View record
  9. © OpenStreetMap
    21153Granted

    Glen Road, Grange West, Knocknarea

    Development consisting of the alterations to existing dwelling as follows (1) demolish existing conservatory to west elevation (2) construct a new extension to west elevation (3) retention of alterations made to external house elevations together with all associated site works, (refers PL04/129)Decision record indexed
    Decision20 October 2021View record
  10. © OpenStreetMap
    F21A/0362Granted

    Unit 15/16, Racecourse Shopping Centre, Grange Road, Dublin 13, D13 V4

    Change of use from Laundry to a new Takeout Cafe and Rotisserie Shop,5 conditions indexed
    Decision23 August 2021View record
  11. © OpenStreetMap
    F21A/0179Granted

    Unit 62 Grange Close, Baldoyle Industrial Estate, Baldoyle, Dublin 13

    Change of use of premises from an existing warehouse and ancillary off10 conditions indexed
    Decision05 August 2021View record
  12. © OpenStreetMap
    21198Refused

    Grange West, Knocknarea, Co Sligo

    Development consisting of construction of a detached single family dwelling including installation of a proprietary sewage treatment system together with all associated site works (refers PL04/366)Grounds not yet categorised
    Decision20 July 2021View record
  13. © OpenStreetMap
    ABP-309146-21Granted

    Grange Castle South Business Park, Clondalkin, Dublin 22

    The proposed development primarily comprises the provision of two 110kV transmission lines and a 110kV Gas Insulated Switchgear (GIS) substation compound along with associated and ancillary works and is described as follows: The proposed 110kV GIS Substation Compound is to be located on lands to the north-east of the two storey data centre facility and associated three storey office block that was permitted under SDCC Reg. Ref. SD18A/0134/An Bord Pleanála Ref. ABP-302813-18, and within an overall landholding bound to the north by the Grange Castle South Business Park access road; to the west by the Baldonnel Road and to the south by 3 residential properties and the Baldonnel Road; and to the east by the Google data centre facility within the Grange Castle South Business Park, Baldonnel, Dublin 22. The site of the proposed development has an area of c. 0.9163 hectares. The proposed 110kV Gas Insulated Switchgear (GIS) Substation Compound includes the provision of a two storey GIS Substation building (with a gross floor area of 1,307.2sqm) (known as the Aungierstown Substation), two transformers, lighting and lightning masts, car parking, associated underground services and roads within a 2.6m high fenced compound and all associated construction and ancillary works. Two proposed underground single circuit 110kV transmission lines will connect the proposed Aungierstown 110kV GIS Substation to the existing 220kV / 110kV Castlebaggot Substation to the immediate north-east. The proposed transmission lines cover a distance of approximately 120m and 140m within the townlands of Ballybane, and Aungierstown and Ballybane. The development includes the connections to the two substations (existing and proposed), changes to landscaping permitted under SDCC Reg. Ref. SD18A/0134 / An Bord Pleanála Ref. ABP-302813-18 and all associated construction and ancillary works. An Environmental Impact Assessment Report has been prepared in respect of this application. The planning application and the Environmental Impact Assessment Report may be inspected free of charge or purchased on payment of a specified fee (which fee shall not exceed the reasonable cost of making such copy) during public opening hours for a period of seven weeks commencing on the 21st January 2021 at the following locations: The Offices of An Bord Pleanála, 64 Marlborough Street, Dublin 1. South Dublin County Council, County Hall, Town Centre, Tallaght, Dublin 24. The application may also be viewed/downloaded on the following website: www.aungierstown-substation.com Submissions or observations may be made only to An Bord Pleanála ('the Board'), 64 Marlborough Street, Dublin 1 during the above-mentioned period of seven weeks relating to: the implications of the proposed development for proper planning and sustainable development, and the likely effects on the environment of the proposed development, and the likely significant effects of the proposed development on a European site, if carried out. Any submissions/observations must be accompanied by a fee of €50 (except for certain prescribed bodies) and must be received by the Board not later than 5.30p.m. on the 10th March 2021. Such submissions/observations must also include the following information: The name of the person making the submission or observation, the name of the person acting on his or her behalf, if any, and the address to which any correspondence relating to the application should be sent, The subject matter of the submission or observation, and The reasons, considerations and arguments on which the submission or observation is based in full. (Article 217 of the Planning & Development Regulations refers). Any submissions or observations which do not comply with the above requirements cannot be considered by the Board. The Board may at its absolute discretion hold an oral hearing on the application. (For further details see ‘A Guide to Public Participation in Strategic Infrastructure Development' on the Board’s website www.pleanala.ie). The Board may in respect of an application for permission/ approval decide to (a) (i) grant the permission/approval, or (ii) make such modifications to the proposed development as it specifies in its decision and grant permission/approval in respect of the proposed development as so modified, or (iii) grant permission/approval in respect of part of the proposed development (with or without specified modifications of it of the foregoing kind), and any of the above decisions may be subject to or without conditions, or (b) refuse to grant the permission/approval. Any enquiries relating to the application process should be directed to the Strategic Infrastructure Development Section of a Bord Pleanála (Tel. 01- 8588100). A person may question the validity of any such decision by the Board by way of an application for judicial review, under Order 84 of the Rules of the Superior Courts (S. I. No.15 of 1986, as amended), in accordance with section 50 of the Planning and Development Act, 2000, as amended. Practical information on the review mechanism can be accessed under the heading Information on cases / Weekly lists - Judicial review of planning decisions on the Board's website www.pleanala.ie or on the Citizens Information Service website www.citizensinformation.ie.Decision record indexed
    Decision19 July 2021View record
  14. © OpenStreetMap
    21108Granted

