Development on a site of c7.29 ha located on lands east of Barney's Lane, Brownsbarn, Baldonnell, Co. Dublin. The proposed development is comprised of change of use of the lands from vehicle distribution centre car park to a logistics warehouse campus. The proposed development includes 4 no. new logistics / warehouse units as follows; 1. Unit 1 - GFA c. 5,936 sq m (warehouse area c. 5,248 sq m, with c. 688 sq m ancillary office and staff facility spaces); 2. Unit 2 - GFA c. 3,632 sqm (warehouse area c. 3181 sq m, with c. 451 sq m ancillary office and staff facility spaces); 3. Unit 3 - GFA c. 6,389 sqm (warehouse area c. 5658 sq m, with c. 730 sq m ancillary office and staff facility spaces); 4. Unit 4 - GFA c. 4,089 sqm (warehouse area c. 3,591 sq m, with c. 498 sq m ancillary office and staff facility spaces); Access to the site will be provided via a new vehicular, pedestrian and cycle entrance via the roundabout at Brownsbarn Drive, to the south of the site, with associated modifications proposed to the roundabout to facilitate access. Each proposed block includes associated set down, turning areas, loading docks, delivery and marshalling yards; 164 no. car, and 106 no. cycle parking spaces; plant and tank areas. The development also includes all internal roads, cyclepaths and footpaths, all site development works and changes in level; site clearance works including the partial removal of hedgerows; hard and soft landscaping; signage; boundary treatments, ducting, cabling and pipework; public and security lighting; CCTV; 2 no. ESB Substations; SUDs including provision of pons; PV Panels; and all other ancillary works.
The development will consist of: The change of use of the existing warehouse to a clean manufacturing area - light industrial. Alterations to the existing south elevation, including the installation of new signage displaying the company name and the removal of the existing balcony. The provision of new double access doors and a new external pathway to facilitate access to the building; including all associated site and ancillary works.
Retention consists of the construction of two rooflights in the main roof to the front of the property.
2 halo illuminated signs to the southern and northern elevations of Unit D and all associated works.
Plant and associated development for the permitted and under construction Unit D (Reg. Ref. SD19A/0370, Reg. SD20A/0215 and Reg. SD20A/0319; works to include 4 air handling units, 2 climate control condensers, 1 transformer, 1 container pump house, 1 sprinkler tank and all associated works including the reduction in car parking by 3 spaces on a site located between the Casement Aerodrome and the N7 national route.
Subdivision of a two storey apartment across second and third floors (170.12sq.m) into two separate apartments each with own door access to be known as 311 Swiftwood (second floor - 84.65sq.m) and 411 Swiftwood (third floor - 85.47sq.m).
Provision of a 3 storey office development with a total gross floor area of c. 2,992sq.m (excluding the c. 205sq.m plant room at roof level); Provision of 51 car parking spaces (including 2 accessible spaces and 27 EV spaces with charging points), accessed via the existing vehicular entrance from Lake Drive; Provision of 2 pedestrian access points to the north and east of the site, bicycle parking facilities, an ESB substation (c. 22sq.m), waste storage facilities (c. 20sq.m); signage, soft and hard landscaping works, PV panels, external lighting, piped infrastructure and ducting, SuDS drainage and all ancillary site excavation and development works above and below ground.
Installation of two internally illuminated external building mounted signs to the existing west and east facades.
Installation of a new access door and canopy to the south east elevation at ground floor level, the replacement of 4 spandrel panels with louvred vents below first floor level slab, and a new air handling unit with louvred enclosure and access doors at roof level.
Retention consists of the construction of a rooflight in the main roof to the front of the property.