    Grange Lower, Newcastle West, Co. Limerick

    Construction of a two-storey style dwelling, garage, entrance, driveway, waste water treatment system with eco-flo filter and all ancillary site worksDecision record indexed
    Decision11 May 2021View record
  15. © OpenStreetMap
    21145Granted

    Grange Lower, Newcastle West, Co. Limerick

    Construction of a two storey style dwelling, garage, entrance, driveway, packaged waste water treatment system with eco-flo filter and all ancillary site worksDecision record indexed
    Decision11 May 2021View record
  16. © OpenStreetMap
    SD20A/0283Granted

    Grange Castle Business Park, Nangor Road, Clondalkin, Dublin 22

    Demolition of existing single storey vacant house, garage and outhouse (total gross floor area (GFA) c.291.2sq.m) and removal of existing temporary construction car park; Construction of a single 1-4 storey Central Administration Building and 2 2-storey (with mezzanine) data centres (DUB14 & DUB15) all to be located west of data centres DUB9, DUB10, DUB12 & DUB13 within the MS campus; The Central Administration Building (c.6.03m to c.19.85m high) will comprise central office administration, with staff cafeteria, staff gym and reception (GFA c.3,520sq.m), with provision of PV panels on the roof; each data centre (c.15.6m high to parapet height and c.18.65m to top of roof plant) will include data halls, admin blocks (comprising offices, canteen, loading dock, storage and ancillary areas) and a variety of mechanical and electrical plant areas/structures including Modular Electrical Rooms (MERs), battery rooms and transformer areas. GFA of DUB14 is c.28,072sq.m and GFA of DUB15 is c.28,173sq.m (c.56,246sq.m in total); DUB14 will also include 21 diesel generators and associated sub-stations (E-houses) and 11 mechanical flues (each c.30.75m high); Provision of a gas generator compound (to serve DUB15) containing 20 generators, 5 E-houses and 5 flues (c.25m max height); Provision of a Gas Networks Ireland gas skid including 3 kiosk buildings; Expansion of existing electrical sub-station compound (originally granted under SD07A/0632) to provide 3 additional transformer bays. 3 E-houses and 1 control room, 2 auxiliary transformers; 2 sprinkler tank and pump house areas, 1 additional rainwater harvesting plant; Provision of 168 permanent car parking spaces and 40 cycle parking spaces; Provision of additional western access to the MS campus (to serves the Central Administration Building) from the Business Park estate road (including bridge over the Griffeen River) with existing temporary access to be extinguished; Physical integration with the remainder of the existing MS campus (including internal access roads and landscaping) with associated modifications to the western boundary of the DUB09/DUB10/DUB12/DUB13 data centre development as permitted under SD16A/0088; Provision of a new temporary construction car park (with 802 car spaces, shuttle bus stop and shelter) on site north of the main entrance to the business park; Total gross floor area of the development will be c.59,766sq.m; All associated site development works, drainage and services provision, landscaping, boundary treatments (including security fencing) and associated works; An Environmental Impact Assessment Report (EIAR) has been submitted with this application; The application relates to a development which comprises an activity requiring an integrated pollution prevention and control (IE) licence.Decision record indexed
    Decision29 March 2021View record
  17. © OpenStreetMap
    SD20A/0295Granted

    Townlands within Grange Castle South Business Park, Baldonnel, Dublin 22

    Amendments and modifications to the permitted data centre development granted under Reg. Ref. SD18A/0134 - ABP Ref. ABP-302813-18 and the temporary substation permission granted under SD19A/0300 to include: Demolition of the two storey dwelling of Weston House; single storey dwelling and outbuildings/ stables of Weston Lodge; and the single storey dwelling and converted garage of Kent Cottage. Retention of sprinkler tank and pump house to the south-west of Building A Data Centre to replace 4 sprinkler tanks; Retention of 40kW(p) PV panels on the roof of Building A Data Centre; Retention of revised size of northern attenuation pond and loss of permitted landscaping to its south; Retention of ramped access to rear of temporary substation permitted under SD19A/0300; Retention of revised flue arrangement for Building A Data Centre from 2 associated flues per generator to 1 associated flue per generator (16 in total) and grouped into 8 towers of two flues each (each 20m high); Retention of revised position of security fence to north, west and south of Building A Data Centre; and retention and modifications of landscape berm along Baldonnel Road and to east of Weston House. Development will consist of new works to include: Modifications of permitted vehicular entrance to the data centre to include a new single storey guard house (37sq.m) and two internal entrance gates; Modification to car parking so that the permitted entrance to the parking area from the east is closed off; Modifications of flue arrangement for Building B Data Centre from 2 associated flues per generator to 1 associated flue per generator (16 in total) and grouped into 8 towers of two flues each (each 20m high); Modifications to permitted landscape scheme to north and south of Building A Data Centre; Removal of roadside entrance to Erganagh House (demolished), Kent Cottage, and the former scaffolding yard; and removal of roadside entrance to Weston House and its replacement with a new agricultural gate and fence to be erected to facilitate access for maintenance and security purposes only all on a site of 9.7Ha located within lands in the Grange Castle South Business Park and the residential properties of Weston House, Kent Cottage and Weston Lodge as well as the former scaffolding yard on land within the townlands of Aungierstown and Ballybane; Ballybane; and Milltown and bounding Baldonnel Road to the west and south and Grange Castle South access road to the north, Baldonnel, Dublin 22.Decision record indexed
    Decision16 March 2021View record
  18. © OpenStreetMap
    201491Granted

    Grange, Lorrha, Co Tipperary

    To add a conservatory to the gable on the west side of dwelling houseDecision record indexed
    Decision28 January 2021View record
  19. © OpenStreetMap
    20/5939Granted

    Grange West Buttevant Co. Cork

    To construct a detached two storey dwelling, domestic garage, septic tank and percolation area and all associated site works.Decision record indexed
    Decision21 January 2021View record
  20. © OpenStreetMap
    20/4634Granted

    Grange West T.D. Buttevant Co. Cork

    To construct a dwelling, domestic garage, and all associated site works.Decision record indexed
    Decision06 January 2021View record
  21. © OpenStreetMap
    20/5716Granted

    Grange West Fermoy Co. Cork

    To erect a side sun lounge extension to the south east gable of existing dwelling house and to erect a garden detached enclosed pagoda and all associated site works.Decision record indexed
    Decision14 December 2020View record
  22. © OpenStreetMap
    20317Granted

    Grange North, Knocknarea, Co Sligo

    Development consisting of the renovation and extension of existing family dwelling house with single level extension to the west side to accommodate assisted living unit, two storey extension to the north side to accommodate renovated family dwelling house, demolition and removal of existing garage and shed, new site entrance and new proprietary sewage treatment system with all associated and ancillary site works/landscaping works and servicesDecision record indexed
    Decision06 November 2020View record
  23. © OpenStreetMap
    3237/20Granted

    Holy Trinity Senior National School, Grange Road, Donaghmede, Dublin 13

    Planning permission is sought for the construction of a 210sqm single storey ground floor extension to the west of the existing school to accommodate 2no. classrooms and 2no. resource rooms, along with internal alterations and associated site works.Decision record indexed
    Decision15 October 2020View record
  24. © OpenStreetMap
    ABP30733220Granted

    Dean’s Grange Road, (also known as Deansgrange Road), Deansgrange, Blackrock, Co. Dublin.