New educational campus of 2 new school buildings to be delivered on a phased basis including the demolition/removal of the existing 4 four storey educational/former short stay residential blocks (golf apartments) on the site; provision of 1 part three storey, 1000 pupil post primary school including 4 classroom special educational needs unit with a gross floor area of 11,331sq.m including a sports hall and all ancillary teacher and pupil facilities; 1 two storey 16 classroom primary school and 2 classroom special educational needs unit; a general purpose hall and all ancillary teacher and pupils facilities with a gross floor area of 2,820sq.m; vehicular access to the site will be from the existing Fortunestown Lane entrance, which is to be widened; fire tender and delivery access will be from the existing entrance to the northwest of the site, via Fortunestown Lane; cycle and pedestrian access to the site will be from a new entrance on Fortunestown Lane; provision of bicycle and scooter parking; new pedestrian crossing at Saggart Lakes Road, vehicle drop off/set down areas; internal access roads; hard and soft play areas; piped infrastructure and ducting; plant, landscaping and boundary treatments; PV panels; external courtyards; disabled car parking spaces; ESB substation and 1 substation access door to the site boundary wall on Fortunestown Lane; ancillary ramps and stairs; signage; 1 attenuation tank; flood mitigation measures; SUD's; changes in level and all associated site development and excavation works above and below ground.
New educational campus of 2 new school buildings to be delivered on a phased basis including the demolition/removal of the existing 4 four storey educational/former short stay residential blocks (golf apartments) on the site; provision of 1 part three storey, 1000 pupil post primary school including 4 classroom special educational needs unit with a gross floor area of 11,331sq.m including a sports hall and all ancillary teacher and pupil facilities; 1 two storey 16 classroom primary school and 2 classroom special educational needs unit; a general purpose hall and all ancillary teacher and pupils facilities with a gross floor area of 2,820sq.m; vehicular access to the site will be from the existing Fortunestown Lane entrance, which is to be widened; fire tender and delivery access will be from the existing entrance to the northwest of the site, via Fortunestown Lane; cycle and pedestrian access to the site will be from a new entrance on Fortunestown Lane; provision of bicycle and scooter parking; new pedestrian crossing at Saggart Lakes Road, vehicle drop off/set down areas; internal access roads; hard and soft play areas; piped infrastructure and ducting; plant, landscaping and boundary treatments; PV panels; external courtyards; disabled car parking spaces; ESB substation and 1 substation access door to the site boundary wall on Fortunestown Lane; ancillary ramps and stairs; signage; 1 attenuation tank; flood mitigation measures; SUD's; changes in level and all associated site development and excavation works above and below ground.
Permission for development on a site of 6.7ha. The proposed development will consist of the construction of a Photovoltaic Solar development to the North of the Citywest hotel on lands formally in use as a golf course [comprising a change of use from former golf course to solar development]. The proposed development will include the installation of solar photovoltaic (PV) panels on ground mounted frames/support structures, underground cabling and ducting, security fencing, CCTV cameras, temporary construction compound and an area of hardstanding for an electrical compound. The electrical compound will consist of two modified shipping containers, containing 3 inverters and LV Switch gear. This compound will also accommodate the Battery Energy Storage system, PV inverter and a transformer. The proposed development includes the above as well as drainage, landscaping, bio-diversity enhancement measures and all other associated site excavation, infrastructural and site development works above and below ground. While the proposed development relates to a total site area of 6.7ha, c.3.5ha of this constitutes the actual land take post development. The operational lifespan of the solar PV development will be 30 years. A Natura Impact statement (NIS) accompanies the planning application.
Installation of two internally illuminated external building mounted signs to the existing south-west and north-west facades.
New main entrance door and canopy, installation of external signage and removal of existing draught lobby to south-west facade, installation of 5no. glazed doors and 4no. louvred panels to existing glazed facades, provision of 198sqm of photovoltaic panels below parapet level of flat roof, 2no. free-standing signage totems, 8no. new Electric Vehicle charging points, 2no. bicycle parking shelters and miscellaneous landscaping works.
The construction of a 4-storey Primary Care Centre building which will provide HSE Services such as general primary care, mental health, disability and older person services; The building will accommodate GP rooms, day care centre with associated kitchen facilities and external deck amenity space, pharmacy, treatment/consultation rooms, primary care administrative offices, as well as ancillary accommodation including staff facilities, offices, meeting rooms, reception/waiting areas, ESB substation and plant; The development will be accessed via the existing avenue to the Citywest Campus entered from Garters Lane at the existing traffic light controlled junction, with a new internal road layout from the existing roundabout on the access avenue to provide 2 no. vehicular entrances to car parking within the subject site; The car parking will be divided into a dedicated staff car park and a visitor car park with both to be controlled by barrier access and a total of 158 no. car parking spaces provided; The proposal also includes bicycle parking, service yard, pumping station, SuDS drainage, PV panels at roof level, signage, landscaping, boundary treatment and all associated site works and services.