    Permission for a strategic housing development consisting of: The demolition of22 conditions indexed
    Decision29 September 2020View record
  25. © OpenStreetMap
    SH307244Granted

    Grangend, Dunshaughlin, Co Meath

    Demolition of 2 no. derelict buildings (former houses) at the northern boundary of the site. Construction of 212 no. dwellings comprising: 113 no. 2 no. storey houses comprising 21 no. 4-bed and 92 no. 3-bed; 99 no. apartments in 6 no. 3-4 storey blocks comprising 6 no. 1-bed, 90 no. 2-bed and 3 no. 3-bed; All with associated private gardens/ balconies/ terraces to the north/ south/ east/ west elevations; Construction of a creche (c.396.22sq.m); Construction of a c.250m section of the Dunshaughlin (East) Main Distributor Road; Construction of a new verge, path and cycle lane along the R125 with the road realigned to create a new street; Provision of vehicular entrances from the R125, with additional vehicular access from the new distributor road to the east, and also from the existing Grange Park residential development to the south; Provision of 362 no. car parking spaces and 264 no. secure bike parking spaces; Provision of open spaces including a new civic park; All associated site development and services connections including bin stores, ESB substations, boundary treatment works, realignment of existing stream through the site, and associated site works and landscaping. The application contains a statement setting out how the proposal will be consistent with the objectives of the Meath County Council development plan 2013-2019. A Natura Impact Statement has been prepared in respect of the proposed development.Decision record indexed
    Decision15 September 2020View record
  26. © OpenStreetMap
    20737Granted

    The Gate Lodge, Curragh Grange House, Green Road Newbridge

    Of alterations and modifications to existing gate lodge dwelling comprising of A. Extending building footprint to: North East elevation (comprising of a bay window), to South East and South West elevations B. Modifications to internal layout, including 3 no. Bedrooms, 2 no. Ensuites, Bathroom, Hotpress, 2 no. Walk in Wardrobes, Utility Room and Kitchen/Dining and Living Area C. Minor alterations to all elevations D. and all ancillary site worksDecision record indexed
    Decision31 August 2020View record
  27. © OpenStreetMap
    SD20A/0121Granted

    Townlands within Grange Castle South Business Park, Baldonnel, Dublin 22

    Permission for a period of ten years for development at this site of 16.5 hectares that is located within lands in the Grange Castle South Business Park and includes the residential property of Ballybane, Old Nangor Road on land within the townlands of Milltown; Ballybane and; Aungierstown and Ballybane; and bounding Baldonnel Road to the west; both the Old and New Nangor Road to the north; and Grange Castle South Access Road to the South, Baldonnel, Dublin 22. The development will consist of the following: (1) The demolition of the existing two storey dwelling of Ballybane and associated farm buildings (565sq.m) and the construction of 3 two storey data centres with mezzanine floors at each level of each facility and associated ancillary development that will have a gross floor area of 80,269sq.m on an overall site of 16.5hectares. (2) 1 two storey data centre (Building A) that will be located to the south-west of the site and will have a gross floor area of 28,573sq.m. and will include 26 emergency generators located at ground floor level within a compound to the northern side of the data centre with associated flues that will be 25m in height. The facility will also include 26 ventilation shafts which will be located above the northern end of each emergency generator that will measure 20m in height. (3) 1 two storey data centre (Building B) which will be located to the north-west of the site, and to the immediate north of Building A and will have a gross floor area of 21,725sq.m and which will include 18 emergency generators located at ground floor level within a compound to the northern side of the data centre with associated flues that will be 25m in height. The facility will also include 18 ventilation shafts which will be located above the southern end of each emergency generator that will measure 20m in height. (4) 1 two storey data centre (Building C) which will be constructed last, will be located to the eastern part of the site on a north-south axis and will have a gross floor area of 28,573sq.m. It will include 26 emergency generators located at ground floor level within a compound to the western side of the data centre with associated flues that will be 25m in height. The facility will also include 26 ventilation shafts that will be located above the western end of each emergency generator that will measure 20m in height. (5) Each of the three data centres will include data storage rooms, associated electrical and mechanical plant rooms, loading bays, maintenance and storage spaces, office administration areas, and plant including PV panels at roof level as well as a separate house generator for each facility which will provide emergency power to the admin and ancillary spaces. Each data centre will also include a diesel tank and a refuelling area to serve the proposed emergency generators. (6) The overall height of each data centre apart from the flues and plant at roof level is c. 19.85m above the finished floor level. (7) 1 temporary and single storey substation (29sq.m). (8) 3 single storey MV buildings (each 249sq.m - 747sq.m in total) which manage the supply of electricity from the substations to each data centre and are located to the immediate west of the generator compound within buildings A and B, and to the south of the generator compound withing building C. (9) 8 prefabricated containerised electrical rooms (65sq.m each and 520sq.m overall) that are stacked in pairs to the immediate south of the temporary substation. (10) Ancillary site development works, which will include attenuation ponds and the installation and connection to the underground foul and storm water drainage network and installation of utility ducts and cables which will include the drilling and laying of ducts and cables under Baldonnel stream. Other ancillary site development works will include hard and soft landscaping, lighting, fencing, signage, service road, entrance gate, sprinkler tank house (72sq.m), security hut (30sq.m) and 150 car parking spaces and 78 sheltered bicycle parking spaces. The development will be enclosed with landscaping to all frontages including a wetland to the west. The development will be accessed from the Grange Castle South Access Road from the south via the Baldonnel Road. An Environmental Impact Assessment Report (EIAR) has been submitted with this application.Decision record indexed
    Decision29 July 2020View record
  28. © OpenStreetMap
    20138Granted