The Construction of 2 no. 6.50m wide X 3.0m high digital advertising panels (arranged in a V plan 6.50 meters from ground to top of structure) with a 250mm frame all around each
The development will consist of erection of back-lit signage to the west elevation of Unit 3018.
Signage for Unit E including the provision of 1 halo illuminated sign to the north eastern elevation; and all associated works. (Development site at Unit E in the townland of Collegeland, Baldonnel Business Park, Dublin 22; the site is under construction and located between Casement Aerodrome and the N7 national route)
Canopy waste compactor/baler on south western elevation and all associated site works on a site under construction and located between Casement Aerodrome and the N7 national route. The proposal amends a previously permitted development under SDCC Reg. Ref. SD20A/0215.
1 x 50 KWp solar photovoltaic (PV) will consist of 154 PV panels on the warehouse roof and will occupy an area of 254sq.m.
Retention permission for hard stand area and for permission to complete works, incorporating the setting out of lorry trailer park, drainage network, attenuation tank together with Asphalt Concrete finish, and all associated site works.
Change of use from existing restaurant use at ground floor to proposed office use (235sq.m).
Construction 2 logistics/warehouse units (Unit F and Unit G amounting to 15,168sq.m GIA in total) south west of Mountpark Baldonnell Phase 1 and west of the older original Business Park; Unit F will comprise a GIA 6,463sq.m (including 568sq.m of ancillary office space), 65 car parking spaces and 20 bicycle spaces; Unit G will comprise a GIA 8,705sq.m (including 608sq.m of ancillary office space) 87 car parking spaces and 28 bicycle spaces; flood mitigation measures as permitted under SD20A/0215 and SD20A/0319 will service the development and are under construction; access to the site will be from the existing Phase 1 development (referenced below) located on Clonlara Road; totem wayfinding signage; all ancillary landscaping, PV panels; internal roads, associated infrastructure and buildings and site development works to support the development at the townlands of Moneenalion Commons Upper, Brownsbarn and Collegeland, Baldonnell Business Park, Dublin 22; the site is primarily greenfield and located between Casement Aerodrome and the N7 national route; the proposal will form part of the second phase of development to that permitted under SD20A/0215, SD19A/0370 and Phase 1 under SD15A/0309 (ABP Ref. PL06S.246392), as amended by permissions SD17A/0362, SD18A/0266 SD19A/0048 and SD20A/0319; an Environmental Impact Assessment Report (EIAR) will be submitted to the Planning Authority with the planning application.
Amend permitted logistics/warehouse units C and D and incorporate other amendments, providing for a resultant; Unit C, 7,937sq.m including 757sq.m ancillary office space (permitted 11,492sq.m total); Unit D, 12,050sq.m including 911sq.m ancillary office space (permitted 7, 856sqm total); Overall increase of 639sq.m for Units C and D; provision of maintenance ramp to swale; resultant amendments to site layout, minor revisions to flood mitigation strategy, yards, elevations, signage, internal road layout, landscaping, ground works, drainage, gates, fencing, services and utilities and all associated and ancillary site development works at a site at the townlands of Moneenalion Commons Upper, Brownsbarn and Collegeland, Baldonnell Business Park and is located between the Casement Aerodrome and the N7 national route and comprising of amendments to the second phase of development permitted under Ref. SD19A/0370 & SD20A/0215.
Amendment to previously permitted Ref. SD20A/0215 consisting of signage for Unit E including the provision of, 2 way finding signs located at entrances to Unit E; 2 totem signs located to the west and north of Unit E; 3 halo illuminated signs to the south-western, north-eastern and south-eastern elevations; all associated works.