    22A Forest Grange, Ballymakenny Road, Drogheda Co Louth

    Permission for proposed dormer window to front elevation (west) of existing semi-detached dormer dwelling houseDecision record indexed
    Decision04 June 2020View record
  29. © OpenStreetMap
    F20A/0083Granted

    Racecourse Shopping Centre, Grange Road, Baldoyle, Dublin 13, D13 K8K0

    Amendments to planning permission reference F19A/0045 which related to7 conditions indexed
    Decision14 April 2020View record
  30. © OpenStreetMap
    SD20A/0031Granted

    Grange, Newcastle Road, Lucan, Co. Dublin

    Relocation of the temporary gas powered generation plant for a further two years from lands to the rear of the Takeda Ireland complex to the east of the site; to lands to the immediate north-west within the Edgeconnex campus and to the immediate east of the data centre granted and built under Reg. Ref. SD17A/0141 and SD17A/0392; the relocated temporary gas powered generation plant will be enclosed within a walled yard of 2,836sq.m containing 12 generator units with associated flues (each 15m high) that was permitted for a period of three years on the 15th May 2017 under condition No. 4 of permission granted under Reg. Ref. SD17A/0027; vehicular access to the generation plant will remain from the permitted service road into the Edgeconnex site and Grange Castle Business Park as originally permitted.Decision record indexed
    Decision09 April 2020View record
  31. © OpenStreetMap
    F19A/0537Granted

    86 Grange Road, Baldoyle, Dublin 13

    Construction of new detached dormer dwelling house14 conditions indexed
    Decision28 February 2020View record
  32. © OpenStreetMap
    SH305703Refused

    Colp West, Drogheda, County Meath

    DIRECT APPLICATION TO AN BORD PLEANALA - SUBMISSION TO AN BORD PLEANALA. 357 no. residential units, a childcare facility and associated outdoor play area, road infrastructure, a pedestrian bridge over the railway line and associated pathways, all associated open space, cycle and pedestrian infrastructure, services and all other associated development on a site of c. 13.44 hectares. The 357 no. residential units proposed consist of 169 no. houses, 52 no. duplex apartments and 136 no. apartments. The 169 no. houses will consist of the following: • • 104 no. 3 bedroom units • 65 no. 4 bedroom units The 136 no. apartment units will consist of the following: • 58 no. 1 bedroom units • 78no. 2 bedroom units The 52 no. duplex units will consist of the following: • 52 no. 3 bedroom units The proposed childcare facility is a two storey building with a GFA of 439 sq.m. The proposed houses are 2 to 3 storeys in height and the duplex/apartment blocks are 3 to 6 storeys in height. The development includes road infrastructure comprising of a link street approximately 652m in length (including changes to the previously permitted road infrastructure under Reg. Ref.: LB/180620), including bus stops, 1 no. roundabout, pedestrian crossings and c. 246m long road to the east to facilitate a connection to the existing school on Mill Road (Gaelscoil an Bhradáin Feasa). The road infrastructure also includes the realignment of a section of Colpe Road and the realignment of the southern section of Mill Road, and includes proposed cycle lanes/paths, footpaths, grass verge, and the provision of a footpath and cyclepath / cycle lane on Colpe Road to tie-in with the existing shared footpath / cyclepath, to the south-west of the railway line. The proposed new pedestrian bridge will cross the existing Dublin to Belfast railway line and will link the proposed SHD development to the existing Grange Rath housing development to the south-west. The development includes associated site and infrastructural 592 no. car parking spaces, 532 no. cycle parking spaces, public open space including a linear park, bin and bike stores, landscaping, public lighting, temporary marketing suite and signage (during construction phases), and all associated site and infrastructural works. An Environmental Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS) have been prepared in respect of the proposed development and accompany this application.Grounds not yet categorised
    Decision11 February 2020View record
  33. © OpenStreetMap
    191108Granted

    Grange Lower, Newcastle West, Co. Limerick.

    As constructed dwelling house, change of design from that previously granted under planning ref. 77/12759 and all associated site worksDecision record indexed
    Decision09 January 2020View record
Showing 51-83 of 83
Page 2 of 2Next