The construction a logistics/warehouse unit (Unit E) southwest of Mountpark Baldonnell Phase 1 and west of the older original Business Park, Unit E will comprise of a GIA 60,747sq.m (including 2,020sq.m of ancillary office space and 4,802sq.m of other ancillary areas); Provide for 340 car parking spaces, 22 motorcycle parking spaces and 160 bicycle spaces to serves the proposed development; Flood mitigation works to store and attenuate flood flows from the River Camac; Formations of plateaux on the site with surplus excavated material to allow for future development of Unit F; Access to the site will be from the existing Phase 1 development (referenced above) located on Clonlara Road; amendments to the yard and entrance arrangement for permitted Unit D are proposed (SD19A/0048); All ancillary landscaping, internal roads, associated infrastructure and buildings and site development works to support the development which is primarily greenfield and located between Casement Aerodrome and the N7 national route. The proposal will form part of the second phase of development to that permitted under SD19A/0370 and Phase 1 under SD15A/0309 (ABP Ref. PL06S.246392), as amended by permissions SD17A/0362, SD18A/0266 and SD19A/0048. An Environmental Impact Assessment Report (EIAR) will be submitted to the Planning Authority with the planning application.
Construction of two logistics/warehouse units (Unit C & D) southwest of Mountpark Baldonnell Phase 1 and west of the older original Business Park. Unit C will comprise of a GIA 11,492sq.m (including 592sq.m of associated office space); Unit D will comprise of a GIA 7,856sq.m (including 400sq.m of associated office space); provide for 193 car parking spaces and 56 bicycle spaces to serve the proposed development; flood mitigation works to store and attenuate flood flows from the River Camac; formation of plateaus on the site with surplus excavated material to allow for future development; access to the site will be from the existing Phase 1 development located on Clonlara Road; all ancillary landscaping, internal roads, associated infrastructure and site development works to support the development; the site is primarily greenfield and located between Casement Aerodrome and the N7 national route; the proposal will form a second phase of Development to that permitted under SD15A/0309 (ABP Ref. PL06S.246392) as amended by permissions SD17A/0362, SD18A/0266 and SD19A/0048; An Environmental Impact Assessment Report (EIAR) is submitted with the planning application.
Double storey extension comprising a playroom, utility room and office room to the ground floor, extended bedroom, walk-in wardrobe and bathroom to the first floor to an existing detached house; alterations to the existing house front elevation including new window to the first floor bedroom; all to be constructed behind existing boundary walls.
Alterations to existing east and west elevations to include 10 external vents; installation of new photovoltaic solar panels to existing roof; provision of 10 bicycle parking spaces; 2 EV chargers; 1 external condenser and all associated site works.
Expansion of the floor plate of proposed creche/pre-school facility (area 370sq.m) to include adjoining storage space (32sq.m) with revised layout plan to that approved in ref. SHD3ABP-302398-18.
Change of use from permitted retail use to retail use including the sale of alcohol for consumption off the premises (off licence use) within the overall permitted retail unit, where the floor area for the off licence use is 15sq.m and is ancillary to the primary retail use.
Construction of three 3 storey office buildings, with a total floor area of approx. 16,732sq.m. The proposed development also provides for plant rooms at roof level, all associated site development works, landscaping, café (57sq.m), bicycle parking, car parking at surface level, basement level & a two level podium car park in the north-east corner of the site incorporating shower & changing facilities (152sq.m), ESB substations & service plant, and bin storage, all on a site area of 3.74ha. The effect of the proposed development will be a modification to part of an extant permission under Reg.Ref. SD06A/0737 & SD06A/0737/EP. The proposed development also provides for 2 vehicular access points off Kingswood Road ( Old Naas Road) and 2 vehicular access points of Kingswood Avenue.
The installation of telecommunications equipment including no. 3 ballast mounted shrouded antennas, no. 1 ballast mounted dish, remote radio units (RRU's), cable trays, GPS, cabinet and all other associated site development works on the building rooftop to provide for high-speed wireless data and broadband services.
Retention of modifications to the permitted ground floor layout to include a reduction in the area of the permitted hot food deli, the inclusion of a second deli/servery, both selling hot and cold food for consumption on and off the premises, and changes to the associated seating areas, all remaining subsidiary to the overall use of the premises as a service station.
Change of use from aparthotel to restaurant, together with external signage and all associated site works.
Side/rear two storey extension and rear single storey extension to dwelling; attic roof space conversion with roof dormer to rear part of roof with associated internal alterations; forming pedestrian access gateway to side boundary wall with associated boundary treatment alterations and all associated site development works.
Side/rear two storey extension and rear single storey extension to dwelling house; attic roof space conversion with roof dormer to rear part of roof with associated internal alterations; forming vehicular access driveway off Carrigmore Meadows to side/rear garden with associated boundary treatment alterations site development works.
The development comprises of permission for new signage elements and site development works. As well as retention permission for various minor amendments to the development permitted under South Dublin County Council Planning Reference SD22A/0282. Specifically, 3no additional high power electric vehicle charging units, bollards, and 6no parking spaces, relocation of existing light column and previously approved substation, and all associated site development works.
Change of use from education to office use within the existing building. No increase in area, external alterations or extensions are proposed.
The installation of an external Air Handling Unit, to be housed in a new timber and metal clad enclosure adjacent to Unit 3030, Lake Drive and the installation of a Heat Pump Unit to be installed within an existing plant enclosure, with additional cladding proposed, in the north east corner of the carpark of Unit 3030 and all ancillary engineering and landscape works necessary to facilitate the development at Unit 3030 Lake Drive, Browns barn, Dublin 24 D24 KX6Y. (Previous planning reference SD25A/0185W )
A high powered electric vehicle charging station consisting of the: (1) Installation of 2 No: Electric vehicle charging bays, and comprising a parking space and electric vehicle charging unit (2) Installation of a prefabricated ESB substation (3) Erection of associated signage (4) All associated lighting, infrastructure and site development works
Demolition of the single storey conservatory to the side of existing house; new vehicular access is proposed fronting and serving the existing dwelling house; the construction of a new two storey, detached 3 bed house to the side of existing house and all associated site development works. Proposals also provide for revised boundary treatments to sub-divide the site, including hard landscaping, connections to services and new vehicular & pedestrian access.
The development will consist of alterations to the existing east elevation to include the provision of a new external fire escape stairs to facilitate the internal subdivision of the existing office building, together with all associated site and ancillary works.
Conversion of the existing garage to habitable space including replacement of garage door with a new window, and for a single storey extension to the rear of the existing house and garage and associated site works
Residential development of 112 dwellings comprised of: 90 two storey houses consisting of 10 four bed detached houses, 2 three bed detached houses, 8 four bed semi-detached houses, 2 three bed detached houses, 8 four bed semi-detached houses, 42 three bed semi-detached houses and 28 three bed mid-terrace houses along with 22 one and two bed apartments in a four storey apartment building. The proposed development includes all associated site development and infrastructural works, car parking, bin storage, open spaces and landscaping. Access to the development will be via two vehicular entrances from Garter Avenue. All on a site of 3.74ha bounded to the east by the N82 Citywest Road, to the north-west by Garter Avenue and to the south by lands that will be developed as a Neighbourhood Park (permitted under Reg.Ref. SD15A/0127) in accordance with the Fortunestown Local Area Plan 2012.
We Kingscroft Development Limited seek Planning Permission for modifications to the granted permission (planning reg ref SD16A/0210) at the site west of Citywest Road (N82) South of Garter Avenue/Citywest Avenue, Citywest Dublin 24., The development site is bounded to the east by the N82 Citywest Road, to the North East by Garter Avenue and to the south by lands. The modifications include the change of use of the granted community floor space on the ground Floor of the granted 4 Storey Apartment Building to 1no 2 bed apartment unit and 1no 1 bed apartment unit. All with associated siteworks
Permission is sought for development comprising a) the provision of a single storey canopy with metal fascia and column to the carpark elevation of Block 2 at the south office entrance; b) extension of existing paved area (57 sqm) at the south office entrance; c) the proposed canopy will accommodate an area of 2 sqm for signage to the front and side elevation of the canopy and; d) relocation of 3 no. car parking spaces
Modifications to the granted permission (planning reg. ref. SD16A/0210). The proposed Modifications will consist of the addition of 6 No. apartment units (1 No. 1-bed unit,5 no. 2-bed units) on the third floor and set back floor plan on the Fourth Floor, Increasing the overall Apartment Block from 4-storeys to 5-storeys, and from 20 No. apartment units to 26 No. apartment units (consisting of 4 no. 1-bed units, 22 no. 2-bed units ) and 1 community floor space of 160 sqm. No modifications to as-granted 90 no. houses, The overall total no. of units in this development is now increased to 116. All with associated site works, Bin and Bike storage, the site layout has been modified slightly to accommodate additional surface car parking and other ancillary works.
Installation of up to 100kW (540sq.m) of roof mounted solar PV panels and all associated works